Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran
Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “...
Ausführliche Beschreibung
Autor*in: |
محمد یعقوبی [verfasserIn] رامین رفیعی [verfasserIn] مهدی نجفی [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch ; Persisch |
Erschienen: |
2019 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
In: Analytical and Numerical Methods in Mining Engineering - Yazd University, 2016, 8(2019), 17, Seite 27-37 |
---|---|
Übergeordnetes Werk: |
volume:8 ; year:2019 ; number:17 ; pages:27-37 |
Links: |
Link aufrufen |
---|
DOI / URN: |
10.29252/anm.8.17.27 |
---|
Katalog-ID: |
DOAJ067581986 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ067581986 | ||
003 | DE-627 | ||
005 | 20230309071331.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230228s2019 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.29252/anm.8.17.27 |2 doi | |
035 | |a (DE-627)DOAJ067581986 | ||
035 | |a (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng |a per | ||
050 | 0 | |a TN1-997 | |
100 | 0 | |a محمد یعقوبی |e verfasserin |4 aut | |
245 | 1 | 0 | |a Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran |
264 | 1 | |c 2019 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. | ||
650 | 4 | |a Room and pillar | |
650 | 4 | |a Pillar recovery | |
650 | 4 | |a Coal mine | |
650 | 4 | |a Modified split and fender | |
650 | 4 | |a Shortwall mining | |
650 | 4 | |a FLAC3D software | |
653 | 0 | |a Mining engineering. Metallurgy | |
700 | 0 | |a رامین رفیعی |e verfasserin |4 aut | |
700 | 0 | |a مهدی نجفی |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t Analytical and Numerical Methods in Mining Engineering |d Yazd University, 2016 |g 8(2019), 17, Seite 27-37 |w (DE-627)866099808 |w (DE-600)2866119-9 |x 26766795 |7 nnns |
773 | 1 | 8 | |g volume:8 |g year:2019 |g number:17 |g pages:27-37 |
856 | 4 | 0 | |u https://doi.org/10.29252/anm.8.17.27 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 |z kostenfrei |
856 | 4 | 0 | |u http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2251-6565 |y Journal toc |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2251-6565 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 8 |j 2019 |e 17 |h 27-37 |
author_variant |
م ی می ر ر رر م ن من |
---|---|
matchkey_str |
article:26766795:2019----::oprnteoiidpiadedrnsotalehdfrhplarcvriroadilroliigsnadiieif |
hierarchy_sort_str |
2019 |
callnumber-subject-code |
TN |
publishDate |
2019 |
allfields |
10.29252/anm.8.17.27 doi (DE-627)DOAJ067581986 (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 DE-627 ger DE-627 rakwb eng per TN1-997 محمد یعقوبی verfasserin aut Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software Mining engineering. Metallurgy رامین رفیعی verfasserin aut مهدی نجفی verfasserin aut In Analytical and Numerical Methods in Mining Engineering Yazd University, 2016 8(2019), 17, Seite 27-37 (DE-627)866099808 (DE-600)2866119-9 26766795 nnns volume:8 year:2019 number:17 pages:27-37 https://doi.org/10.29252/anm.8.17.27 kostenfrei https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 kostenfrei http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2019 17 27-37 |
spelling |
10.29252/anm.8.17.27 doi (DE-627)DOAJ067581986 (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 DE-627 ger DE-627 rakwb eng per TN1-997 محمد یعقوبی verfasserin aut Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software Mining engineering. Metallurgy رامین رفیعی verfasserin aut مهدی نجفی verfasserin aut In Analytical and Numerical Methods in Mining Engineering Yazd University, 2016 8(2019), 17, Seite 27-37 (DE-627)866099808 (DE-600)2866119-9 26766795 nnns volume:8 year:2019 number:17 pages:27-37 https://doi.org/10.29252/anm.8.17.27 kostenfrei https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 kostenfrei http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2019 17 27-37 |
allfields_unstemmed |
10.29252/anm.8.17.27 doi (DE-627)DOAJ067581986 (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 DE-627 ger DE-627 rakwb eng per TN1-997 محمد یعقوبی verfasserin aut Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software Mining engineering. Metallurgy رامین رفیعی verfasserin aut مهدی نجفی verfasserin aut In Analytical and Numerical Methods in Mining Engineering Yazd University, 2016 8(2019), 17, Seite 27-37 (DE-627)866099808 (DE-600)2866119-9 26766795 nnns volume:8 year:2019 number:17 pages:27-37 https://doi.org/10.29252/anm.8.17.27 kostenfrei https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 kostenfrei http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2019 17 27-37 |
allfieldsGer |
10.29252/anm.8.17.27 doi (DE-627)DOAJ067581986 (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 DE-627 ger DE-627 rakwb eng per TN1-997 محمد یعقوبی verfasserin aut Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software Mining engineering. Metallurgy رامین رفیعی verfasserin aut مهدی نجفی verfasserin aut In Analytical and Numerical Methods in Mining Engineering Yazd University, 2016 8(2019), 17, Seite 27-37 (DE-627)866099808 (DE-600)2866119-9 26766795 nnns volume:8 year:2019 number:17 pages:27-37 https://doi.org/10.29252/anm.8.17.27 kostenfrei https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 kostenfrei http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2019 17 27-37 |
allfieldsSound |
10.29252/anm.8.17.27 doi (DE-627)DOAJ067581986 (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 DE-627 ger DE-627 rakwb eng per TN1-997 محمد یعقوبی verfasserin aut Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran 2019 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software Mining engineering. Metallurgy رامین رفیعی verfasserin aut مهدی نجفی verfasserin aut In Analytical and Numerical Methods in Mining Engineering Yazd University, 2016 8(2019), 17, Seite 27-37 (DE-627)866099808 (DE-600)2866119-9 26766795 nnns volume:8 year:2019 number:17 pages:27-37 https://doi.org/10.29252/anm.8.17.27 kostenfrei https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 kostenfrei http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei https://doaj.org/toc/2251-6565 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2019 17 27-37 |
language |
English Persian |
source |
In Analytical and Numerical Methods in Mining Engineering 8(2019), 17, Seite 27-37 volume:8 year:2019 number:17 pages:27-37 |
sourceStr |
In Analytical and Numerical Methods in Mining Engineering 8(2019), 17, Seite 27-37 volume:8 year:2019 number:17 pages:27-37 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software Mining engineering. Metallurgy |
isfreeaccess_bool |
true |
container_title |
Analytical and Numerical Methods in Mining Engineering |
authorswithroles_txt_mv |
محمد یعقوبی @@aut@@ رامین رفیعی @@aut@@ مهدی نجفی @@aut@@ |
publishDateDaySort_date |
2019-01-01T00:00:00Z |
hierarchy_top_id |
866099808 |
id |
DOAJ067581986 |
language_de |
englisch persisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ067581986</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230309071331.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230228s2019 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.29252/anm.8.17.27</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ067581986</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ12d8729957e94085be8daf51d741ddf8</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield><subfield code="a">per</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TN1-997</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">محمد یعقوبی</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2019</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Room and pillar</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Pillar recovery</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Coal mine</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Modified split and fender</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Shortwall mining</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">FLAC3D software</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Mining engineering. Metallurgy</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">رامین رفیعی</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">مهدی نجفی</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Analytical and Numerical Methods in Mining Engineering</subfield><subfield code="d">Yazd University, 2016</subfield><subfield code="g">8(2019), 17, Seite 27-37</subfield><subfield code="w">(DE-627)866099808</subfield><subfield code="w">(DE-600)2866119-9</subfield><subfield code="x">26766795</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:8</subfield><subfield code="g">year:2019</subfield><subfield code="g">number:17</subfield><subfield code="g">pages:27-37</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.29252/anm.8.17.27</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/12d8729957e94085be8daf51d741ddf8</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2251-6565</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2251-6565</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">8</subfield><subfield code="j">2019</subfield><subfield code="e">17</subfield><subfield code="h">27-37</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
محمد یعقوبی |
spellingShingle |
محمد یعقوبی misc TN1-997 misc Room and pillar misc Pillar recovery misc Coal mine misc Modified split and fender misc Shortwall mining misc FLAC3D software misc Mining engineering. Metallurgy Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran |
authorStr |
محمد یعقوبی |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)866099808 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
TN1-997 |
illustrated |
Not Illustrated |
issn |
26766795 |
topic_title |
TN1-997 Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran Room and pillar Pillar recovery Coal mine Modified split and fender Shortwall mining FLAC3D software |
topic |
misc TN1-997 misc Room and pillar misc Pillar recovery misc Coal mine misc Modified split and fender misc Shortwall mining misc FLAC3D software misc Mining engineering. Metallurgy |
topic_unstemmed |
misc TN1-997 misc Room and pillar misc Pillar recovery misc Coal mine misc Modified split and fender misc Shortwall mining misc FLAC3D software misc Mining engineering. Metallurgy |
topic_browse |
misc TN1-997 misc Room and pillar misc Pillar recovery misc Coal mine misc Modified split and fender misc Shortwall mining misc FLAC3D software misc Mining engineering. Metallurgy |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Analytical and Numerical Methods in Mining Engineering |
hierarchy_parent_id |
866099808 |
hierarchy_top_title |
Analytical and Numerical Methods in Mining Engineering |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)866099808 (DE-600)2866119-9 |
title |
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran |
ctrlnum |
(DE-627)DOAJ067581986 (DE-599)DOAJ12d8729957e94085be8daf51d741ddf8 |
title_full |
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran |
author_sort |
محمد یعقوبی |
journal |
Analytical and Numerical Methods in Mining Engineering |
journalStr |
Analytical and Numerical Methods in Mining Engineering |
callnumber-first-code |
T |
lang_code |
eng per |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2019 |
contenttype_str_mv |
txt |
container_start_page |
27 |
author_browse |
محمد یعقوبی رامین رفیعی مهدی نجفی |
container_volume |
8 |
class |
TN1-997 |
format_se |
Elektronische Aufsätze |
author-letter |
محمد یعقوبی |
doi_str_mv |
10.29252/anm.8.17.27 |
author2-role |
verfasserin |
title_sort |
comparing the “modified split and fender” and “shortwall” methods for the pillar recovery in room and pillar coal mining using a 3d finite difference modeling in tabas central coal mine, iran |
callnumber |
TN1-997 |
title_auth |
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran |
abstract |
Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. |
abstractGer |
Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. |
abstract_unstemmed |
Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
17 |
title_short |
Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran |
url |
https://doi.org/10.29252/anm.8.17.27 https://doaj.org/article/12d8729957e94085be8daf51d741ddf8 http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf https://doaj.org/toc/2251-6565 |
remote_bool |
true |
author2 |
رامین رفیعی مهدی نجفی |
author2Str |
رامین رفیعی مهدی نجفی |
ppnlink |
866099808 |
callnumber-subject |
TN - Mining Engineering and Metallurgy |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.29252/anm.8.17.27 |
callnumber-a |
TN1-997 |
up_date |
2024-07-04T01:29:29.205Z |
_version_ |
1803610037112799232 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ067581986</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230309071331.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230228s2019 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.29252/anm.8.17.27</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ067581986</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJ12d8729957e94085be8daf51d741ddf8</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield><subfield code="a">per</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">TN1-997</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">محمد یعقوبی</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Comparing the “Modified Split and Fender” and “Shortwall” Methods for the Pillar Recovery in Room and Pillar Coal Mining Using A 3D Finite Difference Modeling in Tabas Central Coal Mine, Iran</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2019</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Selecting a suitable pillar recovery method is one of the most important issues in the room and pillar mining. The main purpose of this study is to compare two methods for pillar recovery in Tabas central coal mine (TCM). Among the existing methods, the two methods, “Modified split and fender” and “Shortwall” are chosen for the numerical modeling. The three dimensional finite difference method (FLAC3D software) is used to model these methods. In the next step, the vertical stress and displacement, the plastic zone condition and the safety factor during each stage of pillar recovery were compared for each method. The results of this modeling show that the percentages of coal recovery for two methods of “modified split and fender” and “shortwall” are around 70% and 82% respectively. Comparing the percentage recovery of coal for these two methods, exhibits that the shortwall method is more suitable than modified split and fender, for this mine.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Room and pillar</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Pillar recovery</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Coal mine</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Modified split and fender</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Shortwall mining</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">FLAC3D software</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Mining engineering. Metallurgy</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">رامین رفیعی</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">مهدی نجفی</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Analytical and Numerical Methods in Mining Engineering</subfield><subfield code="d">Yazd University, 2016</subfield><subfield code="g">8(2019), 17, Seite 27-37</subfield><subfield code="w">(DE-627)866099808</subfield><subfield code="w">(DE-600)2866119-9</subfield><subfield code="x">26766795</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:8</subfield><subfield code="g">year:2019</subfield><subfield code="g">number:17</subfield><subfield code="g">pages:27-37</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.29252/anm.8.17.27</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/12d8729957e94085be8daf51d741ddf8</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://anm.yazd.ac.ir/article_1337_4b33a49f3a43f898e41296de1221e281.pdf</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2251-6565</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2251-6565</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">8</subfield><subfield code="j">2019</subfield><subfield code="e">17</subfield><subfield code="h">27-37</subfield></datafield></record></collection>
|
score |
7.402793 |