Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment
Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and reg...
Ausführliche Beschreibung
Autor*in: |
José Luis Picard [verfasserIn] Irene Aguado [verfasserIn] Noemi G. Cobos [verfasserIn] Vicente Fuster-Roig [verfasserIn] Alfredo Quijano-López [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2021 |
---|
Schlagwörter: |
distributed energy resources (DER) |
---|
Übergeordnetes Werk: |
In: Energies - MDPI AG, 2008, 14(2021), 7, p 1924 |
---|---|
Übergeordnetes Werk: |
volume:14 ; year:2021 ; number:7, p 1924 |
Links: |
---|
DOI / URN: |
10.3390/en14071924 |
---|
Katalog-ID: |
DOAJ030378931 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ030378931 | ||
003 | DE-627 | ||
005 | 20240412185437.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230226s2021 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.3390/en14071924 |2 doi | |
035 | |a (DE-627)DOAJ030378931 | ||
035 | |a (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
100 | 0 | |a José Luis Picard |e verfasserin |4 aut | |
245 | 1 | 0 | |a Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment |
264 | 1 | |c 2021 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. | ||
650 | 4 | |a distributed energy resources (DER) | |
650 | 4 | |a distribution network planning | |
650 | 4 | |a distribution system operator (DSO) | |
650 | 4 | |a network investment analysis | |
650 | 4 | |a smart grids | |
653 | 0 | |a Technology | |
653 | 0 | |a T | |
700 | 0 | |a Irene Aguado |e verfasserin |4 aut | |
700 | 0 | |a Noemi G. Cobos |e verfasserin |4 aut | |
700 | 0 | |a Vicente Fuster-Roig |e verfasserin |4 aut | |
700 | 0 | |a Alfredo Quijano-López |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t Energies |d MDPI AG, 2008 |g 14(2021), 7, p 1924 |w (DE-627)572083742 |w (DE-600)2437446-5 |x 19961073 |7 nnns |
773 | 1 | 8 | |g volume:14 |g year:2021 |g number:7, p 1924 |
856 | 4 | 0 | |u https://doi.org/10.3390/en14071924 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 |z kostenfrei |
856 | 4 | 0 | |u https://www.mdpi.com/1996-1073/14/7/1924 |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/1996-1073 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_206 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2005 | ||
912 | |a GBV_ILN_2009 | ||
912 | |a GBV_ILN_2011 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_2108 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_2119 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 14 |j 2021 |e 7, p 1924 |
author_variant |
j l p jlp i a ia n g c ngc v f r vfr a q l aql |
---|---|
matchkey_str |
article:19961073:2021----::lcrcitiuinytmlnigehdlgcnieigitiueeegrsucscnrbt |
hierarchy_sort_str |
2021 |
publishDate |
2021 |
allfields |
10.3390/en14071924 doi (DE-627)DOAJ030378931 (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 DE-627 ger DE-627 rakwb eng José Luis Picard verfasserin aut Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids Technology T Irene Aguado verfasserin aut Noemi G. Cobos verfasserin aut Vicente Fuster-Roig verfasserin aut Alfredo Quijano-López verfasserin aut In Energies MDPI AG, 2008 14(2021), 7, p 1924 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:14 year:2021 number:7, p 1924 https://doi.org/10.3390/en14071924 kostenfrei https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 kostenfrei https://www.mdpi.com/1996-1073/14/7/1924 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2021 7, p 1924 |
spelling |
10.3390/en14071924 doi (DE-627)DOAJ030378931 (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 DE-627 ger DE-627 rakwb eng José Luis Picard verfasserin aut Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids Technology T Irene Aguado verfasserin aut Noemi G. Cobos verfasserin aut Vicente Fuster-Roig verfasserin aut Alfredo Quijano-López verfasserin aut In Energies MDPI AG, 2008 14(2021), 7, p 1924 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:14 year:2021 number:7, p 1924 https://doi.org/10.3390/en14071924 kostenfrei https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 kostenfrei https://www.mdpi.com/1996-1073/14/7/1924 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2021 7, p 1924 |
allfields_unstemmed |
10.3390/en14071924 doi (DE-627)DOAJ030378931 (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 DE-627 ger DE-627 rakwb eng José Luis Picard verfasserin aut Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids Technology T Irene Aguado verfasserin aut Noemi G. Cobos verfasserin aut Vicente Fuster-Roig verfasserin aut Alfredo Quijano-López verfasserin aut In Energies MDPI AG, 2008 14(2021), 7, p 1924 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:14 year:2021 number:7, p 1924 https://doi.org/10.3390/en14071924 kostenfrei https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 kostenfrei https://www.mdpi.com/1996-1073/14/7/1924 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2021 7, p 1924 |
allfieldsGer |
10.3390/en14071924 doi (DE-627)DOAJ030378931 (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 DE-627 ger DE-627 rakwb eng José Luis Picard verfasserin aut Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids Technology T Irene Aguado verfasserin aut Noemi G. Cobos verfasserin aut Vicente Fuster-Roig verfasserin aut Alfredo Quijano-López verfasserin aut In Energies MDPI AG, 2008 14(2021), 7, p 1924 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:14 year:2021 number:7, p 1924 https://doi.org/10.3390/en14071924 kostenfrei https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 kostenfrei https://www.mdpi.com/1996-1073/14/7/1924 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2021 7, p 1924 |
allfieldsSound |
10.3390/en14071924 doi (DE-627)DOAJ030378931 (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 DE-627 ger DE-627 rakwb eng José Luis Picard verfasserin aut Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids Technology T Irene Aguado verfasserin aut Noemi G. Cobos verfasserin aut Vicente Fuster-Roig verfasserin aut Alfredo Quijano-López verfasserin aut In Energies MDPI AG, 2008 14(2021), 7, p 1924 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:14 year:2021 number:7, p 1924 https://doi.org/10.3390/en14071924 kostenfrei https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 kostenfrei https://www.mdpi.com/1996-1073/14/7/1924 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2021 7, p 1924 |
language |
English |
source |
In Energies 14(2021), 7, p 1924 volume:14 year:2021 number:7, p 1924 |
sourceStr |
In Energies 14(2021), 7, p 1924 volume:14 year:2021 number:7, p 1924 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids Technology T |
isfreeaccess_bool |
true |
container_title |
Energies |
authorswithroles_txt_mv |
José Luis Picard @@aut@@ Irene Aguado @@aut@@ Noemi G. Cobos @@aut@@ Vicente Fuster-Roig @@aut@@ Alfredo Quijano-López @@aut@@ |
publishDateDaySort_date |
2021-01-01T00:00:00Z |
hierarchy_top_id |
572083742 |
id |
DOAJ030378931 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ030378931</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240412185437.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230226s2021 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/en14071924</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ030378931</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">José Luis Picard</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2021</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">distributed energy resources (DER)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">distribution network planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">distribution system operator (DSO)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">network investment analysis</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">smart grids</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Technology</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">T</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Irene Aguado</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Noemi G. Cobos</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Vicente Fuster-Roig</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Alfredo Quijano-López</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Energies</subfield><subfield code="d">MDPI AG, 2008</subfield><subfield code="g">14(2021), 7, p 1924</subfield><subfield code="w">(DE-627)572083742</subfield><subfield code="w">(DE-600)2437446-5</subfield><subfield code="x">19961073</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:14</subfield><subfield code="g">year:2021</subfield><subfield code="g">number:7, p 1924</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/en14071924</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/1996-1073/14/7/1924</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/1996-1073</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2108</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2119</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">14</subfield><subfield code="j">2021</subfield><subfield code="e">7, p 1924</subfield></datafield></record></collection>
|
author |
José Luis Picard |
spellingShingle |
José Luis Picard misc distributed energy resources (DER) misc distribution network planning misc distribution system operator (DSO) misc network investment analysis misc smart grids misc Technology misc T Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment |
authorStr |
José Luis Picard |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)572083742 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut aut aut |
collection |
DOAJ |
remote_str |
true |
illustrated |
Not Illustrated |
issn |
19961073 |
topic_title |
Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment distributed energy resources (DER) distribution network planning distribution system operator (DSO) network investment analysis smart grids |
topic |
misc distributed energy resources (DER) misc distribution network planning misc distribution system operator (DSO) misc network investment analysis misc smart grids misc Technology misc T |
topic_unstemmed |
misc distributed energy resources (DER) misc distribution network planning misc distribution system operator (DSO) misc network investment analysis misc smart grids misc Technology misc T |
topic_browse |
misc distributed energy resources (DER) misc distribution network planning misc distribution system operator (DSO) misc network investment analysis misc smart grids misc Technology misc T |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Energies |
hierarchy_parent_id |
572083742 |
hierarchy_top_title |
Energies |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)572083742 (DE-600)2437446-5 |
title |
Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment |
ctrlnum |
(DE-627)DOAJ030378931 (DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5 |
title_full |
Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment |
author_sort |
José Luis Picard |
journal |
Energies |
journalStr |
Energies |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2021 |
contenttype_str_mv |
txt |
author_browse |
José Luis Picard Irene Aguado Noemi G. Cobos Vicente Fuster-Roig Alfredo Quijano-López |
container_volume |
14 |
format_se |
Elektronische Aufsätze |
author-letter |
José Luis Picard |
doi_str_mv |
10.3390/en14071924 |
author2-role |
verfasserin |
title_sort |
electric distribution system planning methodology considering distributed energy resources: a contribution towards real smart grid deployment |
title_auth |
Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment |
abstract |
Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. |
abstractGer |
Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. |
abstract_unstemmed |
Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
7, p 1924 |
title_short |
Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment |
url |
https://doi.org/10.3390/en14071924 https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5 https://www.mdpi.com/1996-1073/14/7/1924 https://doaj.org/toc/1996-1073 |
remote_bool |
true |
author2 |
Irene Aguado Noemi G. Cobos Vicente Fuster-Roig Alfredo Quijano-López |
author2Str |
Irene Aguado Noemi G. Cobos Vicente Fuster-Roig Alfredo Quijano-López |
ppnlink |
572083742 |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.3390/en14071924 |
up_date |
2024-07-03T14:39:24.052Z |
_version_ |
1803569137254924288 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ030378931</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240412185437.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230226s2021 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/en14071924</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ030378931</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ7cbb4d04eb0740b48d9c554c545775f5</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">José Luis Picard</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Electric Distribution System Planning Methodology Considering Distributed Energy Resources: A Contribution towards Real Smart Grid Deployment</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2021</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Within the current context of energy transition, the first step to assure cost-efficient and reliable grid operations is the use of adequate planning tools. These tools must evaluate the real needs for reinforcing, replacing and incorporating new network assets considering not only technical and regulatory aspects but also the operational benefits that distributed energy resources (DER) may provide. With this purpose, this paper presents a novel methodology for the analysis and the advanced planning of the active distribution networks in the context of smart grids. The main contributions of the proposed methodology are the following: to incorporate the real capabilities of DER proactively to the planning and operation of distribution networks; to appropriately use the data available in current smart grids; and to promote the efficient use of network capacity in distribution level (efficiency decisions of its users, grid assets in service, access conditions, etc.) through potential operational services, variable in time. The proposed methodology was successfully tested on a real distribution network with 450,000 delivery points on a geographical area of 5000 km<sup<2</sup<.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">distributed energy resources (DER)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">distribution network planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">distribution system operator (DSO)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">network investment analysis</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">smart grids</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Technology</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">T</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Irene Aguado</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Noemi G. Cobos</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Vicente Fuster-Roig</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Alfredo Quijano-López</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Energies</subfield><subfield code="d">MDPI AG, 2008</subfield><subfield code="g">14(2021), 7, p 1924</subfield><subfield code="w">(DE-627)572083742</subfield><subfield code="w">(DE-600)2437446-5</subfield><subfield code="x">19961073</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:14</subfield><subfield code="g">year:2021</subfield><subfield code="g">number:7, p 1924</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/en14071924</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/7cbb4d04eb0740b48d9c554c545775f5</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/1996-1073/14/7/1924</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/1996-1073</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2108</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2119</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">14</subfield><subfield code="j">2021</subfield><subfield code="e">7, p 1924</subfield></datafield></record></collection>
|
score |
7.398121 |