Live Grid Field-Testing Final Results of the First Italian Superconducting Fault Current Limiter and Severe 3-Phase Fault Experience

The first Italian Superconducting Fault Current Limiter 9 kV/3.4 MVA was developed and lab tested by Ricerca sul Sistema Energetico S.p.A. and then installed in the Milan distribution grid belonging to A2A Reti Elettriche S.p.A. This resistive-type SFCL device was operational since March 2012 and he...
Ausführliche Beschreibung

Gespeichert in:
Autor*in:

Martini, L [verfasserIn]

Bocchi, M

Angeli, G

Ascade, M

Rossi, V

Valzasina, A

Ravetta, C

Fratti, S

Martino, E

Format:

Artikel

Sprache:

Englisch

Erschienen:

2015

Schlagwörter:

3-phase fault experience

Italian superconducting fault current limiter

test equipment

superconducting fault current limiters

Fault current limiters

substation protection

live grid field-testing

short-circuit current limitation

Fault Current Limiter

Resistance

Circuit faults

resistive-type SFCL device

high-temperature superconductors

substation

power grids

voltage 9 kV

Windings

Milan distribution grid

Hightemperature superconductors

Short-circuit

apparent power 3.4 MVA

three-phase short-circuit event

Substations

Distribution Grid

A2A hosting utility

Superconductivity

short-circuit currents

Übergeordnetes Werk:

Enthalten in: IEEE transactions on applied superconductivity - New York, NY : Inst., 1991, 25(2015), 3, Seite 1-5

Übergeordnetes Werk:

volume:25 ; year:2015 ; number:3 ; pages:1-5

Links:

Volltext
Link aufrufen

DOI / URN:

10.1109/TASC.2014.2371917

Katalog-ID:

OLC1958925330

Nicht das Richtige dabei?

Schreiben Sie uns!