Enhancing the MEP Coordination Process with BIM Technology and Management Strategies
Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP...
Ausführliche Beschreibung
Autor*in: |
Ya Hui Teo [verfasserIn] Jun Hong Yap [verfasserIn] Hui An [verfasserIn] Simon Ching Man Yu [verfasserIn] Limao Zhang [verfasserIn] Jie Chang [verfasserIn] Kang Hao Cheong [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2022 |
---|
Schlagwörter: |
Building Information Modeling (BIM) |
---|
Übergeordnetes Werk: |
In: Sensors - MDPI AG, 2003, 22(2022), 13, p 4936 |
---|---|
Übergeordnetes Werk: |
volume:22 ; year:2022 ; number:13, p 4936 |
Links: |
---|
DOI / URN: |
10.3390/s22134936 |
---|
Katalog-ID: |
DOAJ030100526 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ030100526 | ||
003 | DE-627 | ||
005 | 20240414133204.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230226s2022 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.3390/s22134936 |2 doi | |
035 | |a (DE-627)DOAJ030100526 | ||
035 | |a (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
050 | 0 | |a TP1-1185 | |
100 | 0 | |a Ya Hui Teo |e verfasserin |4 aut | |
245 | 1 | 0 | |a Enhancing the MEP Coordination Process with BIM Technology and Management Strategies |
264 | 1 | |c 2022 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. | ||
650 | 4 | |a Building Information Modeling (BIM) | |
650 | 4 | |a mechanical, electrical, and plumbing (MEP) services | |
650 | 4 | |a management strategies | |
650 | 4 | |a design modeling | |
650 | 4 | |a construction industry | |
650 | 4 | |a machine learning | |
653 | 0 | |a Chemical technology | |
700 | 0 | |a Jun Hong Yap |e verfasserin |4 aut | |
700 | 0 | |a Hui An |e verfasserin |4 aut | |
700 | 0 | |a Simon Ching Man Yu |e verfasserin |4 aut | |
700 | 0 | |a Limao Zhang |e verfasserin |4 aut | |
700 | 0 | |a Jie Chang |e verfasserin |4 aut | |
700 | 0 | |a Kang Hao Cheong |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t Sensors |d MDPI AG, 2003 |g 22(2022), 13, p 4936 |w (DE-627)331640910 |w (DE-600)2052857-7 |x 14248220 |7 nnns |
773 | 1 | 8 | |g volume:22 |g year:2022 |g number:13, p 4936 |
856 | 4 | 0 | |u https://doi.org/10.3390/s22134936 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f |z kostenfrei |
856 | 4 | 0 | |u https://www.mdpi.com/1424-8220/22/13/4936 |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/1424-8220 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_206 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2005 | ||
912 | |a GBV_ILN_2009 | ||
912 | |a GBV_ILN_2011 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_2057 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_2507 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 22 |j 2022 |e 13, p 4936 |
author_variant |
y h t yht j h y jhy h a ha s c m y scmy l z lz j c jc k h c khc |
---|---|
matchkey_str |
article:14248220:2022----::nacnteecodntopoesihitcnlgad |
hierarchy_sort_str |
2022 |
callnumber-subject-code |
TP |
publishDate |
2022 |
allfields |
10.3390/s22134936 doi (DE-627)DOAJ030100526 (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f DE-627 ger DE-627 rakwb eng TP1-1185 Ya Hui Teo verfasserin aut Enhancing the MEP Coordination Process with BIM Technology and Management Strategies 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning Chemical technology Jun Hong Yap verfasserin aut Hui An verfasserin aut Simon Ching Man Yu verfasserin aut Limao Zhang verfasserin aut Jie Chang verfasserin aut Kang Hao Cheong verfasserin aut In Sensors MDPI AG, 2003 22(2022), 13, p 4936 (DE-627)331640910 (DE-600)2052857-7 14248220 nnns volume:22 year:2022 number:13, p 4936 https://doi.org/10.3390/s22134936 kostenfrei https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f kostenfrei https://www.mdpi.com/1424-8220/22/13/4936 kostenfrei https://doaj.org/toc/1424-8220 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2057 GBV_ILN_2111 GBV_ILN_2507 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 22 2022 13, p 4936 |
spelling |
10.3390/s22134936 doi (DE-627)DOAJ030100526 (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f DE-627 ger DE-627 rakwb eng TP1-1185 Ya Hui Teo verfasserin aut Enhancing the MEP Coordination Process with BIM Technology and Management Strategies 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning Chemical technology Jun Hong Yap verfasserin aut Hui An verfasserin aut Simon Ching Man Yu verfasserin aut Limao Zhang verfasserin aut Jie Chang verfasserin aut Kang Hao Cheong verfasserin aut In Sensors MDPI AG, 2003 22(2022), 13, p 4936 (DE-627)331640910 (DE-600)2052857-7 14248220 nnns volume:22 year:2022 number:13, p 4936 https://doi.org/10.3390/s22134936 kostenfrei https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f kostenfrei https://www.mdpi.com/1424-8220/22/13/4936 kostenfrei https://doaj.org/toc/1424-8220 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2057 GBV_ILN_2111 GBV_ILN_2507 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 22 2022 13, p 4936 |
allfields_unstemmed |
10.3390/s22134936 doi (DE-627)DOAJ030100526 (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f DE-627 ger DE-627 rakwb eng TP1-1185 Ya Hui Teo verfasserin aut Enhancing the MEP Coordination Process with BIM Technology and Management Strategies 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning Chemical technology Jun Hong Yap verfasserin aut Hui An verfasserin aut Simon Ching Man Yu verfasserin aut Limao Zhang verfasserin aut Jie Chang verfasserin aut Kang Hao Cheong verfasserin aut In Sensors MDPI AG, 2003 22(2022), 13, p 4936 (DE-627)331640910 (DE-600)2052857-7 14248220 nnns volume:22 year:2022 number:13, p 4936 https://doi.org/10.3390/s22134936 kostenfrei https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f kostenfrei https://www.mdpi.com/1424-8220/22/13/4936 kostenfrei https://doaj.org/toc/1424-8220 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2057 GBV_ILN_2111 GBV_ILN_2507 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 22 2022 13, p 4936 |
allfieldsGer |
10.3390/s22134936 doi (DE-627)DOAJ030100526 (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f DE-627 ger DE-627 rakwb eng TP1-1185 Ya Hui Teo verfasserin aut Enhancing the MEP Coordination Process with BIM Technology and Management Strategies 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning Chemical technology Jun Hong Yap verfasserin aut Hui An verfasserin aut Simon Ching Man Yu verfasserin aut Limao Zhang verfasserin aut Jie Chang verfasserin aut Kang Hao Cheong verfasserin aut In Sensors MDPI AG, 2003 22(2022), 13, p 4936 (DE-627)331640910 (DE-600)2052857-7 14248220 nnns volume:22 year:2022 number:13, p 4936 https://doi.org/10.3390/s22134936 kostenfrei https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f kostenfrei https://www.mdpi.com/1424-8220/22/13/4936 kostenfrei https://doaj.org/toc/1424-8220 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2057 GBV_ILN_2111 GBV_ILN_2507 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 22 2022 13, p 4936 |
allfieldsSound |
10.3390/s22134936 doi (DE-627)DOAJ030100526 (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f DE-627 ger DE-627 rakwb eng TP1-1185 Ya Hui Teo verfasserin aut Enhancing the MEP Coordination Process with BIM Technology and Management Strategies 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning Chemical technology Jun Hong Yap verfasserin aut Hui An verfasserin aut Simon Ching Man Yu verfasserin aut Limao Zhang verfasserin aut Jie Chang verfasserin aut Kang Hao Cheong verfasserin aut In Sensors MDPI AG, 2003 22(2022), 13, p 4936 (DE-627)331640910 (DE-600)2052857-7 14248220 nnns volume:22 year:2022 number:13, p 4936 https://doi.org/10.3390/s22134936 kostenfrei https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f kostenfrei https://www.mdpi.com/1424-8220/22/13/4936 kostenfrei https://doaj.org/toc/1424-8220 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2057 GBV_ILN_2111 GBV_ILN_2507 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 22 2022 13, p 4936 |
language |
English |
source |
In Sensors 22(2022), 13, p 4936 volume:22 year:2022 number:13, p 4936 |
sourceStr |
In Sensors 22(2022), 13, p 4936 volume:22 year:2022 number:13, p 4936 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning Chemical technology |
isfreeaccess_bool |
true |
container_title |
Sensors |
authorswithroles_txt_mv |
Ya Hui Teo @@aut@@ Jun Hong Yap @@aut@@ Hui An @@aut@@ Simon Ching Man Yu @@aut@@ Limao Zhang @@aut@@ Jie Chang @@aut@@ Kang Hao Cheong @@aut@@ |
publishDateDaySort_date |
2022-01-01T00:00:00Z |
hierarchy_top_id |
331640910 |
id |
DOAJ030100526 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ030100526</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240414133204.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230226s2022 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/s22134936</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ030100526</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TP1-1185</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Ya Hui Teo</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Enhancing the MEP Coordination Process with BIM Technology and Management Strategies</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2022</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Building Information Modeling (BIM)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">mechanical, electrical, and plumbing (MEP) services</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">management strategies</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">design modeling</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">construction industry</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">machine learning</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Chemical technology</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Jun Hong Yap</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Hui An</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Simon Ching Man Yu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Limao Zhang</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Jie Chang</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Kang Hao Cheong</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Sensors</subfield><subfield code="d">MDPI AG, 2003</subfield><subfield code="g">22(2022), 13, p 4936</subfield><subfield code="w">(DE-627)331640910</subfield><subfield code="w">(DE-600)2052857-7</subfield><subfield code="x">14248220</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:22</subfield><subfield code="g">year:2022</subfield><subfield code="g">number:13, p 4936</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/s22134936</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/1424-8220/22/13/4936</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/1424-8220</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2057</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2507</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">22</subfield><subfield code="j">2022</subfield><subfield code="e">13, p 4936</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
Ya Hui Teo |
spellingShingle |
Ya Hui Teo misc TP1-1185 misc Building Information Modeling (BIM) misc mechanical, electrical, and plumbing (MEP) services misc management strategies misc design modeling misc construction industry misc machine learning misc Chemical technology Enhancing the MEP Coordination Process with BIM Technology and Management Strategies |
authorStr |
Ya Hui Teo |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)331640910 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut aut aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
TP1-1185 |
illustrated |
Not Illustrated |
issn |
14248220 |
topic_title |
TP1-1185 Enhancing the MEP Coordination Process with BIM Technology and Management Strategies Building Information Modeling (BIM) mechanical, electrical, and plumbing (MEP) services management strategies design modeling construction industry machine learning |
topic |
misc TP1-1185 misc Building Information Modeling (BIM) misc mechanical, electrical, and plumbing (MEP) services misc management strategies misc design modeling misc construction industry misc machine learning misc Chemical technology |
topic_unstemmed |
misc TP1-1185 misc Building Information Modeling (BIM) misc mechanical, electrical, and plumbing (MEP) services misc management strategies misc design modeling misc construction industry misc machine learning misc Chemical technology |
topic_browse |
misc TP1-1185 misc Building Information Modeling (BIM) misc mechanical, electrical, and plumbing (MEP) services misc management strategies misc design modeling misc construction industry misc machine learning misc Chemical technology |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Sensors |
hierarchy_parent_id |
331640910 |
hierarchy_top_title |
Sensors |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)331640910 (DE-600)2052857-7 |
title |
Enhancing the MEP Coordination Process with BIM Technology and Management Strategies |
ctrlnum |
(DE-627)DOAJ030100526 (DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f |
title_full |
Enhancing the MEP Coordination Process with BIM Technology and Management Strategies |
author_sort |
Ya Hui Teo |
journal |
Sensors |
journalStr |
Sensors |
callnumber-first-code |
T |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2022 |
contenttype_str_mv |
txt |
author_browse |
Ya Hui Teo Jun Hong Yap Hui An Simon Ching Man Yu Limao Zhang Jie Chang Kang Hao Cheong |
container_volume |
22 |
class |
TP1-1185 |
format_se |
Elektronische Aufsätze |
author-letter |
Ya Hui Teo |
doi_str_mv |
10.3390/s22134936 |
author2-role |
verfasserin |
title_sort |
enhancing the mep coordination process with bim technology and management strategies |
callnumber |
TP1-1185 |
title_auth |
Enhancing the MEP Coordination Process with BIM Technology and Management Strategies |
abstract |
Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. |
abstractGer |
Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. |
abstract_unstemmed |
Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2057 GBV_ILN_2111 GBV_ILN_2507 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
13, p 4936 |
title_short |
Enhancing the MEP Coordination Process with BIM Technology and Management Strategies |
url |
https://doi.org/10.3390/s22134936 https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f https://www.mdpi.com/1424-8220/22/13/4936 https://doaj.org/toc/1424-8220 |
remote_bool |
true |
author2 |
Jun Hong Yap Hui An Simon Ching Man Yu Limao Zhang Jie Chang Kang Hao Cheong |
author2Str |
Jun Hong Yap Hui An Simon Ching Man Yu Limao Zhang Jie Chang Kang Hao Cheong |
ppnlink |
331640910 |
callnumber-subject |
TP - Chemical Technology |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.3390/s22134936 |
callnumber-a |
TP1-1185 |
up_date |
2024-07-04T01:34:29.062Z |
_version_ |
1803610351538798592 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ030100526</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240414133204.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230226s2022 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/s22134936</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ030100526</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJec11bed0c0cb469d8f147ccdccd8cc3f</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TP1-1185</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Ya Hui Teo</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Enhancing the MEP Coordination Process with BIM Technology and Management Strategies</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2022</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Building Information Modeling (BIM) has been increasingly used in coordinating the different mechanical, electrical, and plumbing (MEP) services in the construction industries. As the construction industries are slowly adapting to BIM, the use of 2D software may become obsolete in the future as MEP services are technically more complicated to coordinate, due to respective services’ codes of practice to follow and limit ceiling height. The 3D MEP designs are easy to visualize before installing the respective MEP services on the construction site to prevent delay in the construction process. The aid of current advanced technology has brought BIM to the next level to reduce manual work through automation. Combining both innovative technology and suitable management methods not only improves the workflow in design coordination, but also decreases conflict on the construction site and lowers labor costs. Therefore, this paper tries to explore possible advance technology in BIM and management strategies that could help MEP services to increase productivity, accuracy, and efficiency with a lower cost of finalizing the design of the building. This will assist the contractors to complete construction works before the targeted schedule and meet the client’s expectations.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Building Information Modeling (BIM)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">mechanical, electrical, and plumbing (MEP) services</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">management strategies</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">design modeling</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">construction industry</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">machine learning</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Chemical technology</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Jun Hong Yap</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Hui An</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Simon Ching Man Yu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Limao Zhang</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Jie Chang</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Kang Hao Cheong</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Sensors</subfield><subfield code="d">MDPI AG, 2003</subfield><subfield code="g">22(2022), 13, p 4936</subfield><subfield code="w">(DE-627)331640910</subfield><subfield code="w">(DE-600)2052857-7</subfield><subfield code="x">14248220</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:22</subfield><subfield code="g">year:2022</subfield><subfield code="g">number:13, p 4936</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/s22134936</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/ec11bed0c0cb469d8f147ccdccd8cc3f</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/1424-8220/22/13/4936</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/1424-8220</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2057</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2507</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">22</subfield><subfield code="j">2022</subfield><subfield code="e">13, p 4936</subfield></datafield></record></collection>
|
score |
7.399699 |