Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations
Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stat...
Ausführliche Beschreibung
Autor*in: |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
1973 |
---|
Umfang: |
3 |
---|
Reproduktion: |
Springer Online Journal Archives 1860-2002 |
---|---|
Übergeordnetes Werk: |
in: Power technology and engineering - 1967, 7(1973) vom: Nov., Seite 1052-1054 |
Übergeordnetes Werk: |
volume:7 ; year:1973 ; month:11 ; pages:1052-1054 ; extent:3 |
Links: |
---|
Katalog-ID: |
NLEJ190725087 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | NLEJ190725087 | ||
003 | DE-627 | ||
005 | 20210707152129.0 | ||
007 | cr uuu---uuuuu | ||
008 | 070525s1973 xx |||||o 00| ||eng c | ||
035 | |a (DE-627)NLEJ190725087 | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
245 | 1 | 0 | |a Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
264 | 1 | |c 1973 | |
300 | |a 3 | ||
336 | |a nicht spezifiziert |b zzz |2 rdacontent | ||
337 | |a nicht spezifiziert |b z |2 rdamedia | ||
338 | |a nicht spezifiziert |b zu |2 rdacarrier | ||
520 | |a Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. | ||
533 | |f Springer Online Journal Archives 1860-2002 | ||
700 | 1 | |a El'manov, B. A. |4 oth | |
700 | 1 | |a Chilingaryan, A. A. |4 oth | |
773 | 0 | 8 | |i in |t Power technology and engineering |d 1967 |g 7(1973) vom: Nov., Seite 1052-1054 |w (DE-627)NLEJ188988483 |w (DE-600)2037320-X |x 1570-1468 |7 nnns |
773 | 1 | 8 | |g volume:7 |g year:1973 |g month:11 |g pages:1052-1054 |g extent:3 |
856 | 4 | 0 | |u http://dx.doi.org/10.1007/BF02383339 |
912 | |a GBV_USEFLAG_U | ||
912 | |a ZDB-1-SOJ | ||
912 | |a GBV_NL_ARTICLE | ||
951 | |a AR | ||
952 | |d 7 |j 1973 |c 11 |h 1052-1054 |g 3 |
matchkey_str |
article:15701468:1973----::vroighgpeoeanhsqecovrohd |
---|---|
hierarchy_sort_str |
1973 |
publishDate |
1973 |
allfields |
(DE-627)NLEJ190725087 DE-627 ger DE-627 rakwb eng Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations 1973 3 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. Springer Online Journal Archives 1860-2002 El'manov, B. A. oth Chilingaryan, A. A. oth in Power technology and engineering 1967 7(1973) vom: Nov., Seite 1052-1054 (DE-627)NLEJ188988483 (DE-600)2037320-X 1570-1468 nnns volume:7 year:1973 month:11 pages:1052-1054 extent:3 http://dx.doi.org/10.1007/BF02383339 GBV_USEFLAG_U ZDB-1-SOJ GBV_NL_ARTICLE AR 7 1973 11 1052-1054 3 |
spelling |
(DE-627)NLEJ190725087 DE-627 ger DE-627 rakwb eng Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations 1973 3 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. Springer Online Journal Archives 1860-2002 El'manov, B. A. oth Chilingaryan, A. A. oth in Power technology and engineering 1967 7(1973) vom: Nov., Seite 1052-1054 (DE-627)NLEJ188988483 (DE-600)2037320-X 1570-1468 nnns volume:7 year:1973 month:11 pages:1052-1054 extent:3 http://dx.doi.org/10.1007/BF02383339 GBV_USEFLAG_U ZDB-1-SOJ GBV_NL_ARTICLE AR 7 1973 11 1052-1054 3 |
allfields_unstemmed |
(DE-627)NLEJ190725087 DE-627 ger DE-627 rakwb eng Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations 1973 3 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. Springer Online Journal Archives 1860-2002 El'manov, B. A. oth Chilingaryan, A. A. oth in Power technology and engineering 1967 7(1973) vom: Nov., Seite 1052-1054 (DE-627)NLEJ188988483 (DE-600)2037320-X 1570-1468 nnns volume:7 year:1973 month:11 pages:1052-1054 extent:3 http://dx.doi.org/10.1007/BF02383339 GBV_USEFLAG_U ZDB-1-SOJ GBV_NL_ARTICLE AR 7 1973 11 1052-1054 3 |
allfieldsGer |
(DE-627)NLEJ190725087 DE-627 ger DE-627 rakwb eng Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations 1973 3 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. Springer Online Journal Archives 1860-2002 El'manov, B. A. oth Chilingaryan, A. A. oth in Power technology and engineering 1967 7(1973) vom: Nov., Seite 1052-1054 (DE-627)NLEJ188988483 (DE-600)2037320-X 1570-1468 nnns volume:7 year:1973 month:11 pages:1052-1054 extent:3 http://dx.doi.org/10.1007/BF02383339 GBV_USEFLAG_U ZDB-1-SOJ GBV_NL_ARTICLE AR 7 1973 11 1052-1054 3 |
allfieldsSound |
(DE-627)NLEJ190725087 DE-627 ger DE-627 rakwb eng Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations 1973 3 nicht spezifiziert zzz rdacontent nicht spezifiziert z rdamedia nicht spezifiziert zu rdacarrier Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. Springer Online Journal Archives 1860-2002 El'manov, B. A. oth Chilingaryan, A. A. oth in Power technology and engineering 1967 7(1973) vom: Nov., Seite 1052-1054 (DE-627)NLEJ188988483 (DE-600)2037320-X 1570-1468 nnns volume:7 year:1973 month:11 pages:1052-1054 extent:3 http://dx.doi.org/10.1007/BF02383339 GBV_USEFLAG_U ZDB-1-SOJ GBV_NL_ARTICLE AR 7 1973 11 1052-1054 3 |
language |
English |
source |
in Power technology and engineering 7(1973) vom: Nov., Seite 1052-1054 volume:7 year:1973 month:11 pages:1052-1054 extent:3 |
sourceStr |
in Power technology and engineering 7(1973) vom: Nov., Seite 1052-1054 volume:7 year:1973 month:11 pages:1052-1054 extent:3 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
isfreeaccess_bool |
false |
container_title |
Power technology and engineering |
authorswithroles_txt_mv |
El'manov, B. A. @@oth@@ Chilingaryan, A. A. @@oth@@ |
publishDateDaySort_date |
1973-11-01T00:00:00Z |
hierarchy_top_id |
NLEJ188988483 |
id |
NLEJ190725087 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">NLEJ190725087</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20210707152129.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">070525s1973 xx |||||o 00| ||eng c</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)NLEJ190725087</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">1973</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">3</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant.</subfield></datafield><datafield tag="533" ind1=" " ind2=" "><subfield code="f">Springer Online Journal Archives 1860-2002</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">El'manov, B. A.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Chilingaryan, A. A.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">in</subfield><subfield code="t">Power technology and engineering</subfield><subfield code="d">1967</subfield><subfield code="g">7(1973) vom: Nov., Seite 1052-1054</subfield><subfield code="w">(DE-627)NLEJ188988483</subfield><subfield code="w">(DE-600)2037320-X</subfield><subfield code="x">1570-1468</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:7</subfield><subfield code="g">year:1973</subfield><subfield code="g">month:11</subfield><subfield code="g">pages:1052-1054</subfield><subfield code="g">extent:3</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://dx.doi.org/10.1007/BF02383339</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-SOJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_NL_ARTICLE</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">7</subfield><subfield code="j">1973</subfield><subfield code="c">11</subfield><subfield code="h">1052-1054</subfield><subfield code="g">3</subfield></datafield></record></collection>
|
series2 |
Springer Online Journal Archives 1860-2002 |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)NLEJ188988483 |
format |
electronic Article |
delete_txt_mv |
keep |
collection |
NL |
remote_str |
true |
illustrated |
Not Illustrated |
issn |
1570-1468 |
topic_title |
Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
zu |
author2_variant |
b a e ba bae a a c aa aac |
hierarchy_parent_title |
Power technology and engineering |
hierarchy_parent_id |
NLEJ188988483 |
hierarchy_top_title |
Power technology and engineering |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)NLEJ188988483 (DE-600)2037320-X |
title |
Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
spellingShingle |
Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
ctrlnum |
(DE-627)NLEJ190725087 |
title_full |
Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
journal |
Power technology and engineering |
journalStr |
Power technology and engineering |
lang_code |
eng |
isOA_bool |
false |
recordtype |
marc |
publishDateSort |
1973 |
contenttype_str_mv |
zzz |
container_start_page |
1052 |
container_volume |
7 |
physical |
3 |
format_se |
Elektronische Aufsätze |
title_sort |
overcoming shuga phenomena on the sequence of varzob hydroelectric stations |
title_auth |
Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
abstract |
Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. |
abstractGer |
Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. |
abstract_unstemmed |
Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant. |
collection_details |
GBV_USEFLAG_U ZDB-1-SOJ GBV_NL_ARTICLE |
title_short |
Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations |
url |
http://dx.doi.org/10.1007/BF02383339 |
remote_bool |
true |
author2 |
El'manov, B. A. Chilingaryan, A. A. |
author2Str |
El'manov, B. A. Chilingaryan, A. A. |
ppnlink |
NLEJ188988483 |
mediatype_str_mv |
z |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth |
up_date |
2024-07-06T04:36:37.535Z |
_version_ |
1803803004805054464 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">NLEJ190725087</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20210707152129.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">070525s1973 xx |||||o 00| ||eng c</controlfield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)NLEJ190725087</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Overcoming shuga phenomena on the sequence of Varzob hydroelectric stations</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">1973</subfield></datafield><datafield tag="300" ind1=" " ind2=" "><subfield code="a">3</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zzz</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">z</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">nicht spezifiziert</subfield><subfield code="b">zu</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Conclusions 1. The method of overcoming shuga difficulties by accumulating the shuga in the diversion canal of Station 2 with a rise in the water level in the forebay of Station 2, which was used for the first time during the operating period of Station 2 of the sequence of Varzob hydroelectric stations, proved to be correct. 2. Accumulation of the shuga in the diversion canal of Station 2 permitted providing a continuous and unlimited supply of water to important consumers. 3. The measures used saved water by not discharging shuga from the forebay of Station 1 and thereby supplied water to the Dushanbe heat and electric power plant. In so doing the requirement of not allowing shuga into the water line of the plant was fulfilled. 4. During the crucial period of the winter maximum the measures taken provided in the power system reliable operation of the Varzob hydroelectric station sequence and of the system base-load electric station, the Dushanbe heat and electric plant.</subfield></datafield><datafield tag="533" ind1=" " ind2=" "><subfield code="f">Springer Online Journal Archives 1860-2002</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">El'manov, B. A.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Chilingaryan, A. A.</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">in</subfield><subfield code="t">Power technology and engineering</subfield><subfield code="d">1967</subfield><subfield code="g">7(1973) vom: Nov., Seite 1052-1054</subfield><subfield code="w">(DE-627)NLEJ188988483</subfield><subfield code="w">(DE-600)2037320-X</subfield><subfield code="x">1570-1468</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:7</subfield><subfield code="g">year:1973</subfield><subfield code="g">month:11</subfield><subfield code="g">pages:1052-1054</subfield><subfield code="g">extent:3</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">http://dx.doi.org/10.1007/BF02383339</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_U</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">ZDB-1-SOJ</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_NL_ARTICLE</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">7</subfield><subfield code="j">1973</subfield><subfield code="c">11</subfield><subfield code="h">1052-1054</subfield><subfield code="g">3</subfield></datafield></record></collection>
|
score |
7.4010057 |