Extended Reality for Smart Building Operation and Maintenance: A Review
The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the f...
Ausführliche Beschreibung
Autor*in: |
Marco Casini [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2022 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
In: Energies - MDPI AG, 2008, 15(2022), 10, p 3785 |
---|---|
Übergeordnetes Werk: |
volume:15 ; year:2022 ; number:10, p 3785 |
Links: |
---|
DOI / URN: |
10.3390/en15103785 |
---|
Katalog-ID: |
DOAJ032591888 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ032591888 | ||
003 | DE-627 | ||
005 | 20240414221839.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230226s2022 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.3390/en15103785 |2 doi | |
035 | |a (DE-627)DOAJ032591888 | ||
035 | |a (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
100 | 0 | |a Marco Casini |e verfasserin |4 aut | |
245 | 1 | 0 | |a Extended Reality for Smart Building Operation and Maintenance: A Review |
264 | 1 | |c 2022 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. | ||
650 | 4 | |a building operation and maintenance | |
650 | 4 | |a extended reality | |
650 | 4 | |a virtual reality | |
650 | 4 | |a augmented reality | |
650 | 4 | |a mixed reality | |
650 | 4 | |a immersive technologies | |
653 | 0 | |a Technology | |
653 | 0 | |a T | |
773 | 0 | 8 | |i In |t Energies |d MDPI AG, 2008 |g 15(2022), 10, p 3785 |w (DE-627)572083742 |w (DE-600)2437446-5 |x 19961073 |7 nnns |
773 | 1 | 8 | |g volume:15 |g year:2022 |g number:10, p 3785 |
856 | 4 | 0 | |u https://doi.org/10.3390/en15103785 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c |z kostenfrei |
856 | 4 | 0 | |u https://www.mdpi.com/1996-1073/15/10/3785 |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/1996-1073 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_206 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2005 | ||
912 | |a GBV_ILN_2009 | ||
912 | |a GBV_ILN_2011 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_2108 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_2119 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 15 |j 2022 |e 10, p 3785 |
author_variant |
m c mc |
---|---|
matchkey_str |
article:19961073:2022----::xeddeltfrmrbidnoeainnm |
hierarchy_sort_str |
2022 |
publishDate |
2022 |
allfields |
10.3390/en15103785 doi (DE-627)DOAJ032591888 (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c DE-627 ger DE-627 rakwb eng Marco Casini verfasserin aut Extended Reality for Smart Building Operation and Maintenance: A Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies Technology T In Energies MDPI AG, 2008 15(2022), 10, p 3785 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:15 year:2022 number:10, p 3785 https://doi.org/10.3390/en15103785 kostenfrei https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c kostenfrei https://www.mdpi.com/1996-1073/15/10/3785 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 15 2022 10, p 3785 |
spelling |
10.3390/en15103785 doi (DE-627)DOAJ032591888 (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c DE-627 ger DE-627 rakwb eng Marco Casini verfasserin aut Extended Reality for Smart Building Operation and Maintenance: A Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies Technology T In Energies MDPI AG, 2008 15(2022), 10, p 3785 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:15 year:2022 number:10, p 3785 https://doi.org/10.3390/en15103785 kostenfrei https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c kostenfrei https://www.mdpi.com/1996-1073/15/10/3785 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 15 2022 10, p 3785 |
allfields_unstemmed |
10.3390/en15103785 doi (DE-627)DOAJ032591888 (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c DE-627 ger DE-627 rakwb eng Marco Casini verfasserin aut Extended Reality for Smart Building Operation and Maintenance: A Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies Technology T In Energies MDPI AG, 2008 15(2022), 10, p 3785 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:15 year:2022 number:10, p 3785 https://doi.org/10.3390/en15103785 kostenfrei https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c kostenfrei https://www.mdpi.com/1996-1073/15/10/3785 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 15 2022 10, p 3785 |
allfieldsGer |
10.3390/en15103785 doi (DE-627)DOAJ032591888 (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c DE-627 ger DE-627 rakwb eng Marco Casini verfasserin aut Extended Reality for Smart Building Operation and Maintenance: A Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies Technology T In Energies MDPI AG, 2008 15(2022), 10, p 3785 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:15 year:2022 number:10, p 3785 https://doi.org/10.3390/en15103785 kostenfrei https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c kostenfrei https://www.mdpi.com/1996-1073/15/10/3785 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 15 2022 10, p 3785 |
allfieldsSound |
10.3390/en15103785 doi (DE-627)DOAJ032591888 (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c DE-627 ger DE-627 rakwb eng Marco Casini verfasserin aut Extended Reality for Smart Building Operation and Maintenance: A Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies Technology T In Energies MDPI AG, 2008 15(2022), 10, p 3785 (DE-627)572083742 (DE-600)2437446-5 19961073 nnns volume:15 year:2022 number:10, p 3785 https://doi.org/10.3390/en15103785 kostenfrei https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c kostenfrei https://www.mdpi.com/1996-1073/15/10/3785 kostenfrei https://doaj.org/toc/1996-1073 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 15 2022 10, p 3785 |
language |
English |
source |
In Energies 15(2022), 10, p 3785 volume:15 year:2022 number:10, p 3785 |
sourceStr |
In Energies 15(2022), 10, p 3785 volume:15 year:2022 number:10, p 3785 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies Technology T |
isfreeaccess_bool |
true |
container_title |
Energies |
authorswithroles_txt_mv |
Marco Casini @@aut@@ |
publishDateDaySort_date |
2022-01-01T00:00:00Z |
hierarchy_top_id |
572083742 |
id |
DOAJ032591888 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ032591888</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240414221839.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230226s2022 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/en15103785</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ032591888</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Marco Casini</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Extended Reality for Smart Building Operation and Maintenance: A Review</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2022</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">building operation and maintenance</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">extended reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">virtual reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">augmented reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">mixed reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">immersive technologies</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Technology</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">T</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Energies</subfield><subfield code="d">MDPI AG, 2008</subfield><subfield code="g">15(2022), 10, p 3785</subfield><subfield code="w">(DE-627)572083742</subfield><subfield code="w">(DE-600)2437446-5</subfield><subfield code="x">19961073</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:15</subfield><subfield code="g">year:2022</subfield><subfield code="g">number:10, p 3785</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/en15103785</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/1996-1073/15/10/3785</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/1996-1073</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2108</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2119</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">15</subfield><subfield code="j">2022</subfield><subfield code="e">10, p 3785</subfield></datafield></record></collection>
|
author |
Marco Casini |
spellingShingle |
Marco Casini misc building operation and maintenance misc extended reality misc virtual reality misc augmented reality misc mixed reality misc immersive technologies misc Technology misc T Extended Reality for Smart Building Operation and Maintenance: A Review |
authorStr |
Marco Casini |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)572083742 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut |
collection |
DOAJ |
remote_str |
true |
illustrated |
Not Illustrated |
issn |
19961073 |
topic_title |
Extended Reality for Smart Building Operation and Maintenance: A Review building operation and maintenance extended reality virtual reality augmented reality mixed reality immersive technologies |
topic |
misc building operation and maintenance misc extended reality misc virtual reality misc augmented reality misc mixed reality misc immersive technologies misc Technology misc T |
topic_unstemmed |
misc building operation and maintenance misc extended reality misc virtual reality misc augmented reality misc mixed reality misc immersive technologies misc Technology misc T |
topic_browse |
misc building operation and maintenance misc extended reality misc virtual reality misc augmented reality misc mixed reality misc immersive technologies misc Technology misc T |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Energies |
hierarchy_parent_id |
572083742 |
hierarchy_top_title |
Energies |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)572083742 (DE-600)2437446-5 |
title |
Extended Reality for Smart Building Operation and Maintenance: A Review |
ctrlnum |
(DE-627)DOAJ032591888 (DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c |
title_full |
Extended Reality for Smart Building Operation and Maintenance: A Review |
author_sort |
Marco Casini |
journal |
Energies |
journalStr |
Energies |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2022 |
contenttype_str_mv |
txt |
author_browse |
Marco Casini |
container_volume |
15 |
format_se |
Elektronische Aufsätze |
author-letter |
Marco Casini |
doi_str_mv |
10.3390/en15103785 |
title_sort |
extended reality for smart building operation and maintenance: a review |
title_auth |
Extended Reality for Smart Building Operation and Maintenance: A Review |
abstract |
The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. |
abstractGer |
The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. |
abstract_unstemmed |
The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2108 GBV_ILN_2111 GBV_ILN_2119 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
10, p 3785 |
title_short |
Extended Reality for Smart Building Operation and Maintenance: A Review |
url |
https://doi.org/10.3390/en15103785 https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c https://www.mdpi.com/1996-1073/15/10/3785 https://doaj.org/toc/1996-1073 |
remote_bool |
true |
ppnlink |
572083742 |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.3390/en15103785 |
up_date |
2024-07-04T01:46:52.989Z |
_version_ |
1803611131598602240 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ032591888</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240414221839.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230226s2022 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/en15103785</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ032591888</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ4cab49a6e1394704812733b2c7e2bb0c</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Marco Casini</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Extended Reality for Smart Building Operation and Maintenance: A Review</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2022</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The operation and maintenance (O&M) of buildings and infrastructure represent a strategic activity to ensure they perform as expected over time and to reduce energy consumption and maintenance costs at the urban and building scale. With the increasing diffusion of BIM, IoT devices, and AI, the future of O&M is represented by digital twin technology. To effectively take advantage of this digital revolution, thus enabling data-driven energy control, proactive maintenance, and predictive daily operations, it is vital that smart building management exploits the opportunities offered by the extended reality (XR) technologies. Nevertheless, in consideration of the novelty of XR in the AECO sector and its rapid and ongoing evolution, knowledge of the specific possibilities and the methods of integration into the building process workflow is still piecemeal and sparse. With the goal to bridge this gap, the article presents a thorough review of virtual reality (VR), augmented reality (AR), and mixed reality (MR) technologies and applications for smart building operation and maintenance. After defining VR, AR, and MR, the article provides a detailed review that analyzes, categorizes, and summarizes state-of-the-art XR technologies and their possible applications for building O&M along with their relative advantages and disadvantages. The article concludes that the application of XR in building and city management is showing promising results in enhancing human performance in technical O&M tasks, in understanding and controlling the energy efficiency, comfort, and safety of building and infrastructures, and in supporting strategic decision making for the future smart city.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">building operation and maintenance</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">extended reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">virtual reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">augmented reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">mixed reality</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">immersive technologies</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Technology</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">T</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Energies</subfield><subfield code="d">MDPI AG, 2008</subfield><subfield code="g">15(2022), 10, p 3785</subfield><subfield code="w">(DE-627)572083742</subfield><subfield code="w">(DE-600)2437446-5</subfield><subfield code="x">19961073</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:15</subfield><subfield code="g">year:2022</subfield><subfield code="g">number:10, p 3785</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/en15103785</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/4cab49a6e1394704812733b2c7e2bb0c</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/1996-1073/15/10/3785</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/1996-1073</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2108</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2119</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">15</subfield><subfield code="j">2022</subfield><subfield code="e">10, p 3785</subfield></datafield></record></collection>
|
score |
7.4008045 |