Magnet power supplies and beam line control for the KEK experimental halls
This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to...
Ausführliche Beschreibung
Autor*in: |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
1994 |
---|
Reproduktion: |
Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 |
---|---|
Übergeordnetes Werk: |
in: Nuclear Instruments and Methods in Physics Research Section A: - Amsterdam : Elsevier, 352(1994), 1-2, Seite 135-136 |
Übergeordnetes Werk: |
volume:352 ; year:1994 ; number:1-2 ; pages:135-136 |
Links: |
---|
Katalog-ID: |
NLEJ181697009 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | NLEJ181697009 | ||
003 | DE-627 | ||
005 | 20210706160948.0 | ||
007 | cr uuu---uuuuu | ||
008 | 070505s1994 xx |||||o 00| ||eng c | ||
035 | |a (DE-627)NLEJ181697009 | ||
035 | |a (DE-599)GBVNLZ181697009 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
245 | 1 | 0 | |a Magnet power supplies and beam line control for the KEK experimental halls |
264 | 1 | |c 1994 | |
336 | |a nicht spezifiziert |b zzz |2 rdacontent | ||
337 | |a nicht spezifiziert |b z |2 rdamedia | ||
338 | |a nicht spezifiziert |b zu |2 rdacarrier | ||
520 | |a This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. | ||
533 | |f Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 | ||
700 | 1 | |a Suzuki, Y. |4 oth | |
700 | 1 | |a Takasaki, M. |4 oth | |
700 | 1 | |a Minakawa, M. |4 oth | |
700 | 1 | |a Ishii, H. |4 oth | |
700 | 1 | |a Kato, Y. |4 oth | |
700 | 1 | |a Ieiri, M. |4 oth | |
700 | 1 | |a Tanaka, K.H. |4 oth | |
700 | 1 | |a Noumi, H. |4 oth | |
700 | 1 | |a Yamanoi, Y. |4 oth | |
773 | 0 | 8 | |i in |t Nuclear Instruments and Methods in Physics Research Section A: |d Amsterdam : Elsevier |g 352(1994), 1-2, Seite 135-136 |w (DE-627)NLEJ180854372 |w (DE-600)1466532-3 |x 0168-9002 |7 nnns |
773 | 1 | 8 | |g volume:352 |g year:1994 |g number:1-2 |g pages:135-136 |
856 | 4 | 0 | |u http://dx.doi.org/10.1016/0168-9002(94)91481-8 |
912 | |a GBV_USEFLAG_H | ||
912 | |a ZDB-1-SDJ | ||
912 | |a GBV_NL_ARTICLE | ||
951 | |a AR | ||
952 | |d 352 |j 1994 |e 1-2 |h 135-136 |
matchkey_str |
article:01689002:1994----::antoespleademieotofrhk |
---|---|
hierarchy_sort_str |
1994 |
publishDate |
1994 |
allfields |
(DE-627)NLEJ181697009 (DE-599)GBVNLZ181697009 DE-627 ger DE-627 rakwb eng Magnet power supplies and beam line control for the KEK experimental halls 1994 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 Suzuki, Y. oth Takasaki, M. oth Minakawa, M. oth Ishii, H. oth Kato, Y. oth Ieiri, M. oth Tanaka, K.H. oth Noumi, H. oth Yamanoi, Y. oth in Nuclear Instruments and Methods in Physics Research Section A: Amsterdam : Elsevier 352(1994), 1-2, Seite 135-136 (DE-627)NLEJ180854372 (DE-600)1466532-3 0168-9002 nnns volume:352 year:1994 number:1-2 pages:135-136 http://dx.doi.org/10.1016/0168-9002(94)91481-8 GBV_USEFLAG_H ZDB-1-SDJ GBV_NL_ARTICLE AR 352 1994 1-2 135-136 |
spelling |
(DE-627)NLEJ181697009 (DE-599)GBVNLZ181697009 DE-627 ger DE-627 rakwb eng Magnet power supplies and beam line control for the KEK experimental halls 1994 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 Suzuki, Y. oth Takasaki, M. oth Minakawa, M. oth Ishii, H. oth Kato, Y. oth Ieiri, M. oth Tanaka, K.H. oth Noumi, H. oth Yamanoi, Y. oth in Nuclear Instruments and Methods in Physics Research Section A: Amsterdam : Elsevier 352(1994), 1-2, Seite 135-136 (DE-627)NLEJ180854372 (DE-600)1466532-3 0168-9002 nnns volume:352 year:1994 number:1-2 pages:135-136 http://dx.doi.org/10.1016/0168-9002(94)91481-8 GBV_USEFLAG_H ZDB-1-SDJ GBV_NL_ARTICLE AR 352 1994 1-2 135-136 |
allfields_unstemmed |
(DE-627)NLEJ181697009 (DE-599)GBVNLZ181697009 DE-627 ger DE-627 rakwb eng Magnet power supplies and beam line control for the KEK experimental halls 1994 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 Suzuki, Y. oth Takasaki, M. oth Minakawa, M. oth Ishii, H. oth Kato, Y. oth Ieiri, M. oth Tanaka, K.H. oth Noumi, H. oth Yamanoi, Y. oth in Nuclear Instruments and Methods in Physics Research Section A: Amsterdam : Elsevier 352(1994), 1-2, Seite 135-136 (DE-627)NLEJ180854372 (DE-600)1466532-3 0168-9002 nnns volume:352 year:1994 number:1-2 pages:135-136 http://dx.doi.org/10.1016/0168-9002(94)91481-8 GBV_USEFLAG_H ZDB-1-SDJ GBV_NL_ARTICLE AR 352 1994 1-2 135-136 |
allfieldsGer |
(DE-627)NLEJ181697009 (DE-599)GBVNLZ181697009 DE-627 ger DE-627 rakwb eng Magnet power supplies and beam line control for the KEK experimental halls 1994 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 Suzuki, Y. oth Takasaki, M. oth Minakawa, M. oth Ishii, H. oth Kato, Y. oth Ieiri, M. oth Tanaka, K.H. oth Noumi, H. oth Yamanoi, Y. oth in Nuclear Instruments and Methods in Physics Research Section A: Amsterdam : Elsevier 352(1994), 1-2, Seite 135-136 (DE-627)NLEJ180854372 (DE-600)1466532-3 0168-9002 nnns volume:352 year:1994 number:1-2 pages:135-136 http://dx.doi.org/10.1016/0168-9002(94)91481-8 GBV_USEFLAG_H ZDB-1-SDJ GBV_NL_ARTICLE AR 352 1994 1-2 135-136 |
allfieldsSound |
(DE-627)NLEJ181697009 (DE-599)GBVNLZ181697009 DE-627 ger DE-627 rakwb eng Magnet power supplies and beam line control for the KEK experimental halls 1994 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 Suzuki, Y. oth Takasaki, M. oth Minakawa, M. oth Ishii, H. oth Kato, Y. oth Ieiri, M. oth Tanaka, K.H. oth Noumi, H. oth Yamanoi, Y. oth in Nuclear Instruments and Methods in Physics Research Section A: Amsterdam : Elsevier 352(1994), 1-2, Seite 135-136 (DE-627)NLEJ180854372 (DE-600)1466532-3 0168-9002 nnns volume:352 year:1994 number:1-2 pages:135-136 http://dx.doi.org/10.1016/0168-9002(94)91481-8 GBV_USEFLAG_H ZDB-1-SDJ GBV_NL_ARTICLE AR 352 1994 1-2 135-136 |
language |
English |
source |
in Nuclear Instruments and Methods in Physics Research Section A: 352(1994), 1-2, Seite 135-136 volume:352 year:1994 number:1-2 pages:135-136 |
sourceStr |
in Nuclear Instruments and Methods in Physics Research Section A: 352(1994), 1-2, Seite 135-136 volume:352 year:1994 number:1-2 pages:135-136 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
isfreeaccess_bool |
false |
container_title |
Nuclear Instruments and Methods in Physics Research Section A: |
authorswithroles_txt_mv |
Suzuki, Y. @@oth@@ Takasaki, M. @@oth@@ Minakawa, M. @@oth@@ Ishii, H. @@oth@@ Kato, Y. @@oth@@ Ieiri, M. @@oth@@ Tanaka, K.H. @@oth@@ Noumi, H. @@oth@@ Yamanoi, Y. @@oth@@ |
publishDateDaySort_date |
1994-01-01T00:00:00Z |
hierarchy_top_id |
NLEJ180854372 |
id |
NLEJ181697009 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">NLEJ181697009</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20210706160948.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">070505s1994 xx |||||o 00| ||eng c</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)NLEJ181697009</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVNLZ181697009</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Magnet power supplies and beam line control for the KEK experimental halls</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">1994</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system.</subfield></datafield><datafield tag="533" ind1=" " ind2=" "><subfield code="f">Elsevier Journal Backfiles on ScienceDirect 1907 - 2002</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Suzuki, Y.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Takasaki, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Minakawa, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Ishii, H.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Kato, Y.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Ieiri, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Tanaka, K.H.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Noumi, H.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Yamanoi, Y.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">in</subfield><subfield code="t">Nuclear Instruments and Methods in Physics Research Section A:</subfield><subfield code="d">Amsterdam : Elsevier</subfield><subfield code="g">352(1994), 1-2, Seite 135-136</subfield><subfield code="w">(DE-627)NLEJ180854372</subfield><subfield code="w">(DE-600)1466532-3</subfield><subfield code="x">0168-9002</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:352</subfield><subfield code="g">year:1994</subfield><subfield code="g">number:1-2</subfield><subfield code="g">pages:135-136</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://dx.doi.org/10.1016/0168-9002(94)91481-8</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_H</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-SDJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_NL_ARTICLE</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">352</subfield><subfield code="j">1994</subfield><subfield code="e">1-2</subfield><subfield code="h">135-136</subfield></datafield></record></collection>
|
series2 |
Elsevier Journal Backfiles on ScienceDirect 1907 - 2002 |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)NLEJ180854372 |
format |
electronic Article |
delete_txt_mv |
keep |
collection |
NL |
remote_str |
true |
illustrated |
Not Illustrated |
issn |
0168-9002 |
topic_title |
Magnet power supplies and beam line control for the KEK experimental halls |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
zu |
author2_variant |
y s ys m t mt m m mm h i hi y k yk m i mi k t kt h n hn y y yy |
hierarchy_parent_title |
Nuclear Instruments and Methods in Physics Research Section A: |
hierarchy_parent_id |
NLEJ180854372 |
hierarchy_top_title |
Nuclear Instruments and Methods in Physics Research Section A: |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)NLEJ180854372 (DE-600)1466532-3 |
title |
Magnet power supplies and beam line control for the KEK experimental halls |
spellingShingle |
Magnet power supplies and beam line control for the KEK experimental halls |
ctrlnum |
(DE-627)NLEJ181697009 (DE-599)GBVNLZ181697009 |
title_full |
Magnet power supplies and beam line control for the KEK experimental halls |
journal |
Nuclear Instruments and Methods in Physics Research Section A: |
journalStr |
Nuclear Instruments and Methods in Physics Research Section A: |
lang_code |
eng |
isOA_bool |
false |
recordtype |
marc |
publishDateSort |
1994 |
contenttype_str_mv |
zzz |
container_start_page |
135 |
container_volume |
352 |
format_se |
Elektronische Aufsätze |
title_sort |
magnet power supplies and beam line control for the kek experimental halls |
title_auth |
Magnet power supplies and beam line control for the KEK experimental halls |
abstract |
This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. |
abstractGer |
This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. |
abstract_unstemmed |
This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system. |
collection_details |
GBV_USEFLAG_H ZDB-1-SDJ GBV_NL_ARTICLE |
container_issue |
1-2 |
title_short |
Magnet power supplies and beam line control for the KEK experimental halls |
url |
http://dx.doi.org/10.1016/0168-9002(94)91481-8 |
remote_bool |
true |
author2 |
Suzuki, Y. Takasaki, M. Minakawa, M. Ishii, H. Kato, Y. Ieiri, M. Tanaka, K.H. Noumi, H. Yamanoi, Y. |
author2Str |
Suzuki, Y. Takasaki, M. Minakawa, M. Ishii, H. Kato, Y. Ieiri, M. Tanaka, K.H. Noumi, H. Yamanoi, Y. |
ppnlink |
NLEJ180854372 |
mediatype_str_mv |
z |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth oth oth oth oth oth oth oth |
up_date |
2024-07-06T07:21:12.340Z |
_version_ |
1803813359285436416 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">NLEJ181697009</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20210706160948.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">070505s1994 xx |||||o 00| ||eng c</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)NLEJ181697009</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVNLZ181697009</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Magnet power supplies and beam line control for the KEK experimental halls</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">1994</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This paper describes the control system for magnet power supplies and many beam lines in two experimental halls at the 12 GeV proton synchrotron at KEK. In the experimental halls, many beam lines have been constructed, cleared away or modified every year since 1974. With this experience, in order to reduce construction time, cost, maintenance and manpower, we are now using a distributed control system, with the following features: - each power supply is equipped with a microprocessor and communications interface, - each beam line has an independent control system, - each beam line controller is connected to a central controller, providing a unified system.</subfield></datafield><datafield tag="533" ind1=" " ind2=" "><subfield code="f">Elsevier Journal Backfiles on ScienceDirect 1907 - 2002</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Suzuki, Y.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Takasaki, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Minakawa, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Ishii, H.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Kato, Y.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Ieiri, M.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Tanaka, K.H.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Noumi, H.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Yamanoi, Y.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">in</subfield><subfield code="t">Nuclear Instruments and Methods in Physics Research Section A:</subfield><subfield code="d">Amsterdam : Elsevier</subfield><subfield code="g">352(1994), 1-2, Seite 135-136</subfield><subfield code="w">(DE-627)NLEJ180854372</subfield><subfield code="w">(DE-600)1466532-3</subfield><subfield code="x">0168-9002</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:352</subfield><subfield code="g">year:1994</subfield><subfield code="g">number:1-2</subfield><subfield code="g">pages:135-136</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://dx.doi.org/10.1016/0168-9002(94)91481-8</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_H</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-SDJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_NL_ARTICLE</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">352</subfield><subfield code="j">1994</subfield><subfield code="e">1-2</subfield><subfield code="h">135-136</subfield></datafield></record></collection>
|
score |
7.402356 |