Utilization of BIM in Steel Building Projects: A Systematic Literature Review
This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, a...
Ausführliche Beschreibung
Autor*in: |
José Ignacio Avendaño [verfasserIn] Sisi Zlatanova [verfasserIn] Alberto Domingo [verfasserIn] Pedro Pérez [verfasserIn] Christian Correa [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2022 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
In: Buildings - MDPI AG, 2012, 12(2022), 6, p 713 |
---|---|
Übergeordnetes Werk: |
volume:12 ; year:2022 ; number:6, p 713 |
Links: |
---|
DOI / URN: |
10.3390/buildings12060713 |
---|
Katalog-ID: |
DOAJ04396592X |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ04396592X | ||
003 | DE-627 | ||
005 | 20240414205117.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230227s2022 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.3390/buildings12060713 |2 doi | |
035 | |a (DE-627)DOAJ04396592X | ||
035 | |a (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
050 | 0 | |a TH1-9745 | |
100 | 0 | |a José Ignacio Avendaño |e verfasserin |4 aut | |
245 | 1 | 0 | |a Utilization of BIM in Steel Building Projects: A Systematic Literature Review |
264 | 1 | |c 2022 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. | ||
650 | 4 | |a building information modeling (BIM) | |
650 | 4 | |a steel project life cycle | |
650 | 4 | |a project management | |
650 | 4 | |a communication in steel construction projects | |
653 | 0 | |a Building construction | |
700 | 0 | |a Sisi Zlatanova |e verfasserin |4 aut | |
700 | 0 | |a Alberto Domingo |e verfasserin |4 aut | |
700 | 0 | |a Pedro Pérez |e verfasserin |4 aut | |
700 | 0 | |a Christian Correa |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t Buildings |d MDPI AG, 2012 |g 12(2022), 6, p 713 |w (DE-627)718622251 |w (DE-600)2661539-3 |x 20755309 |7 nnns |
773 | 1 | 8 | |g volume:12 |g year:2022 |g number:6, p 713 |
856 | 4 | 0 | |u https://doi.org/10.3390/buildings12060713 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 |z kostenfrei |
856 | 4 | 0 | |u https://www.mdpi.com/2075-5309/12/6/713 |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2075-5309 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_11 | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4392 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 12 |j 2022 |e 6, p 713 |
author_variant |
j i a jia s z sz a d ad p p pp c c cc |
---|---|
matchkey_str |
article:20755309:2022----::tlztoobmntebidnpoetaytmt |
hierarchy_sort_str |
2022 |
callnumber-subject-code |
TH |
publishDate |
2022 |
allfields |
10.3390/buildings12060713 doi (DE-627)DOAJ04396592X (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 DE-627 ger DE-627 rakwb eng TH1-9745 José Ignacio Avendaño verfasserin aut Utilization of BIM in Steel Building Projects: A Systematic Literature Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. building information modeling (BIM) steel project life cycle project management communication in steel construction projects Building construction Sisi Zlatanova verfasserin aut Alberto Domingo verfasserin aut Pedro Pérez verfasserin aut Christian Correa verfasserin aut In Buildings MDPI AG, 2012 12(2022), 6, p 713 (DE-627)718622251 (DE-600)2661539-3 20755309 nnns volume:12 year:2022 number:6, p 713 https://doi.org/10.3390/buildings12060713 kostenfrei https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 kostenfrei https://www.mdpi.com/2075-5309/12/6/713 kostenfrei https://doaj.org/toc/2075-5309 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4392 GBV_ILN_4700 AR 12 2022 6, p 713 |
spelling |
10.3390/buildings12060713 doi (DE-627)DOAJ04396592X (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 DE-627 ger DE-627 rakwb eng TH1-9745 José Ignacio Avendaño verfasserin aut Utilization of BIM in Steel Building Projects: A Systematic Literature Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. building information modeling (BIM) steel project life cycle project management communication in steel construction projects Building construction Sisi Zlatanova verfasserin aut Alberto Domingo verfasserin aut Pedro Pérez verfasserin aut Christian Correa verfasserin aut In Buildings MDPI AG, 2012 12(2022), 6, p 713 (DE-627)718622251 (DE-600)2661539-3 20755309 nnns volume:12 year:2022 number:6, p 713 https://doi.org/10.3390/buildings12060713 kostenfrei https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 kostenfrei https://www.mdpi.com/2075-5309/12/6/713 kostenfrei https://doaj.org/toc/2075-5309 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4392 GBV_ILN_4700 AR 12 2022 6, p 713 |
allfields_unstemmed |
10.3390/buildings12060713 doi (DE-627)DOAJ04396592X (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 DE-627 ger DE-627 rakwb eng TH1-9745 José Ignacio Avendaño verfasserin aut Utilization of BIM in Steel Building Projects: A Systematic Literature Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. building information modeling (BIM) steel project life cycle project management communication in steel construction projects Building construction Sisi Zlatanova verfasserin aut Alberto Domingo verfasserin aut Pedro Pérez verfasserin aut Christian Correa verfasserin aut In Buildings MDPI AG, 2012 12(2022), 6, p 713 (DE-627)718622251 (DE-600)2661539-3 20755309 nnns volume:12 year:2022 number:6, p 713 https://doi.org/10.3390/buildings12060713 kostenfrei https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 kostenfrei https://www.mdpi.com/2075-5309/12/6/713 kostenfrei https://doaj.org/toc/2075-5309 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4392 GBV_ILN_4700 AR 12 2022 6, p 713 |
allfieldsGer |
10.3390/buildings12060713 doi (DE-627)DOAJ04396592X (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 DE-627 ger DE-627 rakwb eng TH1-9745 José Ignacio Avendaño verfasserin aut Utilization of BIM in Steel Building Projects: A Systematic Literature Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. building information modeling (BIM) steel project life cycle project management communication in steel construction projects Building construction Sisi Zlatanova verfasserin aut Alberto Domingo verfasserin aut Pedro Pérez verfasserin aut Christian Correa verfasserin aut In Buildings MDPI AG, 2012 12(2022), 6, p 713 (DE-627)718622251 (DE-600)2661539-3 20755309 nnns volume:12 year:2022 number:6, p 713 https://doi.org/10.3390/buildings12060713 kostenfrei https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 kostenfrei https://www.mdpi.com/2075-5309/12/6/713 kostenfrei https://doaj.org/toc/2075-5309 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4392 GBV_ILN_4700 AR 12 2022 6, p 713 |
allfieldsSound |
10.3390/buildings12060713 doi (DE-627)DOAJ04396592X (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 DE-627 ger DE-627 rakwb eng TH1-9745 José Ignacio Avendaño verfasserin aut Utilization of BIM in Steel Building Projects: A Systematic Literature Review 2022 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. building information modeling (BIM) steel project life cycle project management communication in steel construction projects Building construction Sisi Zlatanova verfasserin aut Alberto Domingo verfasserin aut Pedro Pérez verfasserin aut Christian Correa verfasserin aut In Buildings MDPI AG, 2012 12(2022), 6, p 713 (DE-627)718622251 (DE-600)2661539-3 20755309 nnns volume:12 year:2022 number:6, p 713 https://doi.org/10.3390/buildings12060713 kostenfrei https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 kostenfrei https://www.mdpi.com/2075-5309/12/6/713 kostenfrei https://doaj.org/toc/2075-5309 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4392 GBV_ILN_4700 AR 12 2022 6, p 713 |
language |
English |
source |
In Buildings 12(2022), 6, p 713 volume:12 year:2022 number:6, p 713 |
sourceStr |
In Buildings 12(2022), 6, p 713 volume:12 year:2022 number:6, p 713 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
building information modeling (BIM) steel project life cycle project management communication in steel construction projects Building construction |
isfreeaccess_bool |
true |
container_title |
Buildings |
authorswithroles_txt_mv |
José Ignacio Avendaño @@aut@@ Sisi Zlatanova @@aut@@ Alberto Domingo @@aut@@ Pedro Pérez @@aut@@ Christian Correa @@aut@@ |
publishDateDaySort_date |
2022-01-01T00:00:00Z |
hierarchy_top_id |
718622251 |
id |
DOAJ04396592X |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ04396592X</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240414205117.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2022 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/buildings12060713</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ04396592X</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TH1-9745</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">José Ignacio Avendaño</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Utilization of BIM in Steel Building Projects: A Systematic Literature Review</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2022</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">building information modeling (BIM)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">steel project life cycle</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">project management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">communication in steel construction projects</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Building construction</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Sisi Zlatanova</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Alberto Domingo</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Pedro Pérez</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Christian Correa</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Buildings</subfield><subfield code="d">MDPI AG, 2012</subfield><subfield code="g">12(2022), 6, p 713</subfield><subfield code="w">(DE-627)718622251</subfield><subfield code="w">(DE-600)2661539-3</subfield><subfield code="x">20755309</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:12</subfield><subfield code="g">year:2022</subfield><subfield code="g">number:6, p 713</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/buildings12060713</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/2075-5309/12/6/713</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2075-5309</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_11</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4392</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">12</subfield><subfield code="j">2022</subfield><subfield code="e">6, p 713</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
José Ignacio Avendaño |
spellingShingle |
José Ignacio Avendaño misc TH1-9745 misc building information modeling (BIM) misc steel project life cycle misc project management misc communication in steel construction projects misc Building construction Utilization of BIM in Steel Building Projects: A Systematic Literature Review |
authorStr |
José Ignacio Avendaño |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)718622251 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
TH1-9745 |
illustrated |
Not Illustrated |
issn |
20755309 |
topic_title |
TH1-9745 Utilization of BIM in Steel Building Projects: A Systematic Literature Review building information modeling (BIM) steel project life cycle project management communication in steel construction projects |
topic |
misc TH1-9745 misc building information modeling (BIM) misc steel project life cycle misc project management misc communication in steel construction projects misc Building construction |
topic_unstemmed |
misc TH1-9745 misc building information modeling (BIM) misc steel project life cycle misc project management misc communication in steel construction projects misc Building construction |
topic_browse |
misc TH1-9745 misc building information modeling (BIM) misc steel project life cycle misc project management misc communication in steel construction projects misc Building construction |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Buildings |
hierarchy_parent_id |
718622251 |
hierarchy_top_title |
Buildings |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)718622251 (DE-600)2661539-3 |
title |
Utilization of BIM in Steel Building Projects: A Systematic Literature Review |
ctrlnum |
(DE-627)DOAJ04396592X (DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3 |
title_full |
Utilization of BIM in Steel Building Projects: A Systematic Literature Review |
author_sort |
José Ignacio Avendaño |
journal |
Buildings |
journalStr |
Buildings |
callnumber-first-code |
T |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2022 |
contenttype_str_mv |
txt |
author_browse |
José Ignacio Avendaño Sisi Zlatanova Alberto Domingo Pedro Pérez Christian Correa |
container_volume |
12 |
class |
TH1-9745 |
format_se |
Elektronische Aufsätze |
author-letter |
José Ignacio Avendaño |
doi_str_mv |
10.3390/buildings12060713 |
author2-role |
verfasserin |
title_sort |
utilization of bim in steel building projects: a systematic literature review |
callnumber |
TH1-9745 |
title_auth |
Utilization of BIM in Steel Building Projects: A Systematic Literature Review |
abstract |
This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. |
abstractGer |
This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. |
abstract_unstemmed |
This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4392 GBV_ILN_4700 |
container_issue |
6, p 713 |
title_short |
Utilization of BIM in Steel Building Projects: A Systematic Literature Review |
url |
https://doi.org/10.3390/buildings12060713 https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3 https://www.mdpi.com/2075-5309/12/6/713 https://doaj.org/toc/2075-5309 |
remote_bool |
true |
author2 |
Sisi Zlatanova Alberto Domingo Pedro Pérez Christian Correa |
author2Str |
Sisi Zlatanova Alberto Domingo Pedro Pérez Christian Correa |
ppnlink |
718622251 |
callnumber-subject |
TH - Building Construction |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.3390/buildings12060713 |
callnumber-a |
TH1-9745 |
up_date |
2024-07-03T20:27:15.198Z |
_version_ |
1803591022228275200 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ04396592X</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20240414205117.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2022 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.3390/buildings12060713</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ04396592X</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ198e4eb2879c476bbf72ee3616d048a3</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TH1-9745</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">José Ignacio Avendaño</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Utilization of BIM in Steel Building Projects: A Systematic Literature Review</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2022</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This research aims to bridge the information gap pertaining to the utilization of building information modeling (BIM) in steel building projects. Therefore, a systematic literature review (SLR) was conducted to synthesize the available uses. This research involved three phases—planning, execution, and reporting—according to the PRISMA guide, which includes the main aspects of identification, screening, and eligibility. As a result of the SLR, it is evident how and where BIM facilitates steel building projects, which were grouped into three different categories according to their main BIM topics. One of the uses that stands out as a common denominator across the different processes is “early integration”. Early integration allows for optimization of the design based on existing resources, directly affecting the cost and time of steel building projects in a positive manner.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">building information modeling (BIM)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">steel project life cycle</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">project management</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">communication in steel construction projects</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Building construction</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Sisi Zlatanova</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Alberto Domingo</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Pedro Pérez</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Christian Correa</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Buildings</subfield><subfield code="d">MDPI AG, 2012</subfield><subfield code="g">12(2022), 6, p 713</subfield><subfield code="w">(DE-627)718622251</subfield><subfield code="w">(DE-600)2661539-3</subfield><subfield code="x">20755309</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:12</subfield><subfield code="g">year:2022</subfield><subfield code="g">number:6, p 713</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.3390/buildings12060713</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/198e4eb2879c476bbf72ee3616d048a3</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://www.mdpi.com/2075-5309/12/6/713</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2075-5309</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_11</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4392</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">12</subfield><subfield code="j">2022</subfield><subfield code="e">6, p 713</subfield></datafield></record></collection>
|
score |
7.399625 |