Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects
Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspect...
Ausführliche Beschreibung
Autor*in: |
Li, Yongkui [verfasserIn] Hu, Yi [verfasserIn] Xia, Bo [verfasserIn] Skitmore, Martin [verfasserIn] Li, Heng [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2018 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
Enthalten in: Automation in construction - Amsterdam [u.a.] : Elsevier Science Publ., 1992, 95, Seite 118-128 |
---|---|
Übergeordnetes Werk: |
volume:95 ; pages:118-128 |
DOI / URN: |
10.1016/j.autcon.2018.07.021 |
---|
Katalog-ID: |
ELV000483656 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | ELV000483656 | ||
003 | DE-627 | ||
005 | 20230524161522.0 | ||
007 | cr uuu---uuuuu | ||
008 | 230427s2018 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1016/j.autcon.2018.07.021 |2 doi | |
035 | |a (DE-627)ELV000483656 | ||
035 | |a (ELSEVIER)S0926-5805(18)30272-3 | ||
040 | |a DE-627 |b ger |c DE-627 |e rda | ||
041 | |a eng | ||
082 | 0 | 4 | |a 690 |q DE-600 |
084 | |a 56.03 |2 bkl | ||
100 | 1 | |a Li, Yongkui |e verfasserin |4 aut | |
245 | 1 | 0 | |a Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
264 | 1 | |c 2018 | |
336 | |a nicht spezifiziert |b zzz |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
520 | |a Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. | ||
650 | 4 | |a Urban highway construction | |
650 | 4 | |a Megaproject | |
650 | 4 | |a Safety risk | |
650 | 4 | |a Behavior-based safety (BBS) | |
650 | 4 | |a Safety inspection | |
700 | 1 | |a Hu, Yi |e verfasserin |0 (orcid)0000-0001-5036-381X |4 aut | |
700 | 1 | |a Xia, Bo |e verfasserin |4 aut | |
700 | 1 | |a Skitmore, Martin |e verfasserin |0 (orcid)0000-0001-7135-1201 |4 aut | |
700 | 1 | |a Li, Heng |e verfasserin |0 (orcid)0000-0002-3187-9041 |4 aut | |
773 | 0 | 8 | |i Enthalten in |t Automation in construction |d Amsterdam [u.a.] : Elsevier Science Publ., 1992 |g 95, Seite 118-128 |h Online-Ressource |w (DE-627)320422259 |w (DE-600)2002703-5 |w (DE-576)094478813 |7 nnns |
773 | 1 | 8 | |g volume:95 |g pages:118-128 |
912 | |a GBV_USEFLAG_U | ||
912 | |a SYSFLAG_U | ||
912 | |a GBV_ELV | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_32 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_74 | ||
912 | |a GBV_ILN_90 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_100 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_150 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_224 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_702 | ||
912 | |a GBV_ILN_2003 | ||
912 | |a GBV_ILN_2004 | ||
912 | |a GBV_ILN_2005 | ||
912 | |a GBV_ILN_2008 | ||
912 | |a GBV_ILN_2010 | ||
912 | |a GBV_ILN_2011 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2015 | ||
912 | |a GBV_ILN_2020 | ||
912 | |a GBV_ILN_2021 | ||
912 | |a GBV_ILN_2025 | ||
912 | |a GBV_ILN_2027 | ||
912 | |a GBV_ILN_2034 | ||
912 | |a GBV_ILN_2038 | ||
912 | |a GBV_ILN_2044 | ||
912 | |a GBV_ILN_2048 | ||
912 | |a GBV_ILN_2049 | ||
912 | |a GBV_ILN_2050 | ||
912 | |a GBV_ILN_2056 | ||
912 | |a GBV_ILN_2059 | ||
912 | |a GBV_ILN_2061 | ||
912 | |a GBV_ILN_2064 | ||
912 | |a GBV_ILN_2065 | ||
912 | |a GBV_ILN_2068 | ||
912 | |a GBV_ILN_2088 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_2112 | ||
912 | |a GBV_ILN_2113 | ||
912 | |a GBV_ILN_2118 | ||
912 | |a GBV_ILN_2122 | ||
912 | |a GBV_ILN_2129 | ||
912 | |a GBV_ILN_2143 | ||
912 | |a GBV_ILN_2147 | ||
912 | |a GBV_ILN_2148 | ||
912 | |a GBV_ILN_2152 | ||
912 | |a GBV_ILN_2153 | ||
912 | |a GBV_ILN_2190 | ||
912 | |a GBV_ILN_2336 | ||
912 | |a GBV_ILN_2470 | ||
912 | |a GBV_ILN_2507 | ||
912 | |a GBV_ILN_2522 | ||
912 | |a GBV_ILN_4035 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4046 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4242 | ||
912 | |a GBV_ILN_4251 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4326 | ||
912 | |a GBV_ILN_4333 | ||
912 | |a GBV_ILN_4334 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4393 | ||
936 | b | k | |a 56.03 |j Methoden im Bauingenieurwesen |
951 | |a AR | ||
952 | |d 95 |h 118-128 |
author_variant |
y l yl y h yh b x bx m s ms h l hl |
---|---|
matchkey_str |
liyongkuihuyixiaboskitmoremartinliheng:2018----:ratvbhvobsdytmocnrligaeyikiubniha |
hierarchy_sort_str |
2018 |
bklnumber |
56.03 |
publishDate |
2018 |
allfields |
10.1016/j.autcon.2018.07.021 doi (DE-627)ELV000483656 (ELSEVIER)S0926-5805(18)30272-3 DE-627 ger DE-627 rda eng 690 DE-600 56.03 bkl Li, Yongkui verfasserin aut Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects 2018 nicht spezifiziert zzz rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection Hu, Yi verfasserin (orcid)0000-0001-5036-381X aut Xia, Bo verfasserin aut Skitmore, Martin verfasserin (orcid)0000-0001-7135-1201 aut Li, Heng verfasserin (orcid)0000-0002-3187-9041 aut Enthalten in Automation in construction Amsterdam [u.a.] : Elsevier Science Publ., 1992 95, Seite 118-128 Online-Ressource (DE-627)320422259 (DE-600)2002703-5 (DE-576)094478813 nnns volume:95 pages:118-128 GBV_USEFLAG_U SYSFLAG_U GBV_ELV GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_32 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_90 GBV_ILN_95 GBV_ILN_100 GBV_ILN_105 GBV_ILN_110 GBV_ILN_150 GBV_ILN_151 GBV_ILN_224 GBV_ILN_370 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2003 GBV_ILN_2004 GBV_ILN_2005 GBV_ILN_2008 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2027 GBV_ILN_2034 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2049 GBV_ILN_2050 GBV_ILN_2056 GBV_ILN_2059 GBV_ILN_2061 GBV_ILN_2064 GBV_ILN_2065 GBV_ILN_2068 GBV_ILN_2088 GBV_ILN_2111 GBV_ILN_2112 GBV_ILN_2113 GBV_ILN_2118 GBV_ILN_2122 GBV_ILN_2129 GBV_ILN_2143 GBV_ILN_2147 GBV_ILN_2148 GBV_ILN_2152 GBV_ILN_2153 GBV_ILN_2190 GBV_ILN_2336 GBV_ILN_2470 GBV_ILN_2507 GBV_ILN_2522 GBV_ILN_4035 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4242 GBV_ILN_4251 GBV_ILN_4305 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4333 GBV_ILN_4334 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4393 56.03 Methoden im Bauingenieurwesen AR 95 118-128 |
spelling |
10.1016/j.autcon.2018.07.021 doi (DE-627)ELV000483656 (ELSEVIER)S0926-5805(18)30272-3 DE-627 ger DE-627 rda eng 690 DE-600 56.03 bkl Li, Yongkui verfasserin aut Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects 2018 nicht spezifiziert zzz rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection Hu, Yi verfasserin (orcid)0000-0001-5036-381X aut Xia, Bo verfasserin aut Skitmore, Martin verfasserin (orcid)0000-0001-7135-1201 aut Li, Heng verfasserin (orcid)0000-0002-3187-9041 aut Enthalten in Automation in construction Amsterdam [u.a.] : Elsevier Science Publ., 1992 95, Seite 118-128 Online-Ressource (DE-627)320422259 (DE-600)2002703-5 (DE-576)094478813 nnns volume:95 pages:118-128 GBV_USEFLAG_U SYSFLAG_U GBV_ELV GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_32 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_90 GBV_ILN_95 GBV_ILN_100 GBV_ILN_105 GBV_ILN_110 GBV_ILN_150 GBV_ILN_151 GBV_ILN_224 GBV_ILN_370 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2003 GBV_ILN_2004 GBV_ILN_2005 GBV_ILN_2008 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2027 GBV_ILN_2034 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2049 GBV_ILN_2050 GBV_ILN_2056 GBV_ILN_2059 GBV_ILN_2061 GBV_ILN_2064 GBV_ILN_2065 GBV_ILN_2068 GBV_ILN_2088 GBV_ILN_2111 GBV_ILN_2112 GBV_ILN_2113 GBV_ILN_2118 GBV_ILN_2122 GBV_ILN_2129 GBV_ILN_2143 GBV_ILN_2147 GBV_ILN_2148 GBV_ILN_2152 GBV_ILN_2153 GBV_ILN_2190 GBV_ILN_2336 GBV_ILN_2470 GBV_ILN_2507 GBV_ILN_2522 GBV_ILN_4035 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4242 GBV_ILN_4251 GBV_ILN_4305 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4333 GBV_ILN_4334 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4393 56.03 Methoden im Bauingenieurwesen AR 95 118-128 |
allfields_unstemmed |
10.1016/j.autcon.2018.07.021 doi (DE-627)ELV000483656 (ELSEVIER)S0926-5805(18)30272-3 DE-627 ger DE-627 rda eng 690 DE-600 56.03 bkl Li, Yongkui verfasserin aut Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects 2018 nicht spezifiziert zzz rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection Hu, Yi verfasserin (orcid)0000-0001-5036-381X aut Xia, Bo verfasserin aut Skitmore, Martin verfasserin (orcid)0000-0001-7135-1201 aut Li, Heng verfasserin (orcid)0000-0002-3187-9041 aut Enthalten in Automation in construction Amsterdam [u.a.] : Elsevier Science Publ., 1992 95, Seite 118-128 Online-Ressource (DE-627)320422259 (DE-600)2002703-5 (DE-576)094478813 nnns volume:95 pages:118-128 GBV_USEFLAG_U SYSFLAG_U GBV_ELV GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_32 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_90 GBV_ILN_95 GBV_ILN_100 GBV_ILN_105 GBV_ILN_110 GBV_ILN_150 GBV_ILN_151 GBV_ILN_224 GBV_ILN_370 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2003 GBV_ILN_2004 GBV_ILN_2005 GBV_ILN_2008 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2027 GBV_ILN_2034 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2049 GBV_ILN_2050 GBV_ILN_2056 GBV_ILN_2059 GBV_ILN_2061 GBV_ILN_2064 GBV_ILN_2065 GBV_ILN_2068 GBV_ILN_2088 GBV_ILN_2111 GBV_ILN_2112 GBV_ILN_2113 GBV_ILN_2118 GBV_ILN_2122 GBV_ILN_2129 GBV_ILN_2143 GBV_ILN_2147 GBV_ILN_2148 GBV_ILN_2152 GBV_ILN_2153 GBV_ILN_2190 GBV_ILN_2336 GBV_ILN_2470 GBV_ILN_2507 GBV_ILN_2522 GBV_ILN_4035 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4242 GBV_ILN_4251 GBV_ILN_4305 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4333 GBV_ILN_4334 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4393 56.03 Methoden im Bauingenieurwesen AR 95 118-128 |
allfieldsGer |
10.1016/j.autcon.2018.07.021 doi (DE-627)ELV000483656 (ELSEVIER)S0926-5805(18)30272-3 DE-627 ger DE-627 rda eng 690 DE-600 56.03 bkl Li, Yongkui verfasserin aut Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects 2018 nicht spezifiziert zzz rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection Hu, Yi verfasserin (orcid)0000-0001-5036-381X aut Xia, Bo verfasserin aut Skitmore, Martin verfasserin (orcid)0000-0001-7135-1201 aut Li, Heng verfasserin (orcid)0000-0002-3187-9041 aut Enthalten in Automation in construction Amsterdam [u.a.] : Elsevier Science Publ., 1992 95, Seite 118-128 Online-Ressource (DE-627)320422259 (DE-600)2002703-5 (DE-576)094478813 nnns volume:95 pages:118-128 GBV_USEFLAG_U SYSFLAG_U GBV_ELV GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_32 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_90 GBV_ILN_95 GBV_ILN_100 GBV_ILN_105 GBV_ILN_110 GBV_ILN_150 GBV_ILN_151 GBV_ILN_224 GBV_ILN_370 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2003 GBV_ILN_2004 GBV_ILN_2005 GBV_ILN_2008 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2027 GBV_ILN_2034 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2049 GBV_ILN_2050 GBV_ILN_2056 GBV_ILN_2059 GBV_ILN_2061 GBV_ILN_2064 GBV_ILN_2065 GBV_ILN_2068 GBV_ILN_2088 GBV_ILN_2111 GBV_ILN_2112 GBV_ILN_2113 GBV_ILN_2118 GBV_ILN_2122 GBV_ILN_2129 GBV_ILN_2143 GBV_ILN_2147 GBV_ILN_2148 GBV_ILN_2152 GBV_ILN_2153 GBV_ILN_2190 GBV_ILN_2336 GBV_ILN_2470 GBV_ILN_2507 GBV_ILN_2522 GBV_ILN_4035 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4242 GBV_ILN_4251 GBV_ILN_4305 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4333 GBV_ILN_4334 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4393 56.03 Methoden im Bauingenieurwesen AR 95 118-128 |
allfieldsSound |
10.1016/j.autcon.2018.07.021 doi (DE-627)ELV000483656 (ELSEVIER)S0926-5805(18)30272-3 DE-627 ger DE-627 rda eng 690 DE-600 56.03 bkl Li, Yongkui verfasserin aut Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects 2018 nicht spezifiziert zzz rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection Hu, Yi verfasserin (orcid)0000-0001-5036-381X aut Xia, Bo verfasserin aut Skitmore, Martin verfasserin (orcid)0000-0001-7135-1201 aut Li, Heng verfasserin (orcid)0000-0002-3187-9041 aut Enthalten in Automation in construction Amsterdam [u.a.] : Elsevier Science Publ., 1992 95, Seite 118-128 Online-Ressource (DE-627)320422259 (DE-600)2002703-5 (DE-576)094478813 nnns volume:95 pages:118-128 GBV_USEFLAG_U SYSFLAG_U GBV_ELV GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_32 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_90 GBV_ILN_95 GBV_ILN_100 GBV_ILN_105 GBV_ILN_110 GBV_ILN_150 GBV_ILN_151 GBV_ILN_224 GBV_ILN_370 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2003 GBV_ILN_2004 GBV_ILN_2005 GBV_ILN_2008 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2027 GBV_ILN_2034 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2049 GBV_ILN_2050 GBV_ILN_2056 GBV_ILN_2059 GBV_ILN_2061 GBV_ILN_2064 GBV_ILN_2065 GBV_ILN_2068 GBV_ILN_2088 GBV_ILN_2111 GBV_ILN_2112 GBV_ILN_2113 GBV_ILN_2118 GBV_ILN_2122 GBV_ILN_2129 GBV_ILN_2143 GBV_ILN_2147 GBV_ILN_2148 GBV_ILN_2152 GBV_ILN_2153 GBV_ILN_2190 GBV_ILN_2336 GBV_ILN_2470 GBV_ILN_2507 GBV_ILN_2522 GBV_ILN_4035 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4242 GBV_ILN_4251 GBV_ILN_4305 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4333 GBV_ILN_4334 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4393 56.03 Methoden im Bauingenieurwesen AR 95 118-128 |
language |
English |
source |
Enthalten in Automation in construction 95, Seite 118-128 volume:95 pages:118-128 |
sourceStr |
Enthalten in Automation in construction 95, Seite 118-128 volume:95 pages:118-128 |
format_phy_str_mv |
Article |
bklname |
Methoden im Bauingenieurwesen |
institution |
findex.gbv.de |
topic_facet |
Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection |
dewey-raw |
690 |
isfreeaccess_bool |
false |
container_title |
Automation in construction |
authorswithroles_txt_mv |
Li, Yongkui @@aut@@ Hu, Yi @@aut@@ Xia, Bo @@aut@@ Skitmore, Martin @@aut@@ Li, Heng @@aut@@ |
publishDateDaySort_date |
2018-01-01T00:00:00Z |
hierarchy_top_id |
320422259 |
dewey-sort |
3690 |
id |
ELV000483656 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV000483656</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230524161522.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230427s2018 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.autcon.2018.07.021</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV000483656</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0926-5805(18)30272-3</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">690</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">56.03</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Li, Yongkui</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2018</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Urban highway construction</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Megaproject</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Safety risk</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Behavior-based safety (BBS)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Safety inspection</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Hu, Yi</subfield><subfield code="e">verfasserin</subfield><subfield code="0">(orcid)0000-0001-5036-381X</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Xia, Bo</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Skitmore, Martin</subfield><subfield code="e">verfasserin</subfield><subfield code="0">(orcid)0000-0001-7135-1201</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Li, Heng</subfield><subfield code="e">verfasserin</subfield><subfield code="0">(orcid)0000-0002-3187-9041</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Automation in construction</subfield><subfield code="d">Amsterdam [u.a.] : Elsevier Science Publ., 1992</subfield><subfield code="g">95, Seite 118-128</subfield><subfield code="h">Online-Ressource</subfield><subfield code="w">(DE-627)320422259</subfield><subfield code="w">(DE-600)2002703-5</subfield><subfield code="w">(DE-576)094478813</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:95</subfield><subfield code="g">pages:118-128</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_32</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_74</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_90</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_100</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_150</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_224</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_702</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2003</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2004</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2008</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2010</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2015</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2020</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2021</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2025</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2027</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2034</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2038</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2044</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2048</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2049</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2050</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2056</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2059</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2061</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2064</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2065</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2068</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2088</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2113</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2118</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2122</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2129</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2143</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2147</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2148</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2152</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2153</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2190</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2336</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2470</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2507</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2522</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4035</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4046</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4242</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4251</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4326</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4333</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4334</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4393</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">56.03</subfield><subfield code="j">Methoden im Bauingenieurwesen</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">95</subfield><subfield code="h">118-128</subfield></datafield></record></collection>
|
author |
Li, Yongkui |
spellingShingle |
Li, Yongkui ddc 690 bkl 56.03 misc Urban highway construction misc Megaproject misc Safety risk misc Behavior-based safety (BBS) misc Safety inspection Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
authorStr |
Li, Yongkui |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)320422259 |
format |
electronic Article |
dewey-ones |
690 - Buildings |
delete_txt_mv |
keep |
author_role |
aut aut aut aut aut |
collection |
elsevier |
remote_str |
true |
illustrated |
Not Illustrated |
topic_title |
690 DE-600 56.03 bkl Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects Urban highway construction Megaproject Safety risk Behavior-based safety (BBS) Safety inspection |
topic |
ddc 690 bkl 56.03 misc Urban highway construction misc Megaproject misc Safety risk misc Behavior-based safety (BBS) misc Safety inspection |
topic_unstemmed |
ddc 690 bkl 56.03 misc Urban highway construction misc Megaproject misc Safety risk misc Behavior-based safety (BBS) misc Safety inspection |
topic_browse |
ddc 690 bkl 56.03 misc Urban highway construction misc Megaproject misc Safety risk misc Behavior-based safety (BBS) misc Safety inspection |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Automation in construction |
hierarchy_parent_id |
320422259 |
dewey-tens |
690 - Building & construction |
hierarchy_top_title |
Automation in construction |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)320422259 (DE-600)2002703-5 (DE-576)094478813 |
title |
Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
ctrlnum |
(DE-627)ELV000483656 (ELSEVIER)S0926-5805(18)30272-3 |
title_full |
Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
author_sort |
Li, Yongkui |
journal |
Automation in construction |
journalStr |
Automation in construction |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
600 - Technology |
recordtype |
marc |
publishDateSort |
2018 |
contenttype_str_mv |
zzz |
container_start_page |
118 |
author_browse |
Li, Yongkui Hu, Yi Xia, Bo Skitmore, Martin Li, Heng |
container_volume |
95 |
class |
690 DE-600 56.03 bkl |
format_se |
Elektronische Aufsätze |
author-letter |
Li, Yongkui |
doi_str_mv |
10.1016/j.autcon.2018.07.021 |
normlink |
(ORCID)0000-0001-5036-381X (ORCID)0000-0001-7135-1201 (ORCID)0000-0002-3187-9041 |
normlink_prefix_str_mv |
(orcid)0000-0001-5036-381X (orcid)0000-0001-7135-1201 (orcid)0000-0002-3187-9041 |
dewey-full |
690 |
author2-role |
verfasserin |
title_sort |
proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
title_auth |
Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
abstract |
Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. |
abstractGer |
Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. |
abstract_unstemmed |
Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management. |
collection_details |
GBV_USEFLAG_U SYSFLAG_U GBV_ELV GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_32 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_74 GBV_ILN_90 GBV_ILN_95 GBV_ILN_100 GBV_ILN_105 GBV_ILN_110 GBV_ILN_150 GBV_ILN_151 GBV_ILN_224 GBV_ILN_370 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2003 GBV_ILN_2004 GBV_ILN_2005 GBV_ILN_2008 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2027 GBV_ILN_2034 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2049 GBV_ILN_2050 GBV_ILN_2056 GBV_ILN_2059 GBV_ILN_2061 GBV_ILN_2064 GBV_ILN_2065 GBV_ILN_2068 GBV_ILN_2088 GBV_ILN_2111 GBV_ILN_2112 GBV_ILN_2113 GBV_ILN_2118 GBV_ILN_2122 GBV_ILN_2129 GBV_ILN_2143 GBV_ILN_2147 GBV_ILN_2148 GBV_ILN_2152 GBV_ILN_2153 GBV_ILN_2190 GBV_ILN_2336 GBV_ILN_2470 GBV_ILN_2507 GBV_ILN_2522 GBV_ILN_4035 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4242 GBV_ILN_4251 GBV_ILN_4305 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4326 GBV_ILN_4333 GBV_ILN_4334 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4393 |
title_short |
Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects |
remote_bool |
true |
author2 |
Hu, Yi Xia, Bo Skitmore, Martin Li, Heng |
author2Str |
Hu, Yi Xia, Bo Skitmore, Martin Li, Heng |
ppnlink |
320422259 |
mediatype_str_mv |
c |
isOA_txt |
false |
hochschulschrift_bool |
false |
doi_str |
10.1016/j.autcon.2018.07.021 |
up_date |
2024-07-06T18:07:39.709Z |
_version_ |
1803854030788624384 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV000483656</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230524161522.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">230427s2018 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.autcon.2018.07.021</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV000483656</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0926-5805(18)30272-3</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rda</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">690</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">56.03</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Li, Yongkui</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Proactive behavior-based system for controlling safety risks in urban highway construction megaprojects</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2018</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Urban highway construction megaprojects are commonly beset by significant and dynamic safety risks because of their large size, the scattered nature of the works involved, compressed construction schedules, technical difficulties and numerous participants. However, traditional on-site safety inspection cannot fully address all challenges, particularly those with behavior-based safety (BBS) risks. To deal with these challenges, this study describes the novel use of the proactive construction management system (PCMS) with a third-party safety inspection program. The definition, abstraction and implementation processes of the PCMS-aided third-party inspection program are demonstrated and tested through a case study of the Shanghai Central Loop Pudong highway construction project with multi-section sites. Based on a “before and after” comparative study, quantitative and qualitative data are triangulated to evaluate variations in the effectiveness of third-party inspection programs with and without the PCMS aided at the macro, meso, and micro levels. Results indicate the usefulness of the novel idea that applies the PCMS as a part of a third-party inspection program to improve BBS risk control on certain risky sites and incorporates its feedback into third-party inspection on all section sites to strengthen the overall safety training, safety inspection, and timely safety risk responses. These results not only provide an increased understanding of the role of PCMS in the safety management of highway megaprojects and the guidelines required for its future application but also serve as a precursor to future research into megaproject safety management.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Urban highway construction</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Megaproject</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Safety risk</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Behavior-based safety (BBS)</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Safety inspection</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Hu, Yi</subfield><subfield code="e">verfasserin</subfield><subfield code="0">(orcid)0000-0001-5036-381X</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Xia, Bo</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Skitmore, Martin</subfield><subfield code="e">verfasserin</subfield><subfield code="0">(orcid)0000-0001-7135-1201</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Li, Heng</subfield><subfield code="e">verfasserin</subfield><subfield code="0">(orcid)0000-0002-3187-9041</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Automation in construction</subfield><subfield code="d">Amsterdam [u.a.] : Elsevier Science Publ., 1992</subfield><subfield code="g">95, Seite 118-128</subfield><subfield code="h">Online-Ressource</subfield><subfield code="w">(DE-627)320422259</subfield><subfield code="w">(DE-600)2002703-5</subfield><subfield code="w">(DE-576)094478813</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:95</subfield><subfield code="g">pages:118-128</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_32</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_74</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_90</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_100</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_150</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_224</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_702</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2003</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2004</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2008</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2010</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2015</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2020</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2021</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2025</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2027</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2034</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2038</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2044</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2048</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2049</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2050</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2056</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2059</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2061</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2064</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2065</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2068</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2088</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2113</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2118</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2122</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2129</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2143</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2147</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2148</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2152</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2153</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2190</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2336</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2470</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2507</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2522</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4035</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4046</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4242</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4251</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4326</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4333</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4334</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4393</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">56.03</subfield><subfield code="j">Methoden im Bauingenieurwesen</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">95</subfield><subfield code="h">118-128</subfield></datafield></record></collection>
|
score |
7.3993254 |