1-5 Skagit River bridge collapse review
On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft)...
Ausführliche Beschreibung
Autor*in: |
Stark, Timothy D [verfasserIn] |
---|
Format: |
Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2016 |
---|
Rechteinformationen: |
Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
Enthalten in: Journal of performance of constructed facilities - Reston, Va. : Soc., 1987, 30(2016), 6 |
---|---|
Übergeordnetes Werk: |
volume:30 ; year:2016 ; number:6 |
Links: |
---|
DOI / URN: |
10.1061/(ASCE)CF.19435509.0000913 |
---|
Katalog-ID: |
OLC1988942179 |
---|
LEADER | 01000caa a2200265 4500 | ||
---|---|---|---|
001 | OLC1988942179 | ||
003 | DE-627 | ||
005 | 20230715023600.0 | ||
007 | tu | ||
008 | 170207s2016 xx ||||| 00| ||eng c | ||
024 | 7 | |a 10.1061/(ASCE)CF.19435509.0000913 |2 doi | |
028 | 5 | 2 | |a PQ20170301 |
035 | |a (DE-627)OLC1988942179 | ||
035 | |a (DE-599)GBVOLC1988942179 | ||
035 | |a (PRQ)gale_infotrac_4736920390 | ||
035 | |a (KEY)015994452016000003000060000015skagitriverbridgecollapsereview | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
082 | 0 | 4 | |a 690 |q DE-600 |
100 | 1 | |a Stark, Timothy D |e verfasserin |4 aut | |
245 | 1 | 0 | |a 1-5 Skagit River bridge collapse review |
264 | 1 | |c 2016 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a ohne Hilfsmittel zu benutzen |b n |2 rdamedia | ||
338 | |a Band |b nc |2 rdacarrier | ||
520 | |a On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. | ||
540 | |a Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers | ||
650 | 4 | |a Dynamic testing | |
650 | 4 | |a Bridge failures | |
650 | 4 | |a Washington | |
650 | 4 | |a Materials | |
650 | 4 | |a Methods | |
650 | 4 | |a Research | |
650 | 4 | |a Engineering research | |
700 | 1 | |a Benekohal, Rahim |4 oth | |
700 | 1 | |a Fahnestock, Larry A |4 oth | |
700 | 1 | |a LaFave, James M |4 oth | |
700 | 1 | |a He, Jiajun |4 oth | |
700 | 1 | |a Wittenkeller, Cody |4 oth | |
773 | 0 | 8 | |i Enthalten in |t Journal of performance of constructed facilities |d Reston, Va. : Soc., 1987 |g 30(2016), 6 |w (DE-627)13041235X |w (DE-600)622955-4 |w (DE-576)015915379 |x 0887-3828 |7 nnns |
773 | 1 | 8 | |g volume:30 |g year:2016 |g number:6 |
856 | 4 | 1 | |u http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 |3 Volltext |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_OLC | ||
912 | |a SSG-OLC-UMW | ||
912 | |a SSG-OLC-ARC | ||
912 | |a SSG-OLC-TEC | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_2006 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 30 |j 2016 |e 6 |
author_variant |
t d s td tds |
---|---|
matchkey_str |
article:08873828:2016----::5kgtiebigcla |
hierarchy_sort_str |
2016 |
publishDate |
2016 |
allfields |
10.1061/(ASCE)CF.19435509.0000913 doi PQ20170301 (DE-627)OLC1988942179 (DE-599)GBVOLC1988942179 (PRQ)gale_infotrac_4736920390 (KEY)015994452016000003000060000015skagitriverbridgecollapsereview DE-627 ger DE-627 rakwb eng 690 DE-600 Stark, Timothy D verfasserin aut 1-5 Skagit River bridge collapse review 2016 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers Dynamic testing Bridge failures Washington Materials Methods Research Engineering research Benekohal, Rahim oth Fahnestock, Larry A oth LaFave, James M oth He, Jiajun oth Wittenkeller, Cody oth Enthalten in Journal of performance of constructed facilities Reston, Va. : Soc., 1987 30(2016), 6 (DE-627)13041235X (DE-600)622955-4 (DE-576)015915379 0887-3828 nnns volume:30 year:2016 number:6 http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 Volltext GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-UMW SSG-OLC-ARC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_4700 AR 30 2016 6 |
spelling |
10.1061/(ASCE)CF.19435509.0000913 doi PQ20170301 (DE-627)OLC1988942179 (DE-599)GBVOLC1988942179 (PRQ)gale_infotrac_4736920390 (KEY)015994452016000003000060000015skagitriverbridgecollapsereview DE-627 ger DE-627 rakwb eng 690 DE-600 Stark, Timothy D verfasserin aut 1-5 Skagit River bridge collapse review 2016 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers Dynamic testing Bridge failures Washington Materials Methods Research Engineering research Benekohal, Rahim oth Fahnestock, Larry A oth LaFave, James M oth He, Jiajun oth Wittenkeller, Cody oth Enthalten in Journal of performance of constructed facilities Reston, Va. : Soc., 1987 30(2016), 6 (DE-627)13041235X (DE-600)622955-4 (DE-576)015915379 0887-3828 nnns volume:30 year:2016 number:6 http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 Volltext GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-UMW SSG-OLC-ARC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_4700 AR 30 2016 6 |
allfields_unstemmed |
10.1061/(ASCE)CF.19435509.0000913 doi PQ20170301 (DE-627)OLC1988942179 (DE-599)GBVOLC1988942179 (PRQ)gale_infotrac_4736920390 (KEY)015994452016000003000060000015skagitriverbridgecollapsereview DE-627 ger DE-627 rakwb eng 690 DE-600 Stark, Timothy D verfasserin aut 1-5 Skagit River bridge collapse review 2016 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers Dynamic testing Bridge failures Washington Materials Methods Research Engineering research Benekohal, Rahim oth Fahnestock, Larry A oth LaFave, James M oth He, Jiajun oth Wittenkeller, Cody oth Enthalten in Journal of performance of constructed facilities Reston, Va. : Soc., 1987 30(2016), 6 (DE-627)13041235X (DE-600)622955-4 (DE-576)015915379 0887-3828 nnns volume:30 year:2016 number:6 http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 Volltext GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-UMW SSG-OLC-ARC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_4700 AR 30 2016 6 |
allfieldsGer |
10.1061/(ASCE)CF.19435509.0000913 doi PQ20170301 (DE-627)OLC1988942179 (DE-599)GBVOLC1988942179 (PRQ)gale_infotrac_4736920390 (KEY)015994452016000003000060000015skagitriverbridgecollapsereview DE-627 ger DE-627 rakwb eng 690 DE-600 Stark, Timothy D verfasserin aut 1-5 Skagit River bridge collapse review 2016 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers Dynamic testing Bridge failures Washington Materials Methods Research Engineering research Benekohal, Rahim oth Fahnestock, Larry A oth LaFave, James M oth He, Jiajun oth Wittenkeller, Cody oth Enthalten in Journal of performance of constructed facilities Reston, Va. : Soc., 1987 30(2016), 6 (DE-627)13041235X (DE-600)622955-4 (DE-576)015915379 0887-3828 nnns volume:30 year:2016 number:6 http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 Volltext GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-UMW SSG-OLC-ARC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_4700 AR 30 2016 6 |
allfieldsSound |
10.1061/(ASCE)CF.19435509.0000913 doi PQ20170301 (DE-627)OLC1988942179 (DE-599)GBVOLC1988942179 (PRQ)gale_infotrac_4736920390 (KEY)015994452016000003000060000015skagitriverbridgecollapsereview DE-627 ger DE-627 rakwb eng 690 DE-600 Stark, Timothy D verfasserin aut 1-5 Skagit River bridge collapse review 2016 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers Dynamic testing Bridge failures Washington Materials Methods Research Engineering research Benekohal, Rahim oth Fahnestock, Larry A oth LaFave, James M oth He, Jiajun oth Wittenkeller, Cody oth Enthalten in Journal of performance of constructed facilities Reston, Va. : Soc., 1987 30(2016), 6 (DE-627)13041235X (DE-600)622955-4 (DE-576)015915379 0887-3828 nnns volume:30 year:2016 number:6 http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 Volltext GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-UMW SSG-OLC-ARC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_4700 AR 30 2016 6 |
language |
English |
source |
Enthalten in Journal of performance of constructed facilities 30(2016), 6 volume:30 year:2016 number:6 |
sourceStr |
Enthalten in Journal of performance of constructed facilities 30(2016), 6 volume:30 year:2016 number:6 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Dynamic testing Bridge failures Washington Materials Methods Research Engineering research |
dewey-raw |
690 |
isfreeaccess_bool |
false |
container_title |
Journal of performance of constructed facilities |
authorswithroles_txt_mv |
Stark, Timothy D @@aut@@ Benekohal, Rahim @@oth@@ Fahnestock, Larry A @@oth@@ LaFave, James M @@oth@@ He, Jiajun @@oth@@ Wittenkeller, Cody @@oth@@ |
publishDateDaySort_date |
2016-01-01T00:00:00Z |
hierarchy_top_id |
13041235X |
dewey-sort |
3690 |
id |
OLC1988942179 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a2200265 4500</leader><controlfield tag="001">OLC1988942179</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230715023600.0</controlfield><controlfield tag="007">tu</controlfield><controlfield tag="008">170207s2016 xx ||||| 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1061/(ASCE)CF.19435509.0000913</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">PQ20170301</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)OLC1988942179</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVOLC1988942179</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(PRQ)gale_infotrac_4736920390</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(KEY)015994452016000003000060000015skagitriverbridgecollapsereview</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">690</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Stark, Timothy D</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">1-5 Skagit River bridge collapse review</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2016</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">ohne Hilfsmittel zu benutzen</subfield><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Band</subfield><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913.</subfield></datafield><datafield tag="540" ind1=" " ind2=" "><subfield code="a">Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Dynamic testing</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Bridge failures</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Washington</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Materials</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Methods</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Research</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering research</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Benekohal, Rahim</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Fahnestock, Larry A</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">LaFave, James M</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">He, Jiajun</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Wittenkeller, Cody</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Journal of performance of constructed facilities</subfield><subfield code="d">Reston, Va. : Soc., 1987</subfield><subfield code="g">30(2016), 6</subfield><subfield code="w">(DE-627)13041235X</subfield><subfield code="w">(DE-600)622955-4</subfield><subfield code="w">(DE-576)015915379</subfield><subfield code="x">0887-3828</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:30</subfield><subfield code="g">year:2016</subfield><subfield code="g">number:6</subfield></datafield><datafield tag="856" ind1="4" ind2="1"><subfield code="u">http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_OLC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-UMW</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-ARC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-TEC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">30</subfield><subfield code="j">2016</subfield><subfield code="e">6</subfield></datafield></record></collection>
|
author |
Stark, Timothy D |
spellingShingle |
Stark, Timothy D ddc 690 misc Dynamic testing misc Bridge failures misc Washington misc Materials misc Methods misc Research misc Engineering research 1-5 Skagit River bridge collapse review |
authorStr |
Stark, Timothy D |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)13041235X |
format |
Article |
dewey-ones |
690 - Buildings |
delete_txt_mv |
keep |
author_role |
aut |
collection |
OLC |
remote_str |
false |
illustrated |
Not Illustrated |
issn |
0887-3828 |
topic_title |
690 DE-600 1-5 Skagit River bridge collapse review Dynamic testing Bridge failures Washington Materials Methods Research Engineering research |
topic |
ddc 690 misc Dynamic testing misc Bridge failures misc Washington misc Materials misc Methods misc Research misc Engineering research |
topic_unstemmed |
ddc 690 misc Dynamic testing misc Bridge failures misc Washington misc Materials misc Methods misc Research misc Engineering research |
topic_browse |
ddc 690 misc Dynamic testing misc Bridge failures misc Washington misc Materials misc Methods misc Research misc Engineering research |
format_facet |
Aufsätze Gedruckte Aufsätze |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
nc |
author2_variant |
r b rb l a f la laf j m l jm jml j h jh c w cw |
hierarchy_parent_title |
Journal of performance of constructed facilities |
hierarchy_parent_id |
13041235X |
dewey-tens |
690 - Building & construction |
hierarchy_top_title |
Journal of performance of constructed facilities |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)13041235X (DE-600)622955-4 (DE-576)015915379 |
title |
1-5 Skagit River bridge collapse review |
ctrlnum |
(DE-627)OLC1988942179 (DE-599)GBVOLC1988942179 (PRQ)gale_infotrac_4736920390 (KEY)015994452016000003000060000015skagitriverbridgecollapsereview |
title_full |
1-5 Skagit River bridge collapse review |
author_sort |
Stark, Timothy D |
journal |
Journal of performance of constructed facilities |
journalStr |
Journal of performance of constructed facilities |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
600 - Technology |
recordtype |
marc |
publishDateSort |
2016 |
contenttype_str_mv |
txt |
author_browse |
Stark, Timothy D |
container_volume |
30 |
class |
690 DE-600 |
format_se |
Aufsätze |
author-letter |
Stark, Timothy D |
doi_str_mv |
10.1061/(ASCE)CF.19435509.0000913 |
dewey-full |
690 |
title_sort |
1-5 skagit river bridge collapse review |
title_auth |
1-5 Skagit River bridge collapse review |
abstract |
On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. |
abstractGer |
On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. |
abstract_unstemmed |
On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-UMW SSG-OLC-ARC SSG-OLC-TEC GBV_ILN_70 GBV_ILN_2006 GBV_ILN_4700 |
container_issue |
6 |
title_short |
1-5 Skagit River bridge collapse review |
url |
http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913 |
remote_bool |
false |
author2 |
Benekohal, Rahim Fahnestock, Larry A LaFave, James M He, Jiajun Wittenkeller, Cody |
author2Str |
Benekohal, Rahim Fahnestock, Larry A LaFave, James M He, Jiajun Wittenkeller, Cody |
ppnlink |
13041235X |
mediatype_str_mv |
n |
isOA_txt |
false |
hochschulschrift_bool |
false |
author2_role |
oth oth oth oth oth |
doi_str |
10.1061/(ASCE)CF.19435509.0000913 |
up_date |
2024-07-03T19:47:52.141Z |
_version_ |
1803588544382369792 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a2200265 4500</leader><controlfield tag="001">OLC1988942179</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230715023600.0</controlfield><controlfield tag="007">tu</controlfield><controlfield tag="008">170207s2016 xx ||||| 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1061/(ASCE)CF.19435509.0000913</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">PQ20170301</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)OLC1988942179</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVOLC1988942179</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(PRQ)gale_infotrac_4736920390</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(KEY)015994452016000003000060000015skagitriverbridgecollapsereview</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">690</subfield><subfield code="q">DE-600</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Stark, Timothy D</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">1-5 Skagit River bridge collapse review</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2016</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">ohne Hilfsmittel zu benutzen</subfield><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Band</subfield><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">On May 23, 2013, a truck-tractor with a flatbed semitrailer hauling an oversized container was traveling south on Interstate 5 (1-5) near Mount Vernon, Washington. While crossing the Skagit River, the oversized container struck portions of the through- truss bridge, which resulted in a 49-m (160-ft) simple-span section of the 339-m (1,112-ft) bridge collapsing into the river. This collapse occurred even though the oversized container had a permit authorizing the travel route and was being escorted by a pilot vehicle. This paper (1) identifies some key transportation issues related to this scenario, e.g., permitting, route databases, signage, buffer between posted and actual clearance, insurance coverage, and pilot car requirements/operation; and (2) presents a structural analysis of the impact that provides insight into the truss design, damage sequence, failure mode, and potential techniques to increase the robustness of this class of bridge. DOI: 10.1061/(ASCE)CF.19435509.0000913.</subfield></datafield><datafield tag="540" ind1=" " ind2=" "><subfield code="a">Nutzungsrecht: © COPYRIGHT 2016 American Society of Civil Engineers</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Dynamic testing</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Bridge failures</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Washington</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Materials</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Methods</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Research</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Engineering research</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Benekohal, Rahim</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Fahnestock, Larry A</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">LaFave, James M</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">He, Jiajun</subfield><subfield code="4">oth</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Wittenkeller, Cody</subfield><subfield code="4">oth</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Journal of performance of constructed facilities</subfield><subfield code="d">Reston, Va. : Soc., 1987</subfield><subfield code="g">30(2016), 6</subfield><subfield code="w">(DE-627)13041235X</subfield><subfield code="w">(DE-600)622955-4</subfield><subfield code="w">(DE-576)015915379</subfield><subfield code="x">0887-3828</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:30</subfield><subfield code="g">year:2016</subfield><subfield code="g">number:6</subfield></datafield><datafield tag="856" ind1="4" ind2="1"><subfield code="u">http://dx.doi.org/10.1061/(ASCE)CF.19435509.0000913</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_OLC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-UMW</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-ARC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-TEC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">30</subfield><subfield code="j">2016</subfield><subfield code="e">6</subfield></datafield></record></collection>
|
score |
7.4007006 |