ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools
This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide...
Ausführliche Beschreibung
Autor*in: |
Carrie Nielson [verfasserIn] |
---|
Format: |
Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2015 |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
Enthalten in: ITE journal - Arlington, Va. : ITE, 1978, 85(2015), 4, Seite 18 |
---|---|
Übergeordnetes Werk: |
volume:85 ; year:2015 ; number:4 ; pages:18 |
Links: |
---|
Katalog-ID: |
OLC1964245354 |
---|
LEADER | 01000caa a2200265 4500 | ||
---|---|---|---|
001 | OLC1964245354 | ||
003 | DE-627 | ||
005 | 20230714162146.0 | ||
007 | tu | ||
008 | 160206s2015 xx ||||| 00| ||eng c | ||
028 | 5 | 2 | |a PQ20160617 |
035 | |a (DE-627)OLC1964245354 | ||
035 | |a (DE-599)GBVOLC1964245354 | ||
035 | |a (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 | ||
035 | |a (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
082 | 0 | 4 | |a 380 |q ZDB |
100 | 0 | |a Carrie Nielson |e verfasserin |4 aut | |
245 | 1 | 0 | |a ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools |
264 | 1 | |c 2015 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a ohne Hilfsmittel zu benutzen |b n |2 rdamedia | ||
338 | |a Band |b nc |2 rdacarrier | ||
520 | |a This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. | ||
650 | 4 | |a Urban planning | |
650 | 4 | |a Installations | |
650 | 4 | |a Design engineering | |
650 | 4 | |a Transportation planning | |
650 | 4 | |a Roads & highways | |
700 | 0 | |a Ryan McClain |4 oth | |
700 | 0 | |a Dan Hennessey |4 oth | |
773 | 0 | 8 | |i Enthalten in |t ITE journal |d Arlington, Va. : ITE, 1978 |g 85(2015), 4, Seite 18 |w (DE-627)129456624 |w (DE-600)199650-2 |w (DE-576)014819929 |x 0148-0170 |7 nnns |
773 | 1 | 8 | |g volume:85 |g year:2015 |g number:4 |g pages:18 |
856 | 4 | 2 | |u http://search.proquest.com/docview/1717292096 |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_OLC | ||
912 | |a SSG-OLC-TEC | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_2006 | ||
912 | |a GBV_ILN_2016 | ||
912 | |a GBV_ILN_4307 | ||
951 | |a AR | ||
952 | |d 85 |j 2015 |e 4 |h 18 |
author_variant |
c n cn |
---|---|
matchkey_str |
article:01480170:2015----::niernitrmeinntciaubnsfocsefcieucipoeett |
hierarchy_sort_str |
2015 |
publishDate |
2015 |
allfields |
PQ20160617 (DE-627)OLC1964245354 (DE-599)GBVOLC1964245354 (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos DE-627 ger DE-627 rakwb eng 380 ZDB Carrie Nielson verfasserin aut ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools 2015 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. Urban planning Installations Design engineering Transportation planning Roads & highways Ryan McClain oth Dan Hennessey oth Enthalten in ITE journal Arlington, Va. : ITE, 1978 85(2015), 4, Seite 18 (DE-627)129456624 (DE-600)199650-2 (DE-576)014819929 0148-0170 nnns volume:85 year:2015 number:4 pages:18 http://search.proquest.com/docview/1717292096 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_2016 GBV_ILN_4307 AR 85 2015 4 18 |
spelling |
PQ20160617 (DE-627)OLC1964245354 (DE-599)GBVOLC1964245354 (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos DE-627 ger DE-627 rakwb eng 380 ZDB Carrie Nielson verfasserin aut ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools 2015 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. Urban planning Installations Design engineering Transportation planning Roads & highways Ryan McClain oth Dan Hennessey oth Enthalten in ITE journal Arlington, Va. : ITE, 1978 85(2015), 4, Seite 18 (DE-627)129456624 (DE-600)199650-2 (DE-576)014819929 0148-0170 nnns volume:85 year:2015 number:4 pages:18 http://search.proquest.com/docview/1717292096 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_2016 GBV_ILN_4307 AR 85 2015 4 18 |
allfields_unstemmed |
PQ20160617 (DE-627)OLC1964245354 (DE-599)GBVOLC1964245354 (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos DE-627 ger DE-627 rakwb eng 380 ZDB Carrie Nielson verfasserin aut ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools 2015 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. Urban planning Installations Design engineering Transportation planning Roads & highways Ryan McClain oth Dan Hennessey oth Enthalten in ITE journal Arlington, Va. : ITE, 1978 85(2015), 4, Seite 18 (DE-627)129456624 (DE-600)199650-2 (DE-576)014819929 0148-0170 nnns volume:85 year:2015 number:4 pages:18 http://search.proquest.com/docview/1717292096 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_2016 GBV_ILN_4307 AR 85 2015 4 18 |
allfieldsGer |
PQ20160617 (DE-627)OLC1964245354 (DE-599)GBVOLC1964245354 (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos DE-627 ger DE-627 rakwb eng 380 ZDB Carrie Nielson verfasserin aut ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools 2015 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. Urban planning Installations Design engineering Transportation planning Roads & highways Ryan McClain oth Dan Hennessey oth Enthalten in ITE journal Arlington, Va. : ITE, 1978 85(2015), 4, Seite 18 (DE-627)129456624 (DE-600)199650-2 (DE-576)014819929 0148-0170 nnns volume:85 year:2015 number:4 pages:18 http://search.proquest.com/docview/1717292096 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_2016 GBV_ILN_4307 AR 85 2015 4 18 |
allfieldsSound |
PQ20160617 (DE-627)OLC1964245354 (DE-599)GBVOLC1964245354 (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos DE-627 ger DE-627 rakwb eng 380 ZDB Carrie Nielson verfasserin aut ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools 2015 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. Urban planning Installations Design engineering Transportation planning Roads & highways Ryan McClain oth Dan Hennessey oth Enthalten in ITE journal Arlington, Va. : ITE, 1978 85(2015), 4, Seite 18 (DE-627)129456624 (DE-600)199650-2 (DE-576)014819929 0148-0170 nnns volume:85 year:2015 number:4 pages:18 http://search.proquest.com/docview/1717292096 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_2016 GBV_ILN_4307 AR 85 2015 4 18 |
language |
English |
source |
Enthalten in ITE journal 85(2015), 4, Seite 18 volume:85 year:2015 number:4 pages:18 |
sourceStr |
Enthalten in ITE journal 85(2015), 4, Seite 18 volume:85 year:2015 number:4 pages:18 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Urban planning Installations Design engineering Transportation planning Roads & highways |
dewey-raw |
380 |
isfreeaccess_bool |
false |
container_title |
ITE journal |
authorswithroles_txt_mv |
Carrie Nielson @@aut@@ Ryan McClain @@oth@@ Dan Hennessey @@oth@@ |
publishDateDaySort_date |
2015-01-01T00:00:00Z |
hierarchy_top_id |
129456624 |
dewey-sort |
3380 |
id |
OLC1964245354 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a2200265 4500</leader><controlfield tag="001">OLC1964245354</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230714162146.0</controlfield><controlfield tag="007">tu</controlfield><controlfield tag="008">160206s2015 xx ||||| 00| ||eng c</controlfield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">PQ20160617</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)OLC1964245354</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVOLC1964245354</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">380</subfield><subfield code="q">ZDB</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Carrie Nielson</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2015</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">ohne Hilfsmittel zu benutzen</subfield><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Band</subfield><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Urban planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Installations</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Design engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Transportation planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Roads & highways</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Ryan McClain</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Dan Hennessey</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">ITE journal</subfield><subfield code="d">Arlington, Va. : ITE, 1978</subfield><subfield code="g">85(2015), 4, Seite 18</subfield><subfield code="w">(DE-627)129456624</subfield><subfield code="w">(DE-600)199650-2</subfield><subfield code="w">(DE-576)014819929</subfield><subfield code="x">0148-0170</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:85</subfield><subfield code="g">year:2015</subfield><subfield code="g">number:4</subfield><subfield code="g">pages:18</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">http://search.proquest.com/docview/1717292096</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_OLC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-TEC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2016</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">85</subfield><subfield code="j">2015</subfield><subfield code="e">4</subfield><subfield code="h">18</subfield></datafield></record></collection>
|
author |
Carrie Nielson |
spellingShingle |
Carrie Nielson ddc 380 misc Urban planning misc Installations misc Design engineering misc Transportation planning misc Roads & highways ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools |
authorStr |
Carrie Nielson |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)129456624 |
format |
Article |
dewey-ones |
380 - Commerce, communications & transportation |
delete_txt_mv |
keep |
author_role |
aut |
collection |
OLC |
remote_str |
false |
illustrated |
Not Illustrated |
issn |
0148-0170 |
topic_title |
380 ZDB ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools Urban planning Installations Design engineering Transportation planning Roads & highways |
topic |
ddc 380 misc Urban planning misc Installations misc Design engineering misc Transportation planning misc Roads & highways |
topic_unstemmed |
ddc 380 misc Urban planning misc Installations misc Design engineering misc Transportation planning misc Roads & highways |
topic_browse |
ddc 380 misc Urban planning misc Installations misc Design engineering misc Transportation planning misc Roads & highways |
format_facet |
Aufsätze Gedruckte Aufsätze |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
nc |
author2_variant |
r m rm d h dh |
hierarchy_parent_title |
ITE journal |
hierarchy_parent_id |
129456624 |
dewey-tens |
380 - Commerce, communications & transportation |
hierarchy_top_title |
ITE journal |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)129456624 (DE-600)199650-2 (DE-576)014819929 |
title |
ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools |
ctrlnum |
(DE-627)OLC1964245354 (DE-599)GBVOLC1964245354 (PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250 (KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos |
title_full |
ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools |
author_sort |
Carrie Nielson |
journal |
ITE journal |
journalStr |
ITE journal |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
300 - Social sciences |
recordtype |
marc |
publishDateSort |
2015 |
contenttype_str_mv |
txt |
container_start_page |
18 |
author_browse |
Carrie Nielson |
container_volume |
85 |
class |
380 ZDB |
format_se |
Aufsätze |
author-letter |
Carrie Nielson |
dewey-full |
380 |
title_sort |
engineering interim design and tactical urbanism: from cost-effective, quick improvements to powerful public outreach tools |
title_auth |
ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools |
abstract |
This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. |
abstractGer |
This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. |
abstract_unstemmed |
This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_2016 GBV_ILN_4307 |
container_issue |
4 |
title_short |
ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools |
url |
http://search.proquest.com/docview/1717292096 |
remote_bool |
false |
author2 |
Ryan McClain Dan Hennessey |
author2Str |
Ryan McClain Dan Hennessey |
ppnlink |
129456624 |
mediatype_str_mv |
n |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth |
up_date |
2024-07-03T13:19:55.758Z |
_version_ |
1803564137325789184 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a2200265 4500</leader><controlfield tag="001">OLC1964245354</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230714162146.0</controlfield><controlfield tag="007">tu</controlfield><controlfield tag="008">160206s2015 xx ||||| 00| ||eng c</controlfield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">PQ20160617</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)OLC1964245354</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVOLC1964245354</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(PRQ)p751-7eec54be5db956cffa48d4fcd8dc11eded7867183325d4cc02dcdfdca468250</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(KEY)0028004620150000085000400018engineeringinterimdesignandtacticalurbanismfromcos</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">380</subfield><subfield code="q">ZDB</subfield></datafield><datafield tag="100" ind1="0" ind2=" "><subfield code="a">Carrie Nielson</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">ENGINEERING INTERIM DESIGN AND TACTICAL URBANISM: From Cost-Effective, Quick Improvements to Powerful Public Outreach Tools</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2015</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">ohne Hilfsmittel zu benutzen</subfield><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Band</subfield><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">This article focuses on the engineering perspective on how engineers can design, review, and implement interim design and tactical urbanism projects. It presents an overview of engineering considerations, followed by three case studies where perceived barriers were successfully negotiated to provide a positive impact on communities. The first case study focuses on Interim Design as an example of how to maximize complete streets improvements when a project is limited in budget and scope. The second focuses on a 48-hour Tactical Urbanism installation, which created a four-block long, three-dimensional model of proposed improvements. The third focuses on a day-long temporary installation of a one-way cycletrack. Interim Design in this article is understood to include projects that use low-cost temporary materials and may be installed for several months or several years. Tactical Urbanism is understood to mean very temporary projects that last for no more than a few days, only use temporary materials, and typically can be set up by volunteers rather than contractors.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Urban planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Installations</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Design engineering</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Transportation planning</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Roads & highways</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Ryan McClain</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="0" ind2=" "><subfield code="a">Dan Hennessey</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">ITE journal</subfield><subfield code="d">Arlington, Va. : ITE, 1978</subfield><subfield code="g">85(2015), 4, Seite 18</subfield><subfield code="w">(DE-627)129456624</subfield><subfield code="w">(DE-600)199650-2</subfield><subfield code="w">(DE-576)014819929</subfield><subfield code="x">0148-0170</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:85</subfield><subfield code="g">year:2015</subfield><subfield code="g">number:4</subfield><subfield code="g">pages:18</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">http://search.proquest.com/docview/1717292096</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_OLC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-TEC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2016</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">85</subfield><subfield code="j">2015</subfield><subfield code="e">4</subfield><subfield code="h">18</subfield></datafield></record></collection>
|
score |
7.40125 |