Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints
• A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the...
Ausführliche Beschreibung
Autor*in: |
Kuo, Tsai-Chi [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2021 |
---|
Schlagwörter: |
---|
Umfang: |
10 |
---|
Übergeordnetes Werk: |
Enthalten in: Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota - Bayulgen, Oksan ELSEVIER, 2021, Dearborn, Mich |
---|---|
Übergeordnetes Werk: |
volume:60 ; year:2021 ; pages:152-161 ; extent:10 |
Links: |
---|
DOI / URN: |
10.1016/j.jmsy.2021.05.009 |
---|
Katalog-ID: |
ELV055031013 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | ELV055031013 | ||
003 | DE-627 | ||
005 | 20230624215422.0 | ||
007 | cr uuu---uuuuu | ||
008 | 210910s2021 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1016/j.jmsy.2021.05.009 |2 doi | |
028 | 5 | 2 | |a /cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica |
035 | |a (DE-627)ELV055031013 | ||
035 | |a (ELSEVIER)S0278-6125(21)00106-0 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
082 | 0 | 4 | |a 620 |q VZ |
084 | |a 83.65 |2 bkl | ||
100 | 1 | |a Kuo, Tsai-Chi |e verfasserin |4 aut | |
245 | 1 | 0 | |a Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints |
264 | 1 | |c 2021 | |
300 | |a 10 | ||
336 | |a nicht spezifiziert |b zzz |2 rdacontent | ||
337 | |a nicht spezifiziert |b z |2 rdamedia | ||
338 | |a nicht spezifiziert |b zu |2 rdacarrier | ||
520 | |a • A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. | ||
650 | 7 | |a Buffer time control |2 Elsevier | |
650 | 7 | |a Theory of constraints |2 Elsevier | |
650 | 7 | |a Industry 3.5 |2 Elsevier | |
650 | 7 | |a Industry 4.0 |2 Elsevier | |
650 | 7 | |a Due date control |2 Elsevier | |
700 | 1 | |a Hsu, Ni-Ying |4 oth | |
700 | 1 | |a Li, Tzu Yi |4 oth | |
700 | 1 | |a Chao, Chin-Jung |4 oth | |
773 | 0 | 8 | |i Enthalten in |n Soc |a Bayulgen, Oksan ELSEVIER |t Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota |d 2021 |g Dearborn, Mich |w (DE-627)ELV00685088X |
773 | 1 | 8 | |g volume:60 |g year:2021 |g pages:152-161 |g extent:10 |
856 | 4 | 0 | |u https://doi.org/10.1016/j.jmsy.2021.05.009 |3 Volltext |
912 | |a GBV_USEFLAG_U | ||
912 | |a GBV_ELV | ||
912 | |a SYSFLAG_U | ||
936 | b | k | |a 83.65 |j Versorgungswirtschaft |q VZ |
951 | |a AR | ||
952 | |d 60 |j 2021 |h 152-161 |g 10 |
author_variant |
t c k tck |
---|---|
matchkey_str |
kuotsaichihsuniyinglitzuyichaochinjung:2021----:nuty0nbigauatrncmeiieeseieyefracipoee |
hierarchy_sort_str |
2021 |
bklnumber |
83.65 |
publishDate |
2021 |
allfields |
10.1016/j.jmsy.2021.05.009 doi /cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica (DE-627)ELV055031013 (ELSEVIER)S0278-6125(21)00106-0 DE-627 ger DE-627 rakwb eng 620 VZ 83.65 bkl Kuo, Tsai-Chi verfasserin aut Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints 2021 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Elsevier Hsu, Ni-Ying oth Li, Tzu Yi oth Chao, Chin-Jung oth Enthalten in Soc Bayulgen, Oksan ELSEVIER Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota 2021 Dearborn, Mich (DE-627)ELV00685088X volume:60 year:2021 pages:152-161 extent:10 https://doi.org/10.1016/j.jmsy.2021.05.009 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 83.65 Versorgungswirtschaft VZ AR 60 2021 152-161 10 |
spelling |
10.1016/j.jmsy.2021.05.009 doi /cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica (DE-627)ELV055031013 (ELSEVIER)S0278-6125(21)00106-0 DE-627 ger DE-627 rakwb eng 620 VZ 83.65 bkl Kuo, Tsai-Chi verfasserin aut Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints 2021 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Elsevier Hsu, Ni-Ying oth Li, Tzu Yi oth Chao, Chin-Jung oth Enthalten in Soc Bayulgen, Oksan ELSEVIER Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota 2021 Dearborn, Mich (DE-627)ELV00685088X volume:60 year:2021 pages:152-161 extent:10 https://doi.org/10.1016/j.jmsy.2021.05.009 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 83.65 Versorgungswirtschaft VZ AR 60 2021 152-161 10 |
allfields_unstemmed |
10.1016/j.jmsy.2021.05.009 doi /cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica (DE-627)ELV055031013 (ELSEVIER)S0278-6125(21)00106-0 DE-627 ger DE-627 rakwb eng 620 VZ 83.65 bkl Kuo, Tsai-Chi verfasserin aut Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints 2021 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Elsevier Hsu, Ni-Ying oth Li, Tzu Yi oth Chao, Chin-Jung oth Enthalten in Soc Bayulgen, Oksan ELSEVIER Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota 2021 Dearborn, Mich (DE-627)ELV00685088X volume:60 year:2021 pages:152-161 extent:10 https://doi.org/10.1016/j.jmsy.2021.05.009 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 83.65 Versorgungswirtschaft VZ AR 60 2021 152-161 10 |
allfieldsGer |
10.1016/j.jmsy.2021.05.009 doi /cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica (DE-627)ELV055031013 (ELSEVIER)S0278-6125(21)00106-0 DE-627 ger DE-627 rakwb eng 620 VZ 83.65 bkl Kuo, Tsai-Chi verfasserin aut Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints 2021 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Elsevier Hsu, Ni-Ying oth Li, Tzu Yi oth Chao, Chin-Jung oth Enthalten in Soc Bayulgen, Oksan ELSEVIER Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota 2021 Dearborn, Mich (DE-627)ELV00685088X volume:60 year:2021 pages:152-161 extent:10 https://doi.org/10.1016/j.jmsy.2021.05.009 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 83.65 Versorgungswirtschaft VZ AR 60 2021 152-161 10 |
allfieldsSound |
10.1016/j.jmsy.2021.05.009 doi /cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica (DE-627)ELV055031013 (ELSEVIER)S0278-6125(21)00106-0 DE-627 ger DE-627 rakwb eng 620 VZ 83.65 bkl Kuo, Tsai-Chi verfasserin aut Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints 2021 10 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier • A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Elsevier Hsu, Ni-Ying oth Li, Tzu Yi oth Chao, Chin-Jung oth Enthalten in Soc Bayulgen, Oksan ELSEVIER Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota 2021 Dearborn, Mich (DE-627)ELV00685088X volume:60 year:2021 pages:152-161 extent:10 https://doi.org/10.1016/j.jmsy.2021.05.009 Volltext GBV_USEFLAG_U GBV_ELV SYSFLAG_U 83.65 Versorgungswirtschaft VZ AR 60 2021 152-161 10 |
language |
English |
source |
Enthalten in Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota Dearborn, Mich volume:60 year:2021 pages:152-161 extent:10 |
sourceStr |
Enthalten in Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota Dearborn, Mich volume:60 year:2021 pages:152-161 extent:10 |
format_phy_str_mv |
Article |
bklname |
Versorgungswirtschaft |
institution |
findex.gbv.de |
topic_facet |
Buffer time control Theory of constraints Industry 3.5 Industry 4.0 Due date control |
dewey-raw |
620 |
isfreeaccess_bool |
false |
container_title |
Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota |
authorswithroles_txt_mv |
Kuo, Tsai-Chi @@aut@@ Hsu, Ni-Ying @@oth@@ Li, Tzu Yi @@oth@@ Chao, Chin-Jung @@oth@@ |
publishDateDaySort_date |
2021-01-01T00:00:00Z |
hierarchy_top_id |
ELV00685088X |
dewey-sort |
3620 |
id |
ELV055031013 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV055031013</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230624215422.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">210910s2021 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.jmsy.2021.05.009</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">/cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV055031013</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0278-6125(21)00106-0</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">620</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">83.65</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Kuo, Tsai-Chi</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2021</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">10</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">• A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Buffer time control</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Theory of constraints</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Industry 3.5</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Industry 4.0</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Due date control</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Hsu, Ni-Ying</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Li, Tzu Yi</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Chao, Chin-Jung</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="n">Soc</subfield><subfield code="a">Bayulgen, Oksan ELSEVIER</subfield><subfield code="t">Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota</subfield><subfield code="d">2021</subfield><subfield code="g">Dearborn, Mich</subfield><subfield code="w">(DE-627)ELV00685088X</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:60</subfield><subfield code="g">year:2021</subfield><subfield code="g">pages:152-161</subfield><subfield code="g">extent:10</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.jmsy.2021.05.009</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">83.65</subfield><subfield code="j">Versorgungswirtschaft</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">60</subfield><subfield code="j">2021</subfield><subfield code="h">152-161</subfield><subfield code="g">10</subfield></datafield></record></collection>
|
author |
Kuo, Tsai-Chi |
spellingShingle |
Kuo, Tsai-Chi ddc 620 bkl 83.65 Elsevier Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints |
authorStr |
Kuo, Tsai-Chi |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)ELV00685088X |
format |
electronic Article |
dewey-ones |
620 - Engineering & allied operations |
delete_txt_mv |
keep |
author_role |
aut |
collection |
elsevier |
remote_str |
true |
illustrated |
Not Illustrated |
topic_title |
620 VZ 83.65 bkl Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control Elsevier |
topic |
ddc 620 bkl 83.65 Elsevier Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control |
topic_unstemmed |
ddc 620 bkl 83.65 Elsevier Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control |
topic_browse |
ddc 620 bkl 83.65 Elsevier Buffer time control Elsevier Theory of constraints Elsevier Industry 3.5 Elsevier Industry 4.0 Elsevier Due date control |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
zu |
author2_variant |
n y h nyh t y l ty tyl c j c cjc |
hierarchy_parent_title |
Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota |
hierarchy_parent_id |
ELV00685088X |
dewey-tens |
620 - Engineering |
hierarchy_top_title |
Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)ELV00685088X |
title |
Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints |
ctrlnum |
(DE-627)ELV055031013 (ELSEVIER)S0278-6125(21)00106-0 |
title_full |
Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints |
author_sort |
Kuo, Tsai-Chi |
journal |
Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota |
journalStr |
Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
600 - Technology |
recordtype |
marc |
publishDateSort |
2021 |
contenttype_str_mv |
zzz |
container_start_page |
152 |
author_browse |
Kuo, Tsai-Chi |
container_volume |
60 |
physical |
10 |
class |
620 VZ 83.65 bkl |
format_se |
Elektronische Aufsätze |
author-letter |
Kuo, Tsai-Chi |
doi_str_mv |
10.1016/j.jmsy.2021.05.009 |
dewey-full |
620 |
title_sort |
industry 4.0 enabling manufacturing competitiveness: delivery performance improvement based on theory of constraints |
title_auth |
Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints |
abstract |
• A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. |
abstractGer |
• A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. |
abstract_unstemmed |
• A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance. |
collection_details |
GBV_USEFLAG_U GBV_ELV SYSFLAG_U |
title_short |
Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints |
url |
https://doi.org/10.1016/j.jmsy.2021.05.009 |
remote_bool |
true |
author2 |
Hsu, Ni-Ying Li, Tzu Yi Chao, Chin-Jung |
author2Str |
Hsu, Ni-Ying Li, Tzu Yi Chao, Chin-Jung |
ppnlink |
ELV00685088X |
mediatype_str_mv |
z |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth oth |
doi_str |
10.1016/j.jmsy.2021.05.009 |
up_date |
2024-07-06T23:22:50.522Z |
_version_ |
1803873860215373824 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">ELV055031013</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230624215422.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">210910s2021 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1016/j.jmsy.2021.05.009</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">/cbs_pica/cbs_olc/import_discovery/elsevier/einzuspielen/GBV00000000001645.pica</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)ELV055031013</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(ELSEVIER)S0278-6125(21)00106-0</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">620</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="084" ind1=" " ind2=" "><subfield code="a">83.65</subfield><subfield code="2">bkl</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Kuo, Tsai-Chi</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Industry 4.0 enabling manufacturing competitiveness: Delivery performance improvement based on theory of constraints</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2021</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">10</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">• A big challenge for the manufacturers to improve the delivery performance. • A WIP alert system is developed based on the machine-to-machine communication approaches. • An algorithm based on TOC theory is developed in WIP alert system. • WIP manager can collaborate with its supplier to improve the delivery performance.</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Buffer time control</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Theory of constraints</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Industry 3.5</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Industry 4.0</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="650" ind1=" " ind2="7"><subfield code="a">Due date control</subfield><subfield code="2">Elsevier</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Hsu, Ni-Ying</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Li, Tzu Yi</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Chao, Chin-Jung</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="n">Soc</subfield><subfield code="a">Bayulgen, Oksan ELSEVIER</subfield><subfield code="t">Tilting at windmills? Electoral repercussions of wind turbine projects in Minnesota</subfield><subfield code="d">2021</subfield><subfield code="g">Dearborn, Mich</subfield><subfield code="w">(DE-627)ELV00685088X</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:60</subfield><subfield code="g">year:2021</subfield><subfield code="g">pages:152-161</subfield><subfield code="g">extent:10</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://doi.org/10.1016/j.jmsy.2021.05.009</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ELV</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_U</subfield></datafield><datafield tag="936" ind1="b" ind2="k"><subfield code="a">83.65</subfield><subfield code="j">Versorgungswirtschaft</subfield><subfield code="q">VZ</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">60</subfield><subfield code="j">2021</subfield><subfield code="h">152-161</subfield><subfield code="g">10</subfield></datafield></record></collection>
|
score |
7.4006042 |