Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System
The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and M...
Ausführliche Beschreibung
Autor*in: |
Jinbiao Chen [verfasserIn] Chaojian Shi [verfasserIn] Dongxing Jia [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2014 |
---|
Schlagwörter: |
Formal Safety Assessment (FSA) |
---|
Übergeordnetes Werk: |
In: TransNav: International Journal on Marine Navigation and Safety of Sea Transportation - Gdynia Maritime University, 2013, 8(2014), 2, Seite 197-203 |
---|---|
Übergeordnetes Werk: |
volume:8 ; year:2014 ; number:2 ; pages:197-203 |
Links: |
Link aufrufen |
---|
DOI / URN: |
10.12716/1001.08.02.04 |
---|
Katalog-ID: |
DOAJ050866753 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ050866753 | ||
003 | DE-627 | ||
005 | 20230502114226.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230227s2014 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.12716/1001.08.02.04 |2 doi | |
035 | |a (DE-627)DOAJ050866753 | ||
035 | |a (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
050 | 0 | |a TC601-791 | |
050 | 0 | |a HE1-9990 | |
100 | 0 | |a Jinbiao Chen |e verfasserin |4 aut | |
245 | 1 | 0 | |a Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System |
264 | 1 | |c 2014 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. | ||
650 | 4 | |a Risk Assessment | |
650 | 4 | |a Real-Time Risk Assessment | |
650 | 4 | |a Formal Safety Assessment (FSA) | |
650 | 4 | |a Fuzzy-FSA | |
650 | 4 | |a Aids to Navigation (AtoN) | |
650 | 4 | |a Three-Dimensional Simulation System | |
650 | 4 | |a Quantitative Standard | |
650 | 4 | |a Yangtze River Estuary | |
653 | 0 | |a Canals and inland navigation. Waterways | |
653 | 0 | |a Transportation and communications | |
700 | 0 | |a Chaojian Shi |e verfasserin |4 aut | |
700 | 0 | |a Dongxing Jia |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |d Gdynia Maritime University, 2013 |g 8(2014), 2, Seite 197-203 |w (DE-627)79168475X |w (DE-600)2780511-6 |x 20836481 |7 nnns |
773 | 1 | 8 | |g volume:8 |g year:2014 |g number:2 |g pages:197-203 |
856 | 4 | 0 | |u https://doi.org/10.12716/1001.08.02.04 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 |z kostenfrei |
856 | 4 | 0 | |u http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2083-6473 |y Journal toc |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2083-6481 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a SSG-OLC-PHA | ||
912 | |a GBV_ILN_11 | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2005 | ||
912 | |a GBV_ILN_2009 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 8 |j 2014 |e 2 |h 197-203 |
author_variant |
j c jc c s cs d j dj |
---|---|
matchkey_str |
article:20836481:2014----::elieiksesetoadtnvgtouiguzfanhedmn |
hierarchy_sort_str |
2014 |
callnumber-subject-code |
TC |
publishDate |
2014 |
allfields |
10.12716/1001.08.02.04 doi (DE-627)DOAJ050866753 (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 DE-627 ger DE-627 rakwb eng TC601-791 HE1-9990 Jinbiao Chen verfasserin aut Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary Canals and inland navigation. Waterways Transportation and communications Chaojian Shi verfasserin aut Dongxing Jia verfasserin aut In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation Gdynia Maritime University, 2013 8(2014), 2, Seite 197-203 (DE-627)79168475X (DE-600)2780511-6 20836481 nnns volume:8 year:2014 number:2 pages:197-203 https://doi.org/10.12716/1001.08.02.04 kostenfrei https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 kostenfrei http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf kostenfrei https://doaj.org/toc/2083-6473 Journal toc kostenfrei https://doaj.org/toc/2083-6481 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2014 2 197-203 |
spelling |
10.12716/1001.08.02.04 doi (DE-627)DOAJ050866753 (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 DE-627 ger DE-627 rakwb eng TC601-791 HE1-9990 Jinbiao Chen verfasserin aut Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary Canals and inland navigation. Waterways Transportation and communications Chaojian Shi verfasserin aut Dongxing Jia verfasserin aut In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation Gdynia Maritime University, 2013 8(2014), 2, Seite 197-203 (DE-627)79168475X (DE-600)2780511-6 20836481 nnns volume:8 year:2014 number:2 pages:197-203 https://doi.org/10.12716/1001.08.02.04 kostenfrei https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 kostenfrei http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf kostenfrei https://doaj.org/toc/2083-6473 Journal toc kostenfrei https://doaj.org/toc/2083-6481 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2014 2 197-203 |
allfields_unstemmed |
10.12716/1001.08.02.04 doi (DE-627)DOAJ050866753 (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 DE-627 ger DE-627 rakwb eng TC601-791 HE1-9990 Jinbiao Chen verfasserin aut Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary Canals and inland navigation. Waterways Transportation and communications Chaojian Shi verfasserin aut Dongxing Jia verfasserin aut In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation Gdynia Maritime University, 2013 8(2014), 2, Seite 197-203 (DE-627)79168475X (DE-600)2780511-6 20836481 nnns volume:8 year:2014 number:2 pages:197-203 https://doi.org/10.12716/1001.08.02.04 kostenfrei https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 kostenfrei http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf kostenfrei https://doaj.org/toc/2083-6473 Journal toc kostenfrei https://doaj.org/toc/2083-6481 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2014 2 197-203 |
allfieldsGer |
10.12716/1001.08.02.04 doi (DE-627)DOAJ050866753 (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 DE-627 ger DE-627 rakwb eng TC601-791 HE1-9990 Jinbiao Chen verfasserin aut Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary Canals and inland navigation. Waterways Transportation and communications Chaojian Shi verfasserin aut Dongxing Jia verfasserin aut In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation Gdynia Maritime University, 2013 8(2014), 2, Seite 197-203 (DE-627)79168475X (DE-600)2780511-6 20836481 nnns volume:8 year:2014 number:2 pages:197-203 https://doi.org/10.12716/1001.08.02.04 kostenfrei https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 kostenfrei http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf kostenfrei https://doaj.org/toc/2083-6473 Journal toc kostenfrei https://doaj.org/toc/2083-6481 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2014 2 197-203 |
allfieldsSound |
10.12716/1001.08.02.04 doi (DE-627)DOAJ050866753 (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 DE-627 ger DE-627 rakwb eng TC601-791 HE1-9990 Jinbiao Chen verfasserin aut Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary Canals and inland navigation. Waterways Transportation and communications Chaojian Shi verfasserin aut Dongxing Jia verfasserin aut In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation Gdynia Maritime University, 2013 8(2014), 2, Seite 197-203 (DE-627)79168475X (DE-600)2780511-6 20836481 nnns volume:8 year:2014 number:2 pages:197-203 https://doi.org/10.12716/1001.08.02.04 kostenfrei https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 kostenfrei http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf kostenfrei https://doaj.org/toc/2083-6473 Journal toc kostenfrei https://doaj.org/toc/2083-6481 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2014 2 197-203 |
language |
English |
source |
In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation 8(2014), 2, Seite 197-203 volume:8 year:2014 number:2 pages:197-203 |
sourceStr |
In TransNav: International Journal on Marine Navigation and Safety of Sea Transportation 8(2014), 2, Seite 197-203 volume:8 year:2014 number:2 pages:197-203 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary Canals and inland navigation. Waterways Transportation and communications |
isfreeaccess_bool |
true |
container_title |
TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
authorswithroles_txt_mv |
Jinbiao Chen @@aut@@ Chaojian Shi @@aut@@ Dongxing Jia @@aut@@ |
publishDateDaySort_date |
2014-01-01T00:00:00Z |
hierarchy_top_id |
79168475X |
id |
DOAJ050866753 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ050866753</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230502114226.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2014 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.12716/1001.08.02.04</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ050866753</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TC601-791</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">HE1-9990</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Jinbiao Chen</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2014</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Risk Assessment</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Real-Time Risk Assessment</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Formal Safety Assessment (FSA)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Fuzzy-FSA</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Aids to Navigation (AtoN)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Three-Dimensional Simulation System</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Quantitative Standard</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Yangtze River Estuary</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Canals and inland navigation. Waterways</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Transportation and communications</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Chaojian Shi</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Dongxing Jia</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">TransNav: International Journal on Marine Navigation and Safety of Sea Transportation</subfield><subfield code="d">Gdynia Maritime University, 2013</subfield><subfield code="g">8(2014), 2, Seite 197-203</subfield><subfield code="w">(DE-627)79168475X</subfield><subfield code="w">(DE-600)2780511-6</subfield><subfield code="x">20836481</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:8</subfield><subfield code="g">year:2014</subfield><subfield code="g">number:2</subfield><subfield code="g">pages:197-203</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.12716/1001.08.02.04</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2083-6473</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2083-6481</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHA</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_11</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">8</subfield><subfield code="j">2014</subfield><subfield code="e">2</subfield><subfield code="h">197-203</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
Jinbiao Chen |
spellingShingle |
Jinbiao Chen misc TC601-791 misc HE1-9990 misc Risk Assessment misc Real-Time Risk Assessment misc Formal Safety Assessment (FSA) misc Fuzzy-FSA misc Aids to Navigation (AtoN) misc Three-Dimensional Simulation System misc Quantitative Standard misc Yangtze River Estuary misc Canals and inland navigation. Waterways misc Transportation and communications Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System |
authorStr |
Jinbiao Chen |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)79168475X |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
TC601-791 |
illustrated |
Not Illustrated |
issn |
20836481 |
topic_title |
TC601-791 HE1-9990 Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System Risk Assessment Real-Time Risk Assessment Formal Safety Assessment (FSA) Fuzzy-FSA Aids to Navigation (AtoN) Three-Dimensional Simulation System Quantitative Standard Yangtze River Estuary |
topic |
misc TC601-791 misc HE1-9990 misc Risk Assessment misc Real-Time Risk Assessment misc Formal Safety Assessment (FSA) misc Fuzzy-FSA misc Aids to Navigation (AtoN) misc Three-Dimensional Simulation System misc Quantitative Standard misc Yangtze River Estuary misc Canals and inland navigation. Waterways misc Transportation and communications |
topic_unstemmed |
misc TC601-791 misc HE1-9990 misc Risk Assessment misc Real-Time Risk Assessment misc Formal Safety Assessment (FSA) misc Fuzzy-FSA misc Aids to Navigation (AtoN) misc Three-Dimensional Simulation System misc Quantitative Standard misc Yangtze River Estuary misc Canals and inland navigation. Waterways misc Transportation and communications |
topic_browse |
misc TC601-791 misc HE1-9990 misc Risk Assessment misc Real-Time Risk Assessment misc Formal Safety Assessment (FSA) misc Fuzzy-FSA misc Aids to Navigation (AtoN) misc Three-Dimensional Simulation System misc Quantitative Standard misc Yangtze River Estuary misc Canals and inland navigation. Waterways misc Transportation and communications |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
hierarchy_parent_id |
79168475X |
hierarchy_top_title |
TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)79168475X (DE-600)2780511-6 |
title |
Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System |
ctrlnum |
(DE-627)DOAJ050866753 (DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7 |
title_full |
Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System |
author_sort |
Jinbiao Chen |
journal |
TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
journalStr |
TransNav: International Journal on Marine Navigation and Safety of Sea Transportation |
callnumber-first-code |
T |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2014 |
contenttype_str_mv |
txt |
container_start_page |
197 |
author_browse |
Jinbiao Chen Chaojian Shi Dongxing Jia |
container_volume |
8 |
class |
TC601-791 HE1-9990 |
format_se |
Elektronische Aufsätze |
author-letter |
Jinbiao Chen |
doi_str_mv |
10.12716/1001.08.02.04 |
author2-role |
verfasserin |
title_sort |
real-time risk assessment for aids to navigation using fuzzy-fsa on three-dimensional simulation system |
callnumber |
TC601-791 |
title_auth |
Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System |
abstract |
The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. |
abstractGer |
The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. |
abstract_unstemmed |
The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2005 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
2 |
title_short |
Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System |
url |
https://doi.org/10.12716/1001.08.02.04 https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7 http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf https://doaj.org/toc/2083-6473 https://doaj.org/toc/2083-6481 |
remote_bool |
true |
author2 |
Chaojian Shi Dongxing Jia |
author2Str |
Chaojian Shi Dongxing Jia |
ppnlink |
79168475X |
callnumber-subject |
TC - Hydraulic and Ocean Engineering |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.12716/1001.08.02.04 |
callnumber-a |
TC601-791 |
up_date |
2024-07-03T17:10:38.392Z |
_version_ |
1803578652379578368 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ050866753</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230502114226.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2014 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.12716/1001.08.02.04</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ050866753</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ04e23cca23114fac801e5a2e9db0fbd7</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TC601-791</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">HE1-9990</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Jinbiao Chen</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2014</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The risk level of the Aids to Navigation (AtoNs) can reflect the ship navigation safety level in the channel to some extent. In order to appreciate the risk level of the aids to navigation (AtoNs) in a navigation channel and to provide some decision-making suggestions for the AtoNs Maintenance and Management Department, the risk assessment index system of the AtoNs was built considering the advanced experience of IALA. Under the Formal Safety Assessment frame, taking the advantages of the fuzzy comprehensive evaluation method, the fuzzy-FSA model of risk assessment for aids to navigation was established. The model was implemented for the assessment of aids to navigation in Shanghai area based on the aids to navigation three-dimensional simulation system. The real-time data were extracted from the existing information system of aids to navigation, and the real-time risk assessment for aids to navigation of the chosen channel was performed on platform of the three-dimensional simulation system, with the risk assessment software. Specifically, the deep-water channel of the Yangtze River estuary was taken as an example to illustrate the general assessment procedure. The method proposed presents practical significance and application prospect on the maintenance and management of the aids to navigation.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Risk Assessment</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Real-Time Risk Assessment</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Formal Safety Assessment (FSA)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Fuzzy-FSA</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Aids to Navigation (AtoN)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Three-Dimensional Simulation System</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Quantitative Standard</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Yangtze River Estuary</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Canals and inland navigation. Waterways</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Transportation and communications</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Chaojian Shi</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Dongxing Jia</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">TransNav: International Journal on Marine Navigation and Safety of Sea Transportation</subfield><subfield code="d">Gdynia Maritime University, 2013</subfield><subfield code="g">8(2014), 2, Seite 197-203</subfield><subfield code="w">(DE-627)79168475X</subfield><subfield code="w">(DE-600)2780511-6</subfield><subfield code="x">20836481</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:8</subfield><subfield code="g">year:2014</subfield><subfield code="g">number:2</subfield><subfield code="g">pages:197-203</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.12716/1001.08.02.04</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/04e23cca23114fac801e5a2e9db0fbd7</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://www.transnav.eu/files/Real-time Risk Assessment for Aids to Navigation Using Fuzzy-FSA on Three-Dimensional Simulation System,498.pdf</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2083-6473</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2083-6481</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHA</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_11</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">8</subfield><subfield code="j">2014</subfield><subfield code="e">2</subfield><subfield code="h">197-203</subfield></datafield></record></collection>
|
score |
7.4006395 |