Battery energy storage systems in transmission network expansion planning
• Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price f...
Ausführliche Beschreibung
Autor*in: |
Aguado, J.A. [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2017 |
---|
Schlagwörter: |
---|
Umfang: |
10 |
---|
Übergeordnetes Werk: |
Enthalten in: MEALPY: An open-source library for latest meta-heuristic algorithms in Python - Van Thieu, Nguyen ELSEVIER, 2023, an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power, Amsterdam [u.a.] |
---|---|
Übergeordnetes Werk: |
volume:145 ; year:2017 ; pages:63-72 ; extent:10 |
Links: |
---|
DOI / URN: |
10.1016/j.epsr.2016.11.012 |
---|
Katalog-ID: |
ELV020305133 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | ELV020305133 | ||
003 | DE-627 | ||
005 | 20230623154131.0 | ||
007 | cr uuu---uuuuu | ||
008 | 180603s2017 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1016/j.epsr.2016.11.012 |2 doi | |
028 | 5 | 2 | |a GBVA2017012000012.pica |
035 | |a (DE-627)ELV020305133 | ||
035 | |a (ELSEVIER)S0378-7796(16)30487-4 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
082 | 0 | |a 620 | |
082 | 0 | 4 | |a 620 |q DE-600 |
082 | 0 | 4 | |a 004 |q VZ |
084 | |a 54.30 |2 bkl | ||
100 | 1 | |a Aguado, J.A. |e verfasserin |4 aut | |
245 | 1 | 0 | |a Battery energy storage systems in transmission network expansion planning |
264 | 1 | |c 2017 | |
300 | |a 10 | ||
336 | |a nicht spezifiziert |b zzz |2 rdacontent | ||
337 | |a nicht spezifiziert |b z |2 rdamedia | ||
338 | |a nicht spezifiziert |b zu |2 rdacarrier | ||
520 | |a • Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. | ||
650 | 7 | |a Power system |2 Elsevier | |
650 | 7 | |a Upgrade deferral |2 Elsevier | |
650 | 7 | |a Battery |2 Elsevier | |
650 | 7 | |a Energy storage system |2 Elsevier | |
650 | 7 | |a Transmission expansion planning |2 Elsevier | |
700 | 1 | |a de la Torre, S. |4 oth | |
700 | 1 | |a Triviño, A. |4 oth | |
773 | 0 | 8 | |i Enthalten in |n Elsevier Science |a Van Thieu, Nguyen ELSEVIER |t MEALPY: An open-source library for latest meta-heuristic algorithms in Python |d 2023 |d an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power |g Amsterdam [u.a.] |w (DE-627)ELV009857966 |
773 | 1 | 8 | |g volume:145 |g year:2017 |g pages:63-72 |g extent:10 |
856 | 4 | 0 | |u https://doi.org/10.1016/j.epsr.2016.11.012 |3 Volltext |
912 | |a GBV_USEFLAG_U | ||
912 | |a GBV_ELV | ||
912 | |a SYSFLAG_U | ||
936 | b | k | |a 54.30 |j Systemarchitektur: Allgemeines |x Informatik |q VZ |
951 | |a AR | ||
952 | |d 145 |j 2017 |h 63-72 |g 10 | ||
953 | |2 045F |a 620 |
author_variant |
j a ja |
---|---|
matchkey_str |
aguadojadelatorrestrivioa:2017----:atreegsoaeytmitasisontok |
hierarchy_sort_str |
2017 |
bklnumber |
54.30 |
publishDate |
2017 |
allfields |
10.1016/j.epsr.2016.11.012 doi GBVA2017012000012.pica (DE-627)ELV020305133 (ELSEVIER)S0378-7796(16)30487-4 DE-627 ger DE-627 rakwb eng 620 620 DE-600 004 VZ 54.30 bkl Aguado, J.A. verfasserin aut Battery energy storage systems in transmission network expansion planning 2017 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Elsevier de la Torre, S. oth Triviño, A. oth Enthalten in Elsevier Science Van Thieu, Nguyen ELSEVIER MEALPY: An open-source library for latest meta-heuristic algorithms in Python 2023 an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power Amsterdam [u.a.] (DE-627)ELV009857966 volume:145 year:2017 pages:63-72 extent:10 https://doi.org/10.1016/j.epsr.2016.11.012 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 54.30 Systemarchitektur: Allgemeines Informatik VZ AR 145 2017 63-72 10 045F 620 |
spelling |
10.1016/j.epsr.2016.11.012 doi GBVA2017012000012.pica (DE-627)ELV020305133 (ELSEVIER)S0378-7796(16)30487-4 DE-627 ger DE-627 rakwb eng 620 620 DE-600 004 VZ 54.30 bkl Aguado, J.A. verfasserin aut Battery energy storage systems in transmission network expansion planning 2017 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Elsevier de la Torre, S. oth Triviño, A. oth Enthalten in Elsevier Science Van Thieu, Nguyen ELSEVIER MEALPY: An open-source library for latest meta-heuristic algorithms in Python 2023 an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power Amsterdam [u.a.] (DE-627)ELV009857966 volume:145 year:2017 pages:63-72 extent:10 https://doi.org/10.1016/j.epsr.2016.11.012 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 54.30 Systemarchitektur: Allgemeines Informatik VZ AR 145 2017 63-72 10 045F 620 |
allfields_unstemmed |
10.1016/j.epsr.2016.11.012 doi GBVA2017012000012.pica (DE-627)ELV020305133 (ELSEVIER)S0378-7796(16)30487-4 DE-627 ger DE-627 rakwb eng 620 620 DE-600 004 VZ 54.30 bkl Aguado, J.A. verfasserin aut Battery energy storage systems in transmission network expansion planning 2017 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Elsevier de la Torre, S. oth Triviño, A. oth Enthalten in Elsevier Science Van Thieu, Nguyen ELSEVIER MEALPY: An open-source library for latest meta-heuristic algorithms in Python 2023 an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power Amsterdam [u.a.] (DE-627)ELV009857966 volume:145 year:2017 pages:63-72 extent:10 https://doi.org/10.1016/j.epsr.2016.11.012 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 54.30 Systemarchitektur: Allgemeines Informatik VZ AR 145 2017 63-72 10 045F 620 |
allfieldsGer |
10.1016/j.epsr.2016.11.012 doi GBVA2017012000012.pica (DE-627)ELV020305133 (ELSEVIER)S0378-7796(16)30487-4 DE-627 ger DE-627 rakwb eng 620 620 DE-600 004 VZ 54.30 bkl Aguado, J.A. verfasserin aut Battery energy storage systems in transmission network expansion planning 2017 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Elsevier de la Torre, S. oth Triviño, A. oth Enthalten in Elsevier Science Van Thieu, Nguyen ELSEVIER MEALPY: An open-source library for latest meta-heuristic algorithms in Python 2023 an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power Amsterdam [u.a.] (DE-627)ELV009857966 volume:145 year:2017 pages:63-72 extent:10 https://doi.org/10.1016/j.epsr.2016.11.012 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 54.30 Systemarchitektur: Allgemeines Informatik VZ AR 145 2017 63-72 10 045F 620 |
allfieldsSound |
10.1016/j.epsr.2016.11.012 doi GBVA2017012000012.pica (DE-627)ELV020305133 (ELSEVIER)S0378-7796(16)30487-4 DE-627 ger DE-627 rakwb eng 620 620 DE-600 004 VZ 54.30 bkl Aguado, J.A. verfasserin aut Battery energy storage systems in transmission network expansion planning 2017 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Elsevier de la Torre, S. oth Triviño, A. oth Enthalten in Elsevier Science Van Thieu, Nguyen ELSEVIER MEALPY: An open-source library for latest meta-heuristic algorithms in Python 2023 an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power Amsterdam [u.a.] (DE-627)ELV009857966 volume:145 year:2017 pages:63-72 extent:10 https://doi.org/10.1016/j.epsr.2016.11.012 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 54.30 Systemarchitektur: Allgemeines Informatik VZ AR 145 2017 63-72 10 045F 620 |
language |
English |
source |
Enthalten in MEALPY: An open-source library for latest meta-heuristic algorithms in Python Amsterdam [u.a.] volume:145 year:2017 pages:63-72 extent:10 |
sourceStr |
Enthalten in MEALPY: An open-source library for latest meta-heuristic algorithms in Python Amsterdam [u.a.] volume:145 year:2017 pages:63-72 extent:10 |
format_phy_str_mv |
Article |
bklname |
Systemarchitektur: Allgemeines |
institution |
findex.gbv.de |
topic_facet |
Power system Upgrade deferral Battery Energy storage system Transmission expansion planning |
dewey-raw |
620 |
isfreeaccess_bool |
false |
container_title |
MEALPY: An open-source library for latest meta-heuristic algorithms in Python |
authorswithroles_txt_mv |
Aguado, J.A. @@aut@@ de la Torre, S. @@oth@@ Triviño, A. @@oth@@ |
publishDateDaySort_date |
2017-01-01T00:00:00Z |
hierarchy_top_id |
ELV009857966 |
dewey-sort |
3620 |
id |
ELV020305133 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV020305133</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230623154131.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">180603s2017 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.epsr.2016.11.012</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">GBVA2017012000012.pica</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV020305133</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0378-7796(16)30487-4</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">620</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">620</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">004</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">54.30</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Aguado, J.A.</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Battery energy storage systems in transmission network expansion planning</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2017</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">10</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">• Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Power system</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Upgrade deferral</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Battery</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Energy storage system</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Transmission expansion planning</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">de la Torre, S.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Triviño, A.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="n">Elsevier Science</subfield><subfield code="a">Van Thieu, Nguyen ELSEVIER</subfield><subfield code="t">MEALPY: An open-source library for latest meta-heuristic algorithms in Python</subfield><subfield code="d">2023</subfield><subfield code="d">an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power</subfield><subfield code="g">Amsterdam [u.a.]</subfield><subfield code="w">(DE-627)ELV009857966</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:145</subfield><subfield code="g">year:2017</subfield><subfield code="g">pages:63-72</subfield><subfield code="g">extent:10</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.epsr.2016.11.012</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">54.30</subfield><subfield code="j">Systemarchitektur: Allgemeines</subfield><subfield code="x">Informatik</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">145</subfield><subfield code="j">2017</subfield><subfield code="h">63-72</subfield><subfield code="g">10</subfield></datafield><datafield tag="953" ind1=" " ind2=" "><subfield code="2">045F</subfield><subfield code="a">620</subfield></datafield></record></collection>
|
author |
Aguado, J.A. |
spellingShingle |
Aguado, J.A. ddc 620 ddc 004 bkl 54.30 Elsevier Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Battery energy storage systems in transmission network expansion planning |
authorStr |
Aguado, J.A. |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)ELV009857966 |
format |
electronic Article |
dewey-ones |
620 - Engineering & allied operations 004 - Data processing & computer science |
delete_txt_mv |
keep |
author_role |
aut |
collection |
elsevier |
remote_str |
true |
illustrated |
Not Illustrated |
topic_title |
620 620 DE-600 004 VZ 54.30 bkl Battery energy storage systems in transmission network expansion planning Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning Elsevier |
topic |
ddc 620 ddc 004 bkl 54.30 Elsevier Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning |
topic_unstemmed |
ddc 620 ddc 004 bkl 54.30 Elsevier Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning |
topic_browse |
ddc 620 ddc 004 bkl 54.30 Elsevier Power system Elsevier Upgrade deferral Elsevier Battery Elsevier Energy storage system Elsevier Transmission expansion planning |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
zu |
author2_variant |
l t s d lts ltsd a t at |
hierarchy_parent_title |
MEALPY: An open-source library for latest meta-heuristic algorithms in Python |
hierarchy_parent_id |
ELV009857966 |
dewey-tens |
620 - Engineering 000 - Computer science, knowledge & systems |
hierarchy_top_title |
MEALPY: An open-source library for latest meta-heuristic algorithms in Python |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)ELV009857966 |
title |
Battery energy storage systems in transmission network expansion planning |
ctrlnum |
(DE-627)ELV020305133 (ELSEVIER)S0378-7796(16)30487-4 |
title_full |
Battery energy storage systems in transmission network expansion planning |
author_sort |
Aguado, J.A. |
journal |
MEALPY: An open-source library for latest meta-heuristic algorithms in Python |
journalStr |
MEALPY: An open-source library for latest meta-heuristic algorithms in Python |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
600 - Technology 000 - Computer science, information & general works |
recordtype |
marc |
publishDateSort |
2017 |
contenttype_str_mv |
zzz |
container_start_page |
63 |
author_browse |
Aguado, J.A. |
container_volume |
145 |
physical |
10 |
class |
620 620 DE-600 004 VZ 54.30 bkl |
format_se |
Elektronische Aufsätze |
author-letter |
Aguado, J.A. |
doi_str_mv |
10.1016/j.epsr.2016.11.012 |
dewey-full |
620 004 |
title_sort |
battery energy storage systems in transmission network expansion planning |
title_auth |
Battery energy storage systems in transmission network expansion planning |
abstract |
• Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. |
abstractGer |
• Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. |
abstract_unstemmed |
• Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases. |
collection_details |
GBV_USEFLAG_U GBV_ELV SYSFLAG_U |
title_short |
Battery energy storage systems in transmission network expansion planning |
url |
https://doi.org/10.1016/j.epsr.2016.11.012 |
remote_bool |
true |
author2 |
de la Torre, S. Triviño, A. |
author2Str |
de la Torre, S. Triviño, A. |
ppnlink |
ELV009857966 |
mediatype_str_mv |
z |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth |
doi_str |
10.1016/j.epsr.2016.11.012 |
up_date |
2024-07-06T17:15:11.401Z |
_version_ |
1803850729551560704 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV020305133</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230623154131.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">180603s2017 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.epsr.2016.11.012</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">GBVA2017012000012.pica</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV020305133</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0378-7796(16)30487-4</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2=" "><subfield code="a">620</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">620</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">004</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">54.30</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Aguado, J.A.</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Battery energy storage systems in transmission network expansion planning</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2017</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">10</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">• Definition of an optimization algorithm to support the network expansion planning. • The algorithm makes a decision about the suitability of a transmission network expansion and the placement of BESS. • The algorithm determines the BESS features that make it convenient in terms of size and price for the expansion planning. • As shown by the results, the inclusion of a storage system allows delaying the construction of some lines in some cases.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Power system</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Upgrade deferral</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Battery</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Energy storage system</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Transmission expansion planning</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">de la Torre, S.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Triviño, A.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="n">Elsevier Science</subfield><subfield code="a">Van Thieu, Nguyen ELSEVIER</subfield><subfield code="t">MEALPY: An open-source library for latest meta-heuristic algorithms in Python</subfield><subfield code="d">2023</subfield><subfield code="d">an international journal devoted to research and new applications in generation, transmission, distribution and utilization of electric power</subfield><subfield code="g">Amsterdam [u.a.]</subfield><subfield code="w">(DE-627)ELV009857966</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:145</subfield><subfield code="g">year:2017</subfield><subfield code="g">pages:63-72</subfield><subfield code="g">extent:10</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.epsr.2016.11.012</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">54.30</subfield><subfield code="j">Systemarchitektur: Allgemeines</subfield><subfield code="x">Informatik</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">145</subfield><subfield code="j">2017</subfield><subfield code="h">63-72</subfield><subfield code="g">10</subfield></datafield><datafield tag="953" ind1=" " ind2=" "><subfield code="2">045F</subfield><subfield code="a">620</subfield></datafield></record></collection>
|
score |
7.402935 |