Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state
This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state func...
Ausführliche Beschreibung
Autor*in: |
Tran Ngoc Tuan [verfasserIn] Dang Xuan Vinh [verfasserIn] Tran Tuan Anh [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2016 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
In: Ho Chi Minh City Open University Journal of Science - Engineering and Technology - HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021, 6(2016), 2, Seite 14-22 |
---|---|
Übergeordnetes Werk: |
volume:6 ; year:2016 ; number:2 ; pages:14-22 |
Links: |
---|
Katalog-ID: |
DOAJ053010655 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ053010655 | ||
003 | DE-627 | ||
005 | 20230503031154.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230227s2016 xx |||||o 00| ||eng c | ||
035 | |a (DE-627)DOAJ053010655 | ||
035 | |a (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
050 | 0 | |a TP248.13-248.65 | |
100 | 0 | |a Tran Ngoc Tuan |e verfasserin |4 aut | |
245 | 1 | 0 | |a Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
264 | 1 | |c 2016 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. | ||
650 | 4 | |a reliability | |
650 | 4 | |a monte carlo | |
650 | 4 | |a probability of failure | |
650 | 4 | |a bored pile | |
650 | 4 | |a limit state | |
650 | 4 | |a settlement. | |
653 | 0 | |a Biotechnology | |
700 | 0 | |a Dang Xuan Vinh |e verfasserin |4 aut | |
700 | 0 | |a Tran Tuan Anh |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t Ho Chi Minh City Open University Journal of Science - Engineering and Technology |d HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021 |g 6(2016), 2, Seite 14-22 |w (DE-627)1760270970 |x 27349608 |7 nnns |
773 | 1 | 8 | |g volume:6 |g year:2016 |g number:2 |g pages:14-22 |
856 | 4 | 0 | |u https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 |z kostenfrei |
856 | 4 | 0 | |u https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2734-9330 |y Journal toc |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2734-9608 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a SSG-OLC-PHA | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_74 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 6 |j 2016 |e 2 |h 14-22 |
author_variant |
t n t tnt d x v dxv t t a tta |
---|---|
matchkey_str |
article:27349608:2016----::plctoomnealsmltomtotetmtteeibltodsgpolmfhb |
hierarchy_sort_str |
2016 |
callnumber-subject-code |
TP |
publishDate |
2016 |
allfields |
(DE-627)DOAJ053010655 (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 DE-627 ger DE-627 rakwb eng TP248.13-248.65 Tran Ngoc Tuan verfasserin aut Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state 2016 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. reliability monte carlo probability of failure bored pile limit state settlement. Biotechnology Dang Xuan Vinh verfasserin aut Tran Tuan Anh verfasserin aut In Ho Chi Minh City Open University Journal of Science - Engineering and Technology HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021 6(2016), 2, Seite 14-22 (DE-627)1760270970 27349608 nnns volume:6 year:2016 number:2 pages:14-22 https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 kostenfrei https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 kostenfrei https://doaj.org/toc/2734-9330 Journal toc kostenfrei https://doaj.org/toc/2734-9608 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 6 2016 2 14-22 |
spelling |
(DE-627)DOAJ053010655 (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 DE-627 ger DE-627 rakwb eng TP248.13-248.65 Tran Ngoc Tuan verfasserin aut Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state 2016 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. reliability monte carlo probability of failure bored pile limit state settlement. Biotechnology Dang Xuan Vinh verfasserin aut Tran Tuan Anh verfasserin aut In Ho Chi Minh City Open University Journal of Science - Engineering and Technology HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021 6(2016), 2, Seite 14-22 (DE-627)1760270970 27349608 nnns volume:6 year:2016 number:2 pages:14-22 https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 kostenfrei https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 kostenfrei https://doaj.org/toc/2734-9330 Journal toc kostenfrei https://doaj.org/toc/2734-9608 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 6 2016 2 14-22 |
allfields_unstemmed |
(DE-627)DOAJ053010655 (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 DE-627 ger DE-627 rakwb eng TP248.13-248.65 Tran Ngoc Tuan verfasserin aut Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state 2016 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. reliability monte carlo probability of failure bored pile limit state settlement. Biotechnology Dang Xuan Vinh verfasserin aut Tran Tuan Anh verfasserin aut In Ho Chi Minh City Open University Journal of Science - Engineering and Technology HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021 6(2016), 2, Seite 14-22 (DE-627)1760270970 27349608 nnns volume:6 year:2016 number:2 pages:14-22 https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 kostenfrei https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 kostenfrei https://doaj.org/toc/2734-9330 Journal toc kostenfrei https://doaj.org/toc/2734-9608 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 6 2016 2 14-22 |
allfieldsGer |
(DE-627)DOAJ053010655 (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 DE-627 ger DE-627 rakwb eng TP248.13-248.65 Tran Ngoc Tuan verfasserin aut Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state 2016 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. reliability monte carlo probability of failure bored pile limit state settlement. Biotechnology Dang Xuan Vinh verfasserin aut Tran Tuan Anh verfasserin aut In Ho Chi Minh City Open University Journal of Science - Engineering and Technology HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021 6(2016), 2, Seite 14-22 (DE-627)1760270970 27349608 nnns volume:6 year:2016 number:2 pages:14-22 https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 kostenfrei https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 kostenfrei https://doaj.org/toc/2734-9330 Journal toc kostenfrei https://doaj.org/toc/2734-9608 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 6 2016 2 14-22 |
allfieldsSound |
(DE-627)DOAJ053010655 (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 DE-627 ger DE-627 rakwb eng TP248.13-248.65 Tran Ngoc Tuan verfasserin aut Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state 2016 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. reliability monte carlo probability of failure bored pile limit state settlement. Biotechnology Dang Xuan Vinh verfasserin aut Tran Tuan Anh verfasserin aut In Ho Chi Minh City Open University Journal of Science - Engineering and Technology HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021 6(2016), 2, Seite 14-22 (DE-627)1760270970 27349608 nnns volume:6 year:2016 number:2 pages:14-22 https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 kostenfrei https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 kostenfrei https://doaj.org/toc/2734-9330 Journal toc kostenfrei https://doaj.org/toc/2734-9608 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 6 2016 2 14-22 |
language |
English |
source |
In Ho Chi Minh City Open University Journal of Science - Engineering and Technology 6(2016), 2, Seite 14-22 volume:6 year:2016 number:2 pages:14-22 |
sourceStr |
In Ho Chi Minh City Open University Journal of Science - Engineering and Technology 6(2016), 2, Seite 14-22 volume:6 year:2016 number:2 pages:14-22 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
reliability monte carlo probability of failure bored pile limit state settlement. Biotechnology |
isfreeaccess_bool |
true |
container_title |
Ho Chi Minh City Open University Journal of Science - Engineering and Technology |
authorswithroles_txt_mv |
Tran Ngoc Tuan @@aut@@ Dang Xuan Vinh @@aut@@ Tran Tuan Anh @@aut@@ |
publishDateDaySort_date |
2016-01-01T00:00:00Z |
hierarchy_top_id |
1760270970 |
id |
DOAJ053010655 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ053010655</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230503031154.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2016 xx |||||o 00| ||eng c</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ053010655</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TP248.13-248.65</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Tran Ngoc Tuan</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2016</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">reliability</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">monte carlo</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">probability of failure</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">bored pile</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">limit state</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">settlement.</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Biotechnology</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Dang Xuan Vinh</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Tran Tuan Anh</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Ho Chi Minh City Open University Journal of Science - Engineering and Technology</subfield><subfield code="d">HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021</subfield><subfield code="g">6(2016), 2, Seite 14-22</subfield><subfield code="w">(DE-627)1760270970</subfield><subfield code="x">27349608</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:6</subfield><subfield code="g">year:2016</subfield><subfield code="g">number:2</subfield><subfield code="g">pages:14-22</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2734-9330</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2734-9608</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHA</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_74</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">6</subfield><subfield code="j">2016</subfield><subfield code="e">2</subfield><subfield code="h">14-22</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
Tran Ngoc Tuan |
spellingShingle |
Tran Ngoc Tuan misc TP248.13-248.65 misc reliability misc monte carlo misc probability of failure misc bored pile misc limit state misc settlement. misc Biotechnology Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
authorStr |
Tran Ngoc Tuan |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)1760270970 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
TP248 |
illustrated |
Not Illustrated |
issn |
27349608 |
topic_title |
TP248.13-248.65 Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state reliability monte carlo probability of failure bored pile limit state settlement |
topic |
misc TP248.13-248.65 misc reliability misc monte carlo misc probability of failure misc bored pile misc limit state misc settlement. misc Biotechnology |
topic_unstemmed |
misc TP248.13-248.65 misc reliability misc monte carlo misc probability of failure misc bored pile misc limit state misc settlement. misc Biotechnology |
topic_browse |
misc TP248.13-248.65 misc reliability misc monte carlo misc probability of failure misc bored pile misc limit state misc settlement. misc Biotechnology |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Ho Chi Minh City Open University Journal of Science - Engineering and Technology |
hierarchy_parent_id |
1760270970 |
hierarchy_top_title |
Ho Chi Minh City Open University Journal of Science - Engineering and Technology |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)1760270970 |
title |
Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
ctrlnum |
(DE-627)DOAJ053010655 (DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5 |
title_full |
Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
author_sort |
Tran Ngoc Tuan |
journal |
Ho Chi Minh City Open University Journal of Science - Engineering and Technology |
journalStr |
Ho Chi Minh City Open University Journal of Science - Engineering and Technology |
callnumber-first-code |
T |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2016 |
contenttype_str_mv |
txt |
container_start_page |
14 |
author_browse |
Tran Ngoc Tuan Dang Xuan Vinh Tran Tuan Anh |
container_volume |
6 |
class |
TP248.13-248.65 |
format_se |
Elektronische Aufsätze |
author-letter |
Tran Ngoc Tuan |
author2-role |
verfasserin |
title_sort |
application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
callnumber |
TP248.13-248.65 |
title_auth |
Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
abstract |
This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. |
abstractGer |
This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. |
abstract_unstemmed |
This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
2 |
title_short |
Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state |
url |
https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5 https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378 https://doaj.org/toc/2734-9330 https://doaj.org/toc/2734-9608 |
remote_bool |
true |
author2 |
Dang Xuan Vinh Tran Tuan Anh |
author2Str |
Dang Xuan Vinh Tran Tuan Anh |
ppnlink |
1760270970 |
callnumber-subject |
TP - Chemical Technology |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
callnumber-a |
TP248.13-248.65 |
up_date |
2024-07-03T15:17:37.278Z |
_version_ |
1803571541871427584 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ053010655</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230503031154.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2016 xx |||||o 00| ||eng c</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ053010655</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ611afa9429e447e2b5877220a5fdaaa5</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TP248.13-248.65</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Tran Ngoc Tuan</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Application of monte carlo simulation method to estimate the reliability of design problem of the bored pile according to limited state</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2016</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This paper applies Monte Carlo simulation method to estimate the reliability of bored pile for designing problem at “Tax Office of Phu Nhuan District”. Surveyed random variables are physico-mechanical properties of soil and loads are assumed that they follow the normal distribution. Limit state functions developed from design requirements of Ultimate limit state (ULS) and Serviceability limit state (SLS). Results show that the probability of failure is 0 and the reliability index of ULS is 9.493 and of SLS is 37.076 when examining coefficient of variation of soil and loads of 10%. The paper also considers the safety level when evaluating different coefficients of variation in the range of 10 ~30%. The authors suggest applying the reliability method to design calculation for other construction to help the engineers have a visual perspective, increase safety and avoid wastage.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">reliability</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">monte carlo</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">probability of failure</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">bored pile</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">limit state</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">settlement.</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Biotechnology</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Dang Xuan Vinh</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Tran Tuan Anh</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Ho Chi Minh City Open University Journal of Science - Engineering and Technology</subfield><subfield code="d">HO CHI MINH CITY OPEN UNIVERSITY JOURNAL OF SCIENCE, 2021</subfield><subfield code="g">6(2016), 2, Seite 14-22</subfield><subfield code="w">(DE-627)1760270970</subfield><subfield code="x">27349608</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:6</subfield><subfield code="g">year:2016</subfield><subfield code="g">number:2</subfield><subfield code="g">pages:14-22</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/611afa9429e447e2b5877220a5fdaaa5</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://journalofscience.ou.edu.vn/index.php/tech-en/article/view/378</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2734-9330</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2734-9608</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHA</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_74</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">6</subfield><subfield code="j">2016</subfield><subfield code="e">2</subfield><subfield code="h">14-22</subfield></datafield></record></collection>
|
score |
7.3983173 |