Hilfe beim Zugang
Petrology of garnet — cordierite — sillimanite gneisses from the El Tormes thermal dome, Iberian Hercynian foldbelt (W Spain)
Abstract The core of the El Tormes thermal dome, situated in the central part of one of the main metamorphic belts of the Iberian Peninsula, is formed by garnet-cordierite-biotite-sillimanite pelitic gneisses. These rocks, that very often are cut by minor intrusions of Al-rich S-type granites, are m...
Ausführliche Beschreibung
Abstract The core of the El Tormes thermal dome, situated in the central part of one of the main metamorphic belts of the Iberian Peninsula, is formed by garnet-cordierite-biotite-sillimanite pelitic gneisses. These rocks, that very often are cut by minor intrusions of Al-rich S-type granites, are metatexitic gneisses in which there exists garnet showing different stages of resorption and transformation into an aggregate of cordierite±plagioclase±biotite. The garnet, mantled and corroded mainly by cordierite, has never been found to occur in contact with the prismatic sillimanite of the matrix, thus indicating that the continuous reaction Gr+Sill+Q = Cd has taken place. The presence of corroded biotite inside the garnet-rimming cordierite of the aggregates as well as inside the cordierite of the matrix, which usually includes remmants of sillimanite, indicates that the continuous reaction Bi+Sill+Q = Cd+FK+H2O has occurred too. Therefore, a realistic net reaction for these aggretates should be represented by the univariant, at a given $$X_{{\text{H}}_{\text{2}} {\text{O}}} $$ , equilibrium: Biotite+Sillimanite+Garnet+Quartz = Cordierite+K-feldspar+H2O (1) The important garnet resorption near the anatectic granitic veins implies that this process is favoured by a decrease in $$X_{{\text{H}}_{\text{2}} {\text{O}}} $$ , this factor being otherwise buffered by the reaction (1) assemblage. The most probable P-T path, assuming these conditions, consistent with the AFM projection of the former (inferred) and present assemblages in the aggregates and in the matrix, implies a decrease in P coeval with a decrease in T (Fig. 4, path 2). The most reliable P-T determination for the final stage of garnet breakdown through reaction (1), based on the coexistence of the seven phase assemblage garnet — cordierite — biotite — sillimanite — plagioclase — potash feldspar — quartz plus melt, gives 695° C, 4.3 kbar, $$X_{{\text{H}}_{\text{2}} {\text{O}}} $$ = 0.5, The maximum pressure for this process, obtained from the garnet — plagioclase equilibrium, is 6.5±1 kbar at the same temperature. The estimates of the T for the garnet core-garnet included biotite pairs are consistently lower, ca. 550° C, than those obtained for the garnet rim-biotite in aggregates, ca. 645° C, or garnet rim-adjacent cordierite pairs, ca. 695° C. It may, therefore, be supposed that, during their evolution these rocks underwent first an increase in T and then, during the last stages, as garnet and biotite brokedown, a decrease in P and T. This represents an uplift of the core of El Tormes dome under high grade amphibolite to low pressure granulite facies conditions, accompanied by a process of partial melting with local decrase in $$X_{{\text{H}}_{\text{2}} {\text{O}}} $$ . It is suggested, from mineral growth-deformation relationships, that this process took place during the late hercynian deformation phases, P-3 or doming stage. Ausführliche Beschreibung