Study on intermittent operation strategies of a hybrid ground-source heat pump system with double-cooling towers for hotel buildings

• Propose an HGSHP system with double-cooling towers. • Three intermittent operation strategies were simulated. • The optimal intermittent operation strategy was found for hotel building. • The payback period is three years under the optimal control strategy.

Gespeichert in:
Autor*in:

Yang, Jing [verfasserIn]

Xu, Linghong

Hu, Pingfang

Zhu, Na

Chen, Xuepeng

Format:

E-Artikel

Sprache:

Englisch

Erschienen:

2014

Schlagwörter:

Hybrid ground-source heat pump (HGSHP)

Ground heat exchanger (GHE)

Intermittent operation

Soil heat accumulation

Double-cooling towers

Umfang:

7

Übergeordnetes Werk:

Enthalten in: Advanced head and neck surgical techniques: A survey of US otolaryngology resident perspectives - Plonowska, Karolina A. ELSEVIER, 2018, an international journal of research applied to energy efficiency in the built environment, Amsterdam [u.a.]

Übergeordnetes Werk:

volume:76 ; year:2014 ; pages:506-512 ; extent:7

Links:

Volltext

DOI / URN:

10.1016/j.enbuild.2014.02.061

Katalog-ID:

ELV012349356

Nicht das Richtige dabei?

Schreiben Sie uns!