Fermilab proton accelerator complex status and improvement plans
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV...
Ausführliche Beschreibung
Autor*in: |
Shiltsev, Vladimir [verfasserIn] |
---|
Format: |
Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2017 |
---|
Rechteinformationen: |
Nutzungsrecht: © 2016, World Scientific Publishing Company |
---|
Schlagwörter: |
---|
Übergeordnetes Werk: |
Enthalten in: Modern physics letters / A - Singapur : World Scientific Publ., 1986, 32(2017), 16 |
---|---|
Übergeordnetes Werk: |
volume:32 ; year:2017 ; number:16 |
Links: |
---|
DOI / URN: |
10.1142/S0217732317300129 |
---|
Katalog-ID: |
OLC1995024503 |
---|
LEADER | 01000caa a2200265 4500 | ||
---|---|---|---|
001 | OLC1995024503 | ||
003 | DE-627 | ||
005 | 20230715060110.0 | ||
007 | tu | ||
008 | 170721s2017 xx ||||| 00| ||eng c | ||
024 | 7 | |a 10.1142/S0217732317300129 |2 doi | |
028 | 5 | 2 | |a PQ20170901 |
035 | |a (DE-627)OLC1995024503 | ||
035 | |a (DE-599)GBVOLC1995024503 | ||
035 | |a (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 | ||
035 | |a (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
082 | 0 | 4 | |a 530 |q DNB |
100 | 1 | |a Shiltsev, Vladimir |e verfasserin |4 aut | |
245 | 1 | 0 | |a Fermilab proton accelerator complex status and improvement plans |
264 | 1 | |c 2017 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a ohne Hilfsmittel zu benutzen |b n |2 rdamedia | ||
338 | |a Band |b nc |2 rdacarrier | ||
520 | |a Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. | ||
540 | |a Nutzungsrecht: © 2016, World Scientific Publishing Company | ||
650 | 4 | |a Physics | |
650 | 4 | |a Accelerator Physics | |
773 | 0 | 8 | |i Enthalten in |t Modern physics letters / A |d Singapur : World Scientific Publ., 1986 |g 32(2017), 16 |w (DE-627)130412236 |w (DE-600)622919-0 |w (DE-576)015915247 |x 0217-7323 |7 nnns |
773 | 1 | 8 | |g volume:32 |g year:2017 |g number:16 |
856 | 4 | 1 | |u http://dx.doi.org/10.1142/S0217732317300129 |3 Volltext |
856 | 4 | 2 | |u http://arxiv.org/abs/1705.03075 |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_OLC | ||
912 | |a SSG-OLC-PHY | ||
912 | |a SSG-OPC-AST | ||
912 | |a GBV_ILN_70 | ||
951 | |a AR | ||
952 | |d 32 |j 2017 |e 16 |
author_variant |
v s vs |
---|---|
matchkey_str |
article:02177323:2017----::emlbrtnceeaocmlxttsni |
hierarchy_sort_str |
2017 |
publishDate |
2017 |
allfields |
10.1142/S0217732317300129 doi PQ20170901 (DE-627)OLC1995024503 (DE-599)GBVOLC1995024503 (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme DE-627 ger DE-627 rakwb eng 530 DNB Shiltsev, Vladimir verfasserin aut Fermilab proton accelerator complex status and improvement plans 2017 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. Nutzungsrecht: © 2016, World Scientific Publishing Company Physics Accelerator Physics Enthalten in Modern physics letters / A Singapur : World Scientific Publ., 1986 32(2017), 16 (DE-627)130412236 (DE-600)622919-0 (DE-576)015915247 0217-7323 nnns volume:32 year:2017 number:16 http://dx.doi.org/10.1142/S0217732317300129 Volltext http://arxiv.org/abs/1705.03075 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-PHY SSG-OPC-AST GBV_ILN_70 AR 32 2017 16 |
spelling |
10.1142/S0217732317300129 doi PQ20170901 (DE-627)OLC1995024503 (DE-599)GBVOLC1995024503 (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme DE-627 ger DE-627 rakwb eng 530 DNB Shiltsev, Vladimir verfasserin aut Fermilab proton accelerator complex status and improvement plans 2017 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. Nutzungsrecht: © 2016, World Scientific Publishing Company Physics Accelerator Physics Enthalten in Modern physics letters / A Singapur : World Scientific Publ., 1986 32(2017), 16 (DE-627)130412236 (DE-600)622919-0 (DE-576)015915247 0217-7323 nnns volume:32 year:2017 number:16 http://dx.doi.org/10.1142/S0217732317300129 Volltext http://arxiv.org/abs/1705.03075 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-PHY SSG-OPC-AST GBV_ILN_70 AR 32 2017 16 |
allfields_unstemmed |
10.1142/S0217732317300129 doi PQ20170901 (DE-627)OLC1995024503 (DE-599)GBVOLC1995024503 (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme DE-627 ger DE-627 rakwb eng 530 DNB Shiltsev, Vladimir verfasserin aut Fermilab proton accelerator complex status and improvement plans 2017 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. Nutzungsrecht: © 2016, World Scientific Publishing Company Physics Accelerator Physics Enthalten in Modern physics letters / A Singapur : World Scientific Publ., 1986 32(2017), 16 (DE-627)130412236 (DE-600)622919-0 (DE-576)015915247 0217-7323 nnns volume:32 year:2017 number:16 http://dx.doi.org/10.1142/S0217732317300129 Volltext http://arxiv.org/abs/1705.03075 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-PHY SSG-OPC-AST GBV_ILN_70 AR 32 2017 16 |
allfieldsGer |
10.1142/S0217732317300129 doi PQ20170901 (DE-627)OLC1995024503 (DE-599)GBVOLC1995024503 (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme DE-627 ger DE-627 rakwb eng 530 DNB Shiltsev, Vladimir verfasserin aut Fermilab proton accelerator complex status and improvement plans 2017 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. Nutzungsrecht: © 2016, World Scientific Publishing Company Physics Accelerator Physics Enthalten in Modern physics letters / A Singapur : World Scientific Publ., 1986 32(2017), 16 (DE-627)130412236 (DE-600)622919-0 (DE-576)015915247 0217-7323 nnns volume:32 year:2017 number:16 http://dx.doi.org/10.1142/S0217732317300129 Volltext http://arxiv.org/abs/1705.03075 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-PHY SSG-OPC-AST GBV_ILN_70 AR 32 2017 16 |
allfieldsSound |
10.1142/S0217732317300129 doi PQ20170901 (DE-627)OLC1995024503 (DE-599)GBVOLC1995024503 (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme DE-627 ger DE-627 rakwb eng 530 DNB Shiltsev, Vladimir verfasserin aut Fermilab proton accelerator complex status and improvement plans 2017 Text txt rdacontent ohne Hilfsmittel zu benutzen n rdamedia Band nc rdacarrier Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. Nutzungsrecht: © 2016, World Scientific Publishing Company Physics Accelerator Physics Enthalten in Modern physics letters / A Singapur : World Scientific Publ., 1986 32(2017), 16 (DE-627)130412236 (DE-600)622919-0 (DE-576)015915247 0217-7323 nnns volume:32 year:2017 number:16 http://dx.doi.org/10.1142/S0217732317300129 Volltext http://arxiv.org/abs/1705.03075 GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-PHY SSG-OPC-AST GBV_ILN_70 AR 32 2017 16 |
language |
English |
source |
Enthalten in Modern physics letters / A 32(2017), 16 volume:32 year:2017 number:16 |
sourceStr |
Enthalten in Modern physics letters / A 32(2017), 16 volume:32 year:2017 number:16 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Physics Accelerator Physics |
dewey-raw |
530 |
isfreeaccess_bool |
false |
container_title |
Modern physics letters / A |
authorswithroles_txt_mv |
Shiltsev, Vladimir @@aut@@ |
publishDateDaySort_date |
2017-01-01T00:00:00Z |
hierarchy_top_id |
130412236 |
dewey-sort |
3530 |
id |
OLC1995024503 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a2200265 4500</leader><controlfield tag="001">OLC1995024503</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230715060110.0</controlfield><controlfield tag="007">tu</controlfield><controlfield tag="008">170721s2017 xx ||||| 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1142/S0217732317300129</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">PQ20170901</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)OLC1995024503</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVOLC1995024503</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">530</subfield><subfield code="q">DNB</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Shiltsev, Vladimir</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Fermilab proton accelerator complex status and improvement plans</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2017</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">ohne Hilfsmittel zu benutzen</subfield><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Band</subfield><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades.</subfield></datafield><datafield tag="540" ind1=" " ind2=" "><subfield code="a">Nutzungsrecht: © 2016, World Scientific Publishing Company</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Physics</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Accelerator Physics</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Modern physics letters / A</subfield><subfield code="d">Singapur : World Scientific Publ., 1986</subfield><subfield code="g">32(2017), 16</subfield><subfield code="w">(DE-627)130412236</subfield><subfield code="w">(DE-600)622919-0</subfield><subfield code="w">(DE-576)015915247</subfield><subfield code="x">0217-7323</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:32</subfield><subfield code="g">year:2017</subfield><subfield code="g">number:16</subfield></datafield><datafield tag="856" ind1="4" ind2="1"><subfield code="u">http://dx.doi.org/10.1142/S0217732317300129</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">http://arxiv.org/abs/1705.03075</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_OLC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHY</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OPC-AST</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">32</subfield><subfield code="j">2017</subfield><subfield code="e">16</subfield></datafield></record></collection>
|
author |
Shiltsev, Vladimir |
spellingShingle |
Shiltsev, Vladimir ddc 530 misc Physics misc Accelerator Physics Fermilab proton accelerator complex status and improvement plans |
authorStr |
Shiltsev, Vladimir |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)130412236 |
format |
Article |
dewey-ones |
530 - Physics |
delete_txt_mv |
keep |
author_role |
aut |
collection |
OLC |
remote_str |
false |
illustrated |
Not Illustrated |
issn |
0217-7323 |
topic_title |
530 DNB Fermilab proton accelerator complex status and improvement plans Physics Accelerator Physics |
topic |
ddc 530 misc Physics misc Accelerator Physics |
topic_unstemmed |
ddc 530 misc Physics misc Accelerator Physics |
topic_browse |
ddc 530 misc Physics misc Accelerator Physics |
format_facet |
Aufsätze Gedruckte Aufsätze |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
nc |
hierarchy_parent_title |
Modern physics letters / A |
hierarchy_parent_id |
130412236 |
dewey-tens |
530 - Physics |
hierarchy_top_title |
Modern physics letters / A |
isfreeaccess_txt |
false |
familylinks_str_mv |
(DE-627)130412236 (DE-600)622919-0 (DE-576)015915247 |
title |
Fermilab proton accelerator complex status and improvement plans |
ctrlnum |
(DE-627)OLC1995024503 (DE-599)GBVOLC1995024503 (PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0 (KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme |
title_full |
Fermilab proton accelerator complex status and improvement plans |
author_sort |
Shiltsev, Vladimir |
journal |
Modern physics letters / A |
journalStr |
Modern physics letters / A |
lang_code |
eng |
isOA_bool |
false |
dewey-hundreds |
500 - Science |
recordtype |
marc |
publishDateSort |
2017 |
contenttype_str_mv |
txt |
author_browse |
Shiltsev, Vladimir |
container_volume |
32 |
class |
530 DNB |
format_se |
Aufsätze |
author-letter |
Shiltsev, Vladimir |
doi_str_mv |
10.1142/S0217732317300129 |
dewey-full |
530 |
title_sort |
fermilab proton accelerator complex status and improvement plans |
title_auth |
Fermilab proton accelerator complex status and improvement plans |
abstract |
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. |
abstractGer |
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. |
abstract_unstemmed |
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades. |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_OLC SSG-OLC-PHY SSG-OPC-AST GBV_ILN_70 |
container_issue |
16 |
title_short |
Fermilab proton accelerator complex status and improvement plans |
url |
http://dx.doi.org/10.1142/S0217732317300129 http://arxiv.org/abs/1705.03075 |
remote_bool |
false |
ppnlink |
130412236 |
mediatype_str_mv |
n |
isOA_txt |
false |
hochschulschrift_bool |
false |
doi_str |
10.1142/S0217732317300129 |
up_date |
2024-07-03T20:10:34.123Z |
_version_ |
1803589972524007424 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a2200265 4500</leader><controlfield tag="001">OLC1995024503</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230715060110.0</controlfield><controlfield tag="007">tu</controlfield><controlfield tag="008">170721s2017 xx ||||| 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1142/S0217732317300129</subfield><subfield code="2">doi</subfield></datafield><datafield tag="028" ind1="5" ind2="2"><subfield code="a">PQ20170901</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)OLC1995024503</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-599)GBVOLC1995024503</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(PRQ)a1159-9fdd6c72d2a2919105f6e267d7b5170c20c8a47ced878d80d19078ffea31dcfe0</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(KEY)0155444120170000032001600000fermilabprotonacceleratorcomplexstatusandimproveme</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="082" ind1="0" ind2="4"><subfield code="a">530</subfield><subfield code="q">DNB</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Shiltsev, Vladimir</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Fermilab proton accelerator complex status and improvement plans</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2017</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">ohne Hilfsmittel zu benutzen</subfield><subfield code="b">n</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Band</subfield><subfield code="b">nc</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments. Routine operation with a world-record 700 kW of average 120 GeV beam power on the neutrino target was achieved in 2017 as a result of the Proton Improvement Plan (PIP) upgrade. There are plans to further increase the power from 900–1000 kW. The next major upgrade of the FNAL accelerator complex, called PIP-II, is under development. It aims at 1.2 MW beam power on target at the start of the LBNF/DUNE experiment in the middle of the next decade and assumes replacement of the existing 40 years old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF linear accelerator. There are several concepts to further double the beam power to > 2.4 MW after replacement of the existing 8 GeV Booster synchrotron. In this review, we discuss current performance of the Fermilab proton accelerator complex, the upgrade plans for the next two decades and the accelerator R&D program to address cost and performance risks for these upgrades.</subfield></datafield><datafield tag="540" ind1=" " ind2=" "><subfield code="a">Nutzungsrecht: © 2016, World Scientific Publishing Company</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Physics</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Accelerator Physics</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Modern physics letters / A</subfield><subfield code="d">Singapur : World Scientific Publ., 1986</subfield><subfield code="g">32(2017), 16</subfield><subfield code="w">(DE-627)130412236</subfield><subfield code="w">(DE-600)622919-0</subfield><subfield code="w">(DE-576)015915247</subfield><subfield code="x">0217-7323</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:32</subfield><subfield code="g">year:2017</subfield><subfield code="g">number:16</subfield></datafield><datafield tag="856" ind1="4" ind2="1"><subfield code="u">http://dx.doi.org/10.1142/S0217732317300129</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="856" ind1="4" ind2="2"><subfield code="u">http://arxiv.org/abs/1705.03075</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_OLC</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHY</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OPC-AST</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">32</subfield><subfield code="j">2017</subfield><subfield code="e">16</subfield></datafield></record></collection>
|
score |
7.4007645 |