Assembly process of the ITER neutral beam injectors
The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER o...
Ausführliche Beschreibung
Autor*in: |
Graceffa, J. [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2013transfer abstract |
---|
Schlagwörter: |
---|
Umfang: |
4 |
---|
Übergeordnetes Werk: |
Enthalten in: CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current - Yang, Qi ELSEVIER, 2021, an international journal for fusion energy and technology devoted to experiments, theory, methods, and design, New York, NY [u.a.] |
---|---|
Übergeordnetes Werk: |
volume:88 ; year:2013 ; number:9 ; pages:2029-2032 ; extent:4 |
Links: |
---|
DOI / URN: |
10.1016/j.fusengdes.2013.03.010 |
---|
Katalog-ID: |
ELV016949633 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | ELV016949633 | ||
003 | DE-627 | ||
005 | 20230625121223.0 | ||
007 | cr uuu---uuuuu | ||
008 | 180602s2013 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1016/j.fusengdes.2013.03.010 |2 doi | |
028 | 5 | 2 | |a GBVA2013013000025.pica |
035 | |a (DE-627)ELV016949633 | ||
035 | |a (ELSEVIER)S0920-3796(13)00304-9 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
082 | 0 | |a 620 |a 530 | |
082 | 0 | 4 | |a 620 |q DE-600 |
082 | 0 | 4 | |a 530 |q DE-600 |
082 | 0 | 4 | |a 690 |q VZ |
084 | |a 50.92 |2 bkl | ||
100 | 1 | |a Graceffa, J. |e verfasserin |4 aut | |
245 | 1 | 0 | |a Assembly process of the ITER neutral beam injectors |
264 | 1 | |c 2013transfer abstract | |
300 | |a 4 | ||
336 | |a nicht spezifiziert |b zzz |2 rdacontent | ||
337 | |a nicht spezifiziert |b z |2 rdamedia | ||
338 | |a nicht spezifiziert |b zu |2 rdacarrier | ||
520 | |a The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. | ||
520 | |a The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. | ||
650 | 7 | |a ITER, Neutral beam cell |2 Elsevier | |
650 | 7 | |a Heating neutral beam (HNB) |2 Elsevier | |
650 | 7 | |a Diagnostic neutral beam |2 Elsevier | |
650 | 7 | |a Remote handling |2 Elsevier | |
650 | 7 | |a Neutral beam injector |2 Elsevier | |
700 | 1 | |a Boilson, D. |4 oth | |
700 | 1 | |a Hemsworth, R. |4 oth | |
700 | 1 | |a Petrov, V. |4 oth | |
700 | 1 | |a Schunke, B. |4 oth | |
700 | 1 | |a Urbani, M. |4 oth | |
700 | 1 | |a Pilard, V. |4 oth | |
773 | 0 | 8 | |i Enthalten in |n Elsevier |a Yang, Qi ELSEVIER |t CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current |d 2021 |d an international journal for fusion energy and technology devoted to experiments, theory, methods, and design |g New York, NY [u.a.] |w (DE-627)ELV006449069 |
773 | 1 | 8 | |g volume:88 |g year:2013 |g number:9 |g pages:2029-2032 |g extent:4 |
856 | 4 | 0 | |u https://doi.org/10.1016/j.fusengdes.2013.03.010 |3 Volltext |
912 | |a GBV_USEFLAG_U | ||
912 | |a GBV_ELV | ||
912 | |a SYSFLAG_U | ||
936 | b | k | |a 50.92 |j Meerestechnik |q VZ |
951 | |a AR | ||
952 | |d 88 |j 2013 |e 9 |h 2029-2032 |g 4 | ||
953 | |2 045F |a 620 |
author_variant |
j g jg |
---|---|
matchkey_str |
graceffajboilsondhemsworthrpetrovvschunk:2013----:sebyrcsotetretab |
hierarchy_sort_str |
2013transfer abstract |
bklnumber |
50.92 |
publishDate |
2013 |
allfields |
10.1016/j.fusengdes.2013.03.010 doi GBVA2013013000025.pica (DE-627)ELV016949633 (ELSEVIER)S0920-3796(13)00304-9 DE-627 ger DE-627 rakwb eng 620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl Graceffa, J. verfasserin aut Assembly process of the ITER neutral beam injectors 2013transfer abstract 4 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Elsevier Boilson, D. oth Hemsworth, R. oth Petrov, V. oth Schunke, B. oth Urbani, M. oth Pilard, V. oth Enthalten in Elsevier Yang, Qi ELSEVIER CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current 2021 an international journal for fusion energy and technology devoted to experiments, theory, methods, and design New York, NY [u.a.] (DE-627)ELV006449069 volume:88 year:2013 number:9 pages:2029-2032 extent:4 https://doi.org/10.1016/j.fusengdes.2013.03.010 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 50.92 Meerestechnik VZ AR 88 2013 9 2029-2032 4 045F 620 |
spelling |
10.1016/j.fusengdes.2013.03.010 doi GBVA2013013000025.pica (DE-627)ELV016949633 (ELSEVIER)S0920-3796(13)00304-9 DE-627 ger DE-627 rakwb eng 620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl Graceffa, J. verfasserin aut Assembly process of the ITER neutral beam injectors 2013transfer abstract 4 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Elsevier Boilson, D. oth Hemsworth, R. oth Petrov, V. oth Schunke, B. oth Urbani, M. oth Pilard, V. oth Enthalten in Elsevier Yang, Qi ELSEVIER CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current 2021 an international journal for fusion energy and technology devoted to experiments, theory, methods, and design New York, NY [u.a.] (DE-627)ELV006449069 volume:88 year:2013 number:9 pages:2029-2032 extent:4 https://doi.org/10.1016/j.fusengdes.2013.03.010 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 50.92 Meerestechnik VZ AR 88 2013 9 2029-2032 4 045F 620 |
allfields_unstemmed |
10.1016/j.fusengdes.2013.03.010 doi GBVA2013013000025.pica (DE-627)ELV016949633 (ELSEVIER)S0920-3796(13)00304-9 DE-627 ger DE-627 rakwb eng 620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl Graceffa, J. verfasserin aut Assembly process of the ITER neutral beam injectors 2013transfer abstract 4 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Elsevier Boilson, D. oth Hemsworth, R. oth Petrov, V. oth Schunke, B. oth Urbani, M. oth Pilard, V. oth Enthalten in Elsevier Yang, Qi ELSEVIER CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current 2021 an international journal for fusion energy and technology devoted to experiments, theory, methods, and design New York, NY [u.a.] (DE-627)ELV006449069 volume:88 year:2013 number:9 pages:2029-2032 extent:4 https://doi.org/10.1016/j.fusengdes.2013.03.010 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 50.92 Meerestechnik VZ AR 88 2013 9 2029-2032 4 045F 620 |
allfieldsGer |
10.1016/j.fusengdes.2013.03.010 doi GBVA2013013000025.pica (DE-627)ELV016949633 (ELSEVIER)S0920-3796(13)00304-9 DE-627 ger DE-627 rakwb eng 620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl Graceffa, J. verfasserin aut Assembly process of the ITER neutral beam injectors 2013transfer abstract 4 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Elsevier Boilson, D. oth Hemsworth, R. oth Petrov, V. oth Schunke, B. oth Urbani, M. oth Pilard, V. oth Enthalten in Elsevier Yang, Qi ELSEVIER CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current 2021 an international journal for fusion energy and technology devoted to experiments, theory, methods, and design New York, NY [u.a.] (DE-627)ELV006449069 volume:88 year:2013 number:9 pages:2029-2032 extent:4 https://doi.org/10.1016/j.fusengdes.2013.03.010 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 50.92 Meerestechnik VZ AR 88 2013 9 2029-2032 4 045F 620 |
allfieldsSound |
10.1016/j.fusengdes.2013.03.010 doi GBVA2013013000025.pica (DE-627)ELV016949633 (ELSEVIER)S0920-3796(13)00304-9 DE-627 ger DE-627 rakwb eng 620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl Graceffa, J. verfasserin aut Assembly process of the ITER neutral beam injectors 2013transfer abstract 4 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Elsevier Boilson, D. oth Hemsworth, R. oth Petrov, V. oth Schunke, B. oth Urbani, M. oth Pilard, V. oth Enthalten in Elsevier Yang, Qi ELSEVIER CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current 2021 an international journal for fusion energy and technology devoted to experiments, theory, methods, and design New York, NY [u.a.] (DE-627)ELV006449069 volume:88 year:2013 number:9 pages:2029-2032 extent:4 https://doi.org/10.1016/j.fusengdes.2013.03.010 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 50.92 Meerestechnik VZ AR 88 2013 9 2029-2032 4 045F 620 |
language |
English |
source |
Enthalten in CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current New York, NY [u.a.] volume:88 year:2013 number:9 pages:2029-2032 extent:4 |
sourceStr |
Enthalten in CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current New York, NY [u.a.] volume:88 year:2013 number:9 pages:2029-2032 extent:4 |
format_phy_str_mv |
Article |
bklname |
Meerestechnik |
institution |
findex.gbv.de |
topic_facet |
ITER, Neutral beam cell Heating neutral beam (HNB) Diagnostic neutral beam Remote handling Neutral beam injector |
dewey-raw |
620 |
isfreeaccess_bool |
false |
container_title |
CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current |
authorswithroles_txt_mv |
Graceffa, J. @@aut@@ Boilson, D. @@oth@@ Hemsworth, R. @@oth@@ Petrov, V. @@oth@@ Schunke, B. @@oth@@ Urbani, M. @@oth@@ Pilard, V. @@oth@@ |
publishDateDaySort_date |
2013-01-01T00:00:00Z |
hierarchy_top_id |
ELV006449069 |
dewey-sort |
3620 |
id |
ELV016949633 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV016949633</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230625121223.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">180602s2013 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.fusengdes.2013.03.010</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">GBVA2013013000025.pica</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV016949633</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0920-3796(13)00304-9</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">620</subfield><subfield code="a">530</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">620</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">530</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">690</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">50.92</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Graceffa, J.</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Assembly process of the ITER neutral beam injectors</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2013transfer abstract</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">4</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project.</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">ITER, Neutral beam cell</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Heating neutral beam (HNB)</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Diagnostic neutral beam</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Remote handling</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Neutral beam injector</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Boilson, D.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Hemsworth, R.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Petrov, V.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Schunke, B.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Urbani, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Pilard, V.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="n">Elsevier</subfield><subfield code="a">Yang, Qi ELSEVIER</subfield><subfield code="t">CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current</subfield><subfield code="d">2021</subfield><subfield code="d">an international journal for fusion energy and technology devoted to experiments, theory, methods, and design</subfield><subfield code="g">New York, NY [u.a.]</subfield><subfield code="w">(DE-627)ELV006449069</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:88</subfield><subfield code="g">year:2013</subfield><subfield code="g">number:9</subfield><subfield code="g">pages:2029-2032</subfield><subfield code="g">extent:4</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.fusengdes.2013.03.010</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">50.92</subfield><subfield code="j">Meerestechnik</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">88</subfield><subfield code="j">2013</subfield><subfield code="e">9</subfield><subfield code="h">2029-2032</subfield><subfield code="g">4</subfield></datafield><datafield tag="953" ind1=" " ind2=" "><subfield code="2">045F</subfield><subfield code="a">620</subfield></datafield></record></collection>
|
author |
Graceffa, J. |
spellingShingle |
Graceffa, J. ddc 620 ddc 530 ddc 690 bkl 50.92 Elsevier ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Assembly process of the ITER neutral beam injectors |
authorStr |
Graceffa, J. |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)ELV006449069 |
format |
electronic Article |
dewey-ones |
620 - Engineering & allied operations 530 - Physics 690 - Buildings |
delete_txt_mv |
keep |
author_role |
aut |
collection |
elsevier |
remote_str |
true |
illustrated |
Not Illustrated |
topic_title |
620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl Assembly process of the ITER neutral beam injectors ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector Elsevier |
topic |
ddc 620 ddc 530 ddc 690 bkl 50.92 Elsevier ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector |
topic_unstemmed |
ddc 620 ddc 530 ddc 690 bkl 50.92 Elsevier ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector |
topic_browse |
ddc 620 ddc 530 ddc 690 bkl 50.92 Elsevier ITER, Neutral beam cell Elsevier Heating neutral beam (HNB) Elsevier Diagnostic neutral beam Elsevier Remote handling Elsevier Neutral beam injector |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
zu |
author2_variant |
d b db r h rh v p vp b s bs m u mu v p vp |
hierarchy_parent_title |
CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current |
hierarchy_parent_id |
ELV006449069 |
dewey-tens |
620 - Engineering 530 - Physics 690 - Building & construction |
hierarchy_top_title |
CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)ELV006449069 |
title |
Assembly process of the ITER neutral beam injectors |
ctrlnum |
(DE-627)ELV016949633 (ELSEVIER)S0920-3796(13)00304-9 |
title_full |
Assembly process of the ITER neutral beam injectors |
author_sort |
Graceffa, J. |
journal |
CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current |
journalStr |
CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
600 - Technology 500 - Science |
recordtype |
marc |
publishDateSort |
2013 |
contenttype_str_mv |
zzz |
container_start_page |
2029 |
author_browse |
Graceffa, J. |
container_volume |
88 |
physical |
4 |
class |
620 530 620 DE-600 530 DE-600 690 VZ 50.92 bkl |
format_se |
Elektronische Aufsätze |
author-letter |
Graceffa, J. |
doi_str_mv |
10.1016/j.fusengdes.2013.03.010 |
dewey-full |
620 530 690 |
title_sort |
assembly process of the iter neutral beam injectors |
title_auth |
Assembly process of the ITER neutral beam injectors |
abstract |
The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. |
abstractGer |
The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. |
abstract_unstemmed |
The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project. |
collection_details |
GBV_USEFLAG_U GBV_ELV SYSFLAG_U |
container_issue |
9 |
title_short |
Assembly process of the ITER neutral beam injectors |
url |
https://doi.org/10.1016/j.fusengdes.2013.03.010 |
remote_bool |
true |
author2 |
Boilson, D. Hemsworth, R. Petrov, V. Schunke, B. Urbani, M. Pilard, V. |
author2Str |
Boilson, D. Hemsworth, R. Petrov, V. Schunke, B. Urbani, M. Pilard, V. |
ppnlink |
ELV006449069 |
mediatype_str_mv |
z |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth oth oth oth oth |
doi_str |
10.1016/j.fusengdes.2013.03.010 |
up_date |
2024-07-06T20:44:40.400Z |
_version_ |
1803863909099110400 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV016949633</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230625121223.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">180602s2013 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.fusengdes.2013.03.010</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">GBVA2013013000025.pica</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV016949633</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0920-3796(13)00304-9</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">620</subfield><subfield code="a">530</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">620</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">530</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">690</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">50.92</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Graceffa, J.</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Assembly process of the ITER neutral beam injectors</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2013transfer abstract</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">4</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project.</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">The ITER neutral beam (NB) injectors are used for heating and diagnostics operations. There are 4 injectors in total, 3 heating neutral beam injectors (HNBs) and one diagnostic neutral beam injector (DNB). Two HNBs and the DNB will start injection into ITER during the hydrogen/helium phase of ITER operations. A third HNB is considered as an upgrade to the ITER heating systems, and the impact of the later installation and use of that injector have to be taken into account when considering the installation and assembly of the whole NB system. It is assumed that if a third HNB is to be installed, it will be installed before the nuclear phase of the ITER project.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">ITER, Neutral beam cell</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Heating neutral beam (HNB)</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Diagnostic neutral beam</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Remote handling</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Neutral beam injector</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Boilson, D.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Hemsworth, R.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Petrov, V.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Schunke, B.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Urbani, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Pilard, V.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="n">Elsevier</subfield><subfield code="a">Yang, Qi ELSEVIER</subfield><subfield code="t">CFD modelling of local scour around Tri-USAF in sand with different arrangements under steady current</subfield><subfield code="d">2021</subfield><subfield code="d">an international journal for fusion energy and technology devoted to experiments, theory, methods, and design</subfield><subfield code="g">New York, NY [u.a.]</subfield><subfield code="w">(DE-627)ELV006449069</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:88</subfield><subfield code="g">year:2013</subfield><subfield code="g">number:9</subfield><subfield code="g">pages:2029-2032</subfield><subfield code="g">extent:4</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.fusengdes.2013.03.010</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">50.92</subfield><subfield code="j">Meerestechnik</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">88</subfield><subfield code="j">2013</subfield><subfield code="e">9</subfield><subfield code="h">2029-2032</subfield><subfield code="g">4</subfield></datafield><datafield tag="953" ind1=" " ind2=" "><subfield code="2">045F</subfield><subfield code="a">620</subfield></datafield></record></collection>
|
score |
7.397748 |