A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing
Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) sc...
Ausführliche Beschreibung
Autor*in: |
Lindong Liu [verfasserIn] Zhenyu Wu [verfasserIn] Yugang Yu [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2023 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
In: Journal of Management Science and Engineering - KeAi Communications Co., Ltd., 2020, 8(2023), 2, Seite 273-286 |
---|---|
Übergeordnetes Werk: |
volume:8 ; year:2023 ; number:2 ; pages:273-286 |
Links: |
---|
DOI / URN: |
10.1016/j.jmse.2022.10.001 |
---|
Katalog-ID: |
DOAJ088487849 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | DOAJ088487849 | ||
003 | DE-627 | ||
005 | 20230526110400.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230410s2023 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1016/j.jmse.2022.10.001 |2 doi | |
035 | |a (DE-627)DOAJ088487849 | ||
035 | |a (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
050 | 0 | |a T55.4-60.8 | |
100 | 0 | |a Lindong Liu |e verfasserin |4 aut | |
245 | 1 | 2 | |a A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
264 | 1 | |c 2023 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. | ||
650 | 4 | |a Single-machine scheduling | |
650 | 4 | |a Branch and price | |
650 | 4 | |a Labelling algorithm | |
650 | 4 | |a Additive manufacturing | |
653 | 0 | |a Industrial engineering. Management engineering | |
700 | 0 | |a Zhenyu Wu |e verfasserin |4 aut | |
700 | 0 | |a Yugang Yu |e verfasserin |4 aut | |
773 | 0 | 8 | |i In |t Journal of Management Science and Engineering |d KeAi Communications Co., Ltd., 2020 |g 8(2023), 2, Seite 273-286 |w (DE-627)1665781963 |w (DE-600)2972364-4 |x 25895532 |7 nnns |
773 | 1 | 8 | |g volume:8 |g year:2023 |g number:2 |g pages:273-286 |
856 | 4 | 0 | |u https://doi.org/10.1016/j.jmse.2022.10.001 |z kostenfrei |
856 | 4 | 0 | |u https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 |z kostenfrei |
856 | 4 | 0 | |u http://www.sciencedirect.com/science/article/pii/S209623202200052X |z kostenfrei |
856 | 4 | 2 | |u https://doaj.org/toc/2096-2320 |y Journal toc |z kostenfrei |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_DOAJ | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_206 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4326 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 8 |j 2023 |e 2 |h 273-286 |
author_variant |
l l ll z w zw y y yy |
---|---|
matchkey_str |
article:25895532:2023----::bacadrcagrtmoefrsnlmcieceuigoa |
hierarchy_sort_str |
2023 |
callnumber-subject-code |
T |
publishDate |
2023 |
allfields |
10.1016/j.jmse.2022.10.001 doi (DE-627)DOAJ088487849 (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 DE-627 ger DE-627 rakwb eng T55.4-60.8 Lindong Liu verfasserin aut A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing 2023 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing Industrial engineering. Management engineering Zhenyu Wu verfasserin aut Yugang Yu verfasserin aut In Journal of Management Science and Engineering KeAi Communications Co., Ltd., 2020 8(2023), 2, Seite 273-286 (DE-627)1665781963 (DE-600)2972364-4 25895532 nnns volume:8 year:2023 number:2 pages:273-286 https://doi.org/10.1016/j.jmse.2022.10.001 kostenfrei https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 kostenfrei http://www.sciencedirect.com/science/article/pii/S209623202200052X kostenfrei https://doaj.org/toc/2096-2320 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2023 2 273-286 |
spelling |
10.1016/j.jmse.2022.10.001 doi (DE-627)DOAJ088487849 (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 DE-627 ger DE-627 rakwb eng T55.4-60.8 Lindong Liu verfasserin aut A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing 2023 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing Industrial engineering. Management engineering Zhenyu Wu verfasserin aut Yugang Yu verfasserin aut In Journal of Management Science and Engineering KeAi Communications Co., Ltd., 2020 8(2023), 2, Seite 273-286 (DE-627)1665781963 (DE-600)2972364-4 25895532 nnns volume:8 year:2023 number:2 pages:273-286 https://doi.org/10.1016/j.jmse.2022.10.001 kostenfrei https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 kostenfrei http://www.sciencedirect.com/science/article/pii/S209623202200052X kostenfrei https://doaj.org/toc/2096-2320 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2023 2 273-286 |
allfields_unstemmed |
10.1016/j.jmse.2022.10.001 doi (DE-627)DOAJ088487849 (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 DE-627 ger DE-627 rakwb eng T55.4-60.8 Lindong Liu verfasserin aut A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing 2023 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing Industrial engineering. Management engineering Zhenyu Wu verfasserin aut Yugang Yu verfasserin aut In Journal of Management Science and Engineering KeAi Communications Co., Ltd., 2020 8(2023), 2, Seite 273-286 (DE-627)1665781963 (DE-600)2972364-4 25895532 nnns volume:8 year:2023 number:2 pages:273-286 https://doi.org/10.1016/j.jmse.2022.10.001 kostenfrei https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 kostenfrei http://www.sciencedirect.com/science/article/pii/S209623202200052X kostenfrei https://doaj.org/toc/2096-2320 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2023 2 273-286 |
allfieldsGer |
10.1016/j.jmse.2022.10.001 doi (DE-627)DOAJ088487849 (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 DE-627 ger DE-627 rakwb eng T55.4-60.8 Lindong Liu verfasserin aut A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing 2023 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing Industrial engineering. Management engineering Zhenyu Wu verfasserin aut Yugang Yu verfasserin aut In Journal of Management Science and Engineering KeAi Communications Co., Ltd., 2020 8(2023), 2, Seite 273-286 (DE-627)1665781963 (DE-600)2972364-4 25895532 nnns volume:8 year:2023 number:2 pages:273-286 https://doi.org/10.1016/j.jmse.2022.10.001 kostenfrei https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 kostenfrei http://www.sciencedirect.com/science/article/pii/S209623202200052X kostenfrei https://doaj.org/toc/2096-2320 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2023 2 273-286 |
allfieldsSound |
10.1016/j.jmse.2022.10.001 doi (DE-627)DOAJ088487849 (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 DE-627 ger DE-627 rakwb eng T55.4-60.8 Lindong Liu verfasserin aut A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing 2023 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing Industrial engineering. Management engineering Zhenyu Wu verfasserin aut Yugang Yu verfasserin aut In Journal of Management Science and Engineering KeAi Communications Co., Ltd., 2020 8(2023), 2, Seite 273-286 (DE-627)1665781963 (DE-600)2972364-4 25895532 nnns volume:8 year:2023 number:2 pages:273-286 https://doi.org/10.1016/j.jmse.2022.10.001 kostenfrei https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 kostenfrei http://www.sciencedirect.com/science/article/pii/S209623202200052X kostenfrei https://doaj.org/toc/2096-2320 Journal toc kostenfrei GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 8 2023 2 273-286 |
language |
English |
source |
In Journal of Management Science and Engineering 8(2023), 2, Seite 273-286 volume:8 year:2023 number:2 pages:273-286 |
sourceStr |
In Journal of Management Science and Engineering 8(2023), 2, Seite 273-286 volume:8 year:2023 number:2 pages:273-286 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing Industrial engineering. Management engineering |
isfreeaccess_bool |
true |
container_title |
Journal of Management Science and Engineering |
authorswithroles_txt_mv |
Lindong Liu @@aut@@ Zhenyu Wu @@aut@@ Yugang Yu @@aut@@ |
publishDateDaySort_date |
2023-01-01T00:00:00Z |
hierarchy_top_id |
1665781963 |
id |
DOAJ088487849 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ088487849</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230526110400.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230410s2023 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.jmse.2022.10.001</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ088487849</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJd6163038a06445dab3aebf564d7f49c9</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">T55.4-60.8</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Lindong Liu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="2"><subfield code="a">A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2023</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Single-machine scheduling</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Branch and price</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Labelling algorithm</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Additive manufacturing</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Industrial engineering. Management engineering</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Zhenyu Wu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Yugang Yu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Journal of Management Science and Engineering</subfield><subfield code="d">KeAi Communications Co., Ltd., 2020</subfield><subfield code="g">8(2023), 2, Seite 273-286</subfield><subfield code="w">(DE-627)1665781963</subfield><subfield code="w">(DE-600)2972364-4</subfield><subfield code="x">25895532</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:8</subfield><subfield code="g">year:2023</subfield><subfield code="g">number:2</subfield><subfield code="g">pages:273-286</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.jmse.2022.10.001</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://www.sciencedirect.com/science/article/pii/S209623202200052X</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2096-2320</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4326</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">8</subfield><subfield code="j">2023</subfield><subfield code="e">2</subfield><subfield code="h">273-286</subfield></datafield></record></collection>
|
callnumber-first |
T - Technology |
author |
Lindong Liu |
spellingShingle |
Lindong Liu misc T55.4-60.8 misc Single-machine scheduling misc Branch and price misc Labelling algorithm misc Additive manufacturing misc Industrial engineering. Management engineering A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
authorStr |
Lindong Liu |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)1665781963 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut |
collection |
DOAJ |
remote_str |
true |
callnumber-label |
T55 |
illustrated |
Not Illustrated |
issn |
25895532 |
topic_title |
T55.4-60.8 A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing Single-machine scheduling Branch and price Labelling algorithm Additive manufacturing |
topic |
misc T55.4-60.8 misc Single-machine scheduling misc Branch and price misc Labelling algorithm misc Additive manufacturing misc Industrial engineering. Management engineering |
topic_unstemmed |
misc T55.4-60.8 misc Single-machine scheduling misc Branch and price misc Labelling algorithm misc Additive manufacturing misc Industrial engineering. Management engineering |
topic_browse |
misc T55.4-60.8 misc Single-machine scheduling misc Branch and price misc Labelling algorithm misc Additive manufacturing misc Industrial engineering. Management engineering |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Journal of Management Science and Engineering |
hierarchy_parent_id |
1665781963 |
hierarchy_top_title |
Journal of Management Science and Engineering |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)1665781963 (DE-600)2972364-4 |
title |
A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
ctrlnum |
(DE-627)DOAJ088487849 (DE-599)DOAJd6163038a06445dab3aebf564d7f49c9 |
title_full |
A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
author_sort |
Lindong Liu |
journal |
Journal of Management Science and Engineering |
journalStr |
Journal of Management Science and Engineering |
callnumber-first-code |
T |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2023 |
contenttype_str_mv |
txt |
container_start_page |
273 |
author_browse |
Lindong Liu Zhenyu Wu Yugang Yu |
container_volume |
8 |
class |
T55.4-60.8 |
format_se |
Elektronische Aufsätze |
author-letter |
Lindong Liu |
doi_str_mv |
10.1016/j.jmse.2022.10.001 |
author2-role |
verfasserin |
title_sort |
branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
callnumber |
T55.4-60.8 |
title_auth |
A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
abstract |
Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. |
abstractGer |
Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. |
abstract_unstemmed |
Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_DOAJ GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2014 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
2 |
title_short |
A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing |
url |
https://doi.org/10.1016/j.jmse.2022.10.001 https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9 http://www.sciencedirect.com/science/article/pii/S209623202200052X https://doaj.org/toc/2096-2320 |
remote_bool |
true |
author2 |
Zhenyu Wu Yugang Yu |
author2Str |
Zhenyu Wu Yugang Yu |
ppnlink |
1665781963 |
callnumber-subject |
T - General Technology |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.1016/j.jmse.2022.10.001 |
callnumber-a |
T55.4-60.8 |
up_date |
2024-07-03T17:57:18.608Z |
_version_ |
1803581588625162240 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">DOAJ088487849</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230526110400.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230410s2023 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.jmse.2022.10.001</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)DOAJ088487849</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)DOAJd6163038a06445dab3aebf564d7f49c9</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="050" ind1=" " ind2="0"><subfield code="a">T55.4-60.8</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Lindong Liu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="2"><subfield code="a">A branch-and-price algorithm to perform single-machine scheduling for additive manufacturing</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2023</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Additive manufacturing (AM) has attracted significant attention in recent years based on its wide range of applications and growing demand. AM offers the advantages of production flexibility and design freedom. In this study, we considered a practical variant of the batch-processing-machine (BPM) scheduling problem that arises in AM industries, where an AM machine can process multiple parts simultaneously, as long as the two-dimensional rectangular packing constraint is not violated. Based on the set-partitioning formulation of our mixed-integer programming (MIP) model, a branch-and-price (B&P) algorithm was developed by embedding a column-generation technique into a branch-and-bound framework. Additionally, a novel labelling algorithm was developed to accelerate the column-generation process. Ours is the first study to provide a B&P algorithm to solve the BPM scheduling problem in the AM industry. We tested the performance of our algorithm using a modern MIP solver (Gurobi) and real data from a 3D printing factory. The results demonstrate that for most instances tested, our algorithm produces results similar or identical to those of Gurobi with reasonable computation time and outperforms Gurobi in terms of solution quality and running time on some large instances.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Single-machine scheduling</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Branch and price</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Labelling algorithm</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Additive manufacturing</subfield></datafield><datafield tag="653" ind1=" " ind2="0"><subfield code="a">Industrial engineering. Management engineering</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Zhenyu Wu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Yugang Yu</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">In</subfield><subfield code="t">Journal of Management Science and Engineering</subfield><subfield code="d">KeAi Communications Co., Ltd., 2020</subfield><subfield code="g">8(2023), 2, Seite 273-286</subfield><subfield code="w">(DE-627)1665781963</subfield><subfield code="w">(DE-600)2972364-4</subfield><subfield code="x">25895532</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:8</subfield><subfield code="g">year:2023</subfield><subfield code="g">number:2</subfield><subfield code="g">pages:273-286</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.jmse.2022.10.001</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doaj.org/article/d6163038a06445dab3aebf564d7f49c9</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://www.sciencedirect.com/science/article/pii/S209623202200052X</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">https://doaj.org/toc/2096-2320</subfield><subfield code="y">Journal toc</subfield><subfield code="z">kostenfrei</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_DOAJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4326</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">8</subfield><subfield code="j">2023</subfield><subfield code="e">2</subfield><subfield code="h">273-286</subfield></datafield></record></collection>
|
score |
7.399276 |