Portfolio approach to project management in creation of the organization’s value
The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesse...
Ausführliche Beschreibung
Autor*in: |
Kaczorowska Anna [verfasserIn] Słoniec Jolanta [verfasserIn] Motyka Sabina [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch ; Französisch |
Erschienen: |
2019 |
---|
Übergeordnetes Werk: |
In: MATEC Web of Conferences - EDP Sciences, 2013, 252, p 06011(2019) |
---|---|
Übergeordnetes Werk: |
volume:252, p 06011 ; year:2019 |
Links: |
---|
DOI / URN: |
10.1051/matecconf/201925206011 |
---|
Katalog-ID: |
DOAJ053897420 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ053897420 | ||
003 | DE-627 | ||
005 | 20230308180050.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230227s2019 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1051/matecconf/201925206011 |2 doi | |
035 | |a (DE-627)DOAJ053897420 | ||
035 | |a (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng |a fre | ||
050 | 0 | |a TA1-2040 | |
100 | 0 | |a Kaczorowska Anna |e verfasserin |4 aut | |
245 | 1 | 0 | |a Portfolio approach to project management in creation of the organization’s value |
264 | 1 | |c 2019 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. | ||
653 | 0 | |a Engineering (General). Civil engineering (General) | |
700 | 0 | |a Słoniec Jolanta |e verfasserin |4 aut | |
700 | 0 | |a Motyka Sabina |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t MATEC Web of Conferences |d EDP Sciences, 2013 |g 252, p 06011(2019) |w (DE-627)720166209 |w (DE-600)2673602-0 |x 2261236X |7 nnns |
773 | 1 | 8 | |g volume:252, p 06011 |g year:2019 |
856 | 4 | 0 | |u https://doi.org/10.1051/matecconf/201925206011 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 |z kostenfrei |
856 | 4 | 0 | |u https://doi.org/10.1051/matecconf/201925206011 |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2261-236X |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 252, p 06011 |j 2019 |
author_variant |
k a ka s j sj m s ms |
---|---|
matchkey_str |
article:2261236X:2019----::otoiapoctpoetaaeetnrainfh |
hierarchy_sort_str |
2019 |
callnumber-subject-code |
TA |
publishDate |
2019 |
allfields |
10.1051/matecconf/201925206011 doi (DE-627)DOAJ053897420 (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 DE-627 ger DE-627 rakwb eng fre TA1-2040 Kaczorowska Anna verfasserin aut Portfolio approach to project management in creation of the organization’s value 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. Engineering (General). Civil engineering (General) Słoniec Jolanta verfasserin aut Motyka Sabina verfasserin aut In MATEC Web of Conferences EDP Sciences, 2013 252, p 06011(2019) (DE-627)720166209 (DE-600)2673602-0 2261236X nnns volume:252, p 06011 year:2019 https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 kostenfrei https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/toc/2261-236X Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 252, p 06011 2019 |
spelling |
10.1051/matecconf/201925206011 doi (DE-627)DOAJ053897420 (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 DE-627 ger DE-627 rakwb eng fre TA1-2040 Kaczorowska Anna verfasserin aut Portfolio approach to project management in creation of the organization’s value 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. Engineering (General). Civil engineering (General) Słoniec Jolanta verfasserin aut Motyka Sabina verfasserin aut In MATEC Web of Conferences EDP Sciences, 2013 252, p 06011(2019) (DE-627)720166209 (DE-600)2673602-0 2261236X nnns volume:252, p 06011 year:2019 https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 kostenfrei https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/toc/2261-236X Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 252, p 06011 2019 |
allfields_unstemmed |
10.1051/matecconf/201925206011 doi (DE-627)DOAJ053897420 (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 DE-627 ger DE-627 rakwb eng fre TA1-2040 Kaczorowska Anna verfasserin aut Portfolio approach to project management in creation of the organization’s value 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. Engineering (General). Civil engineering (General) Słoniec Jolanta verfasserin aut Motyka Sabina verfasserin aut In MATEC Web of Conferences EDP Sciences, 2013 252, p 06011(2019) (DE-627)720166209 (DE-600)2673602-0 2261236X nnns volume:252, p 06011 year:2019 https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 kostenfrei https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/toc/2261-236X Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 252, p 06011 2019 |
allfieldsGer |
10.1051/matecconf/201925206011 doi (DE-627)DOAJ053897420 (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 DE-627 ger DE-627 rakwb eng fre TA1-2040 Kaczorowska Anna verfasserin aut Portfolio approach to project management in creation of the organization’s value 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. Engineering (General). Civil engineering (General) Słoniec Jolanta verfasserin aut Motyka Sabina verfasserin aut In MATEC Web of Conferences EDP Sciences, 2013 252, p 06011(2019) (DE-627)720166209 (DE-600)2673602-0 2261236X nnns volume:252, p 06011 year:2019 https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 kostenfrei https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/toc/2261-236X Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 252, p 06011 2019 |
allfieldsSound |
10.1051/matecconf/201925206011 doi (DE-627)DOAJ053897420 (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 DE-627 ger DE-627 rakwb eng fre TA1-2040 Kaczorowska Anna verfasserin aut Portfolio approach to project management in creation of the organization’s value 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. Engineering (General). Civil engineering (General) Słoniec Jolanta verfasserin aut Motyka Sabina verfasserin aut In MATEC Web of Conferences EDP Sciences, 2013 252, p 06011(2019) (DE-627)720166209 (DE-600)2673602-0 2261236X nnns volume:252, p 06011 year:2019 https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 kostenfrei https://doi.org/10.1051/matecconf/201925206011 kostenfrei https://doaj.org/toc/2261-236X Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 252, p 06011 2019 |
language |
English French |
source |
In MATEC Web of Conferences 252, p 06011(2019) volume:252, p 06011 year:2019 |
sourceStr |
In MATEC Web of Conferences 252, p 06011(2019) volume:252, p 06011 year:2019 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Engineering (General). Civil engineering (General) |
isfreeaccess_bool |
true |
container_title |
MATEC Web of Conferences |
authorswithroles_txt_mv |
Kaczorowska Anna @@aut@@ Słoniec Jolanta @@aut@@ Motyka Sabina @@aut@@ |
publishDateDaySort_date |
2019-01-01T00:00:00Z |
hierarchy_top_id |
720166209 |
id |
DOAJ053897420 |
language_de |
englisch franzoesisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ053897420</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230308180050.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2019 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1051/matecconf/201925206011</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ053897420</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield><subfield code="a">fre</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TA1-2040</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Kaczorowska Anna</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Portfolio approach to project management in creation of the organization’s value</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2019</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated.</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Engineering (General). Civil engineering (General)</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Słoniec Jolanta</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Motyka Sabina</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">MATEC Web of Conferences</subfield><subfield code="d">EDP Sciences, 2013</subfield><subfield code="g">252, p 06011(2019)</subfield><subfield code="w">(DE-627)720166209</subfield><subfield code="w">(DE-600)2673602-0</subfield><subfield code="x">2261236X</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:252, p 06011</subfield><subfield code="g">year:2019</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1051/matecconf/201925206011</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1051/matecconf/201925206011</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2261-236X</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">252, p 06011</subfield><subfield code="j">2019</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
Kaczorowska Anna |
spellingShingle |
Kaczorowska Anna misc TA1-2040 misc Engineering (General). Civil engineering (General) Portfolio approach to project management in creation of the organization’s value |
authorStr |
Kaczorowska Anna |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)720166209 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
TA1-2040 |
illustrated |
Not Illustrated |
issn |
2261236X |
topic_title |
TA1-2040 Portfolio approach to project management in creation of the organization’s value |
topic |
misc TA1-2040 misc Engineering (General). Civil engineering (General) |
topic_unstemmed |
misc TA1-2040 misc Engineering (General). Civil engineering (General) |
topic_browse |
misc TA1-2040 misc Engineering (General). Civil engineering (General) |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
MATEC Web of Conferences |
hierarchy_parent_id |
720166209 |
hierarchy_top_title |
MATEC Web of Conferences |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)720166209 (DE-600)2673602-0 |
title |
Portfolio approach to project management in creation of the organization’s value |
ctrlnum |
(DE-627)DOAJ053897420 (DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30 |
title_full |
Portfolio approach to project management in creation of the organization’s value |
author_sort |
Kaczorowska Anna |
journal |
MATEC Web of Conferences |
journalStr |
MATEC Web of Conferences |
callnumber-first-code |
T |
lang_code |
eng fre |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2019 |
contenttype_str_mv |
txt |
author_browse |
Kaczorowska Anna Słoniec Jolanta Motyka Sabina |
container_volume |
252, p 06011 |
class |
TA1-2040 |
format_se |
Elektronische Aufsätze |
author-letter |
Kaczorowska Anna |
doi_str_mv |
10.1051/matecconf/201925206011 |
author2-role |
verfasserin |
title_sort |
portfolio approach to project management in creation of the organization’s value |
callnumber |
TA1-2040 |
title_auth |
Portfolio approach to project management in creation of the organization’s value |
abstract |
The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. |
abstractGer |
The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. |
abstract_unstemmed |
The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_2055 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
title_short |
Portfolio approach to project management in creation of the organization’s value |
url |
https://doi.org/10.1051/matecconf/201925206011 https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30 https://doaj.org/toc/2261-236X |
remote_bool |
true |
author2 |
Słoniec Jolanta Motyka Sabina |
author2Str |
Słoniec Jolanta Motyka Sabina |
ppnlink |
720166209 |
callnumber-subject |
TA - General and Civil Engineering |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.1051/matecconf/201925206011 |
callnumber-a |
TA1-2040 |
up_date |
2024-07-03T20:10:51.035Z |
_version_ |
1803589990258573312 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ053897420</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230308180050.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230227s2019 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1051/matecconf/201925206011</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ053897420</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ87a76223ec6449b6ac8713c2d285de30</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield><subfield code="a">fre</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TA1-2040</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Kaczorowska Anna</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Portfolio approach to project management in creation of the organization’s value</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2019</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The composition and structure of the project portfolio were analysed and the importance of the links between particular projects and with the organization’s strategy in creating of its value were emphasised in the article. As regards the information projects, profoundly analysed were the subprocesses of identification, categorization, evaluation of components, and balancing of the whole portfolio, besides the tools were proposed for them which involve the specificity of ICT undertakings, optimise the use of the organisation’s resources and enable economically justified choice of projects for the portfolio. The applied research methods comprise a cross-sectional analysis of literature and analytical method. In result of the presented considerations a growing role of the portfolio approach to project management was shown along with its importance in creation of the contemporary organization’s values, and the need to continue the research in the selected area was demonstrated.</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Engineering (General). Civil engineering (General)</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Słoniec Jolanta</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Motyka Sabina</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">MATEC Web of Conferences</subfield><subfield code="d">EDP Sciences, 2013</subfield><subfield code="g">252, p 06011(2019)</subfield><subfield code="w">(DE-627)720166209</subfield><subfield code="w">(DE-600)2673602-0</subfield><subfield code="x">2261236X</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:252, p 06011</subfield><subfield code="g">year:2019</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1051/matecconf/201925206011</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/87a76223ec6449b6ac8713c2d285de30</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1051/matecconf/201925206011</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2261-236X</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">252, p 06011</subfield><subfield code="j">2019</subfield></datafield></record></collection>
|
score |
7.4015017 |