Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study
Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was des...
Ausführliche Beschreibung
Autor*in: |
Ament, Stephanie MC [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2014 |
---|
Schlagwörter: |
Enhanced recovery after surgery programme |
---|
Anmerkung: |
© Ament et al.; licensee BioMed Central Ltd. 2014 |
---|
Übergeordnetes Werk: |
Enthalten in: BMC health services research - London : BioMed Central, 2001, 14(2014), 1 vom: 16. Dez. |
---|---|
Übergeordnetes Werk: |
volume:14 ; year:2014 ; number:1 ; day:16 ; month:12 |
Links: |
---|
DOI / URN: |
10.1186/s12913-014-0641-y |
---|
Katalog-ID: |
SPR028268660 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | SPR028268660 | ||
003 | DE-627 | ||
005 | 20230520003117.0 | ||
007 | cr uuu---uuuuu | ||
008 | 201007s2014 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1186/s12913-014-0641-y |2 doi | |
035 | |a (DE-627)SPR028268660 | ||
035 | |a (SPR)s12913-014-0641-y-e | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
100 | 1 | |a Ament, Stephanie MC |e verfasserin |4 aut | |
245 | 1 | 0 | |a Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
264 | 1 | |c 2014 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
500 | |a © Ament et al.; licensee BioMed Central Ltd. 2014 | ||
520 | |a Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. | ||
650 | 4 | |a Sustainability |7 (dpeaa)DE-He213 | |
650 | 4 | |a Enhanced recovery after surgery programme |7 (dpeaa)DE-He213 | |
650 | 4 | |a Quality improvement collaborative |7 (dpeaa)DE-He213 | |
650 | 4 | |a Strategies |7 (dpeaa)DE-He213 | |
700 | 1 | |a Gillissen, Freek |4 aut | |
700 | 1 | |a Moser, Albine |4 aut | |
700 | 1 | |a Maessen, José MC |4 aut | |
700 | 1 | |a Dirksen, Carmen D |4 aut | |
700 | 1 | |a von Meyenfeldt, Maarten F |4 aut | |
700 | 1 | |a van der Weijden, Trudy |4 aut | |
773 | 0 | 8 | |i Enthalten in |t BMC health services research |d London : BioMed Central, 2001 |g 14(2014), 1 vom: 16. Dez. |w (DE-627)331018756 |w (DE-600)2050434-2 |x 1472-6963 |7 nnns |
773 | 1 | 8 | |g volume:14 |g year:2014 |g number:1 |g day:16 |g month:12 |
856 | 4 | 0 | |u https://dx.doi.org/10.1186/s12913-014-0641-y |z kostenfrei |3 Volltext |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_SPRINGER | ||
912 | |a SSG-OLC-PHA | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_74 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_170 | ||
912 | |a GBV_ILN_206 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_702 | ||
912 | |a GBV_ILN_2001 | ||
912 | |a GBV_ILN_2003 | ||
912 | |a GBV_ILN_2005 | ||
912 | |a GBV_ILN_2006 | ||
912 | |a GBV_ILN_2008 | ||
912 | |a GBV_ILN_2009 | ||
912 | |a GBV_ILN_2010 | ||
912 | |a GBV_ILN_2011 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2015 | ||
912 | |a GBV_ILN_2020 | ||
912 | |a GBV_ILN_2021 | ||
912 | |a GBV_ILN_2025 | ||
912 | |a GBV_ILN_2031 | ||
912 | |a GBV_ILN_2038 | ||
912 | |a GBV_ILN_2044 | ||
912 | |a GBV_ILN_2048 | ||
912 | |a GBV_ILN_2050 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_2056 | ||
912 | |a GBV_ILN_2057 | ||
912 | |a GBV_ILN_2061 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_2113 | ||
912 | |a GBV_ILN_2129 | ||
912 | |a GBV_ILN_2190 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4046 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 14 |j 2014 |e 1 |b 16 |c 12 |
author_variant |
s m a sm sma f g fg a m am j m m jm jmm c d d cd cdd m m f v mmf mmfv d w t v dwt dwtv |
---|---|
matchkey_str |
article:14726963:2014----::dniiainfrmsnsrtgetssanmrvmnsnoptlr |
hierarchy_sort_str |
2014 |
publishDate |
2014 |
allfields |
10.1186/s12913-014-0641-y doi (DE-627)SPR028268660 (SPR)s12913-014-0641-y-e DE-627 ger DE-627 rakwb eng Ament, Stephanie MC verfasserin aut Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © Ament et al.; licensee BioMed Central Ltd. 2014 Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. Sustainability (dpeaa)DE-He213 Enhanced recovery after surgery programme (dpeaa)DE-He213 Quality improvement collaborative (dpeaa)DE-He213 Strategies (dpeaa)DE-He213 Gillissen, Freek aut Moser, Albine aut Maessen, José MC aut Dirksen, Carmen D aut von Meyenfeldt, Maarten F aut van der Weijden, Trudy aut Enthalten in BMC health services research London : BioMed Central, 2001 14(2014), 1 vom: 16. Dez. (DE-627)331018756 (DE-600)2050434-2 1472-6963 nnns volume:14 year:2014 number:1 day:16 month:12 https://dx.doi.org/10.1186/s12913-014-0641-y kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2001 GBV_ILN_2003 GBV_ILN_2005 GBV_ILN_2006 GBV_ILN_2008 GBV_ILN_2009 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2031 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2050 GBV_ILN_2055 GBV_ILN_2056 GBV_ILN_2057 GBV_ILN_2061 GBV_ILN_2111 GBV_ILN_2113 GBV_ILN_2129 GBV_ILN_2190 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2014 1 16 12 |
spelling |
10.1186/s12913-014-0641-y doi (DE-627)SPR028268660 (SPR)s12913-014-0641-y-e DE-627 ger DE-627 rakwb eng Ament, Stephanie MC verfasserin aut Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © Ament et al.; licensee BioMed Central Ltd. 2014 Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. Sustainability (dpeaa)DE-He213 Enhanced recovery after surgery programme (dpeaa)DE-He213 Quality improvement collaborative (dpeaa)DE-He213 Strategies (dpeaa)DE-He213 Gillissen, Freek aut Moser, Albine aut Maessen, José MC aut Dirksen, Carmen D aut von Meyenfeldt, Maarten F aut van der Weijden, Trudy aut Enthalten in BMC health services research London : BioMed Central, 2001 14(2014), 1 vom: 16. Dez. (DE-627)331018756 (DE-600)2050434-2 1472-6963 nnns volume:14 year:2014 number:1 day:16 month:12 https://dx.doi.org/10.1186/s12913-014-0641-y kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2001 GBV_ILN_2003 GBV_ILN_2005 GBV_ILN_2006 GBV_ILN_2008 GBV_ILN_2009 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2031 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2050 GBV_ILN_2055 GBV_ILN_2056 GBV_ILN_2057 GBV_ILN_2061 GBV_ILN_2111 GBV_ILN_2113 GBV_ILN_2129 GBV_ILN_2190 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2014 1 16 12 |
allfields_unstemmed |
10.1186/s12913-014-0641-y doi (DE-627)SPR028268660 (SPR)s12913-014-0641-y-e DE-627 ger DE-627 rakwb eng Ament, Stephanie MC verfasserin aut Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © Ament et al.; licensee BioMed Central Ltd. 2014 Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. Sustainability (dpeaa)DE-He213 Enhanced recovery after surgery programme (dpeaa)DE-He213 Quality improvement collaborative (dpeaa)DE-He213 Strategies (dpeaa)DE-He213 Gillissen, Freek aut Moser, Albine aut Maessen, José MC aut Dirksen, Carmen D aut von Meyenfeldt, Maarten F aut van der Weijden, Trudy aut Enthalten in BMC health services research London : BioMed Central, 2001 14(2014), 1 vom: 16. Dez. (DE-627)331018756 (DE-600)2050434-2 1472-6963 nnns volume:14 year:2014 number:1 day:16 month:12 https://dx.doi.org/10.1186/s12913-014-0641-y kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2001 GBV_ILN_2003 GBV_ILN_2005 GBV_ILN_2006 GBV_ILN_2008 GBV_ILN_2009 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2031 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2050 GBV_ILN_2055 GBV_ILN_2056 GBV_ILN_2057 GBV_ILN_2061 GBV_ILN_2111 GBV_ILN_2113 GBV_ILN_2129 GBV_ILN_2190 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2014 1 16 12 |
allfieldsGer |
10.1186/s12913-014-0641-y doi (DE-627)SPR028268660 (SPR)s12913-014-0641-y-e DE-627 ger DE-627 rakwb eng Ament, Stephanie MC verfasserin aut Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © Ament et al.; licensee BioMed Central Ltd. 2014 Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. Sustainability (dpeaa)DE-He213 Enhanced recovery after surgery programme (dpeaa)DE-He213 Quality improvement collaborative (dpeaa)DE-He213 Strategies (dpeaa)DE-He213 Gillissen, Freek aut Moser, Albine aut Maessen, José MC aut Dirksen, Carmen D aut von Meyenfeldt, Maarten F aut van der Weijden, Trudy aut Enthalten in BMC health services research London : BioMed Central, 2001 14(2014), 1 vom: 16. Dez. (DE-627)331018756 (DE-600)2050434-2 1472-6963 nnns volume:14 year:2014 number:1 day:16 month:12 https://dx.doi.org/10.1186/s12913-014-0641-y kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2001 GBV_ILN_2003 GBV_ILN_2005 GBV_ILN_2006 GBV_ILN_2008 GBV_ILN_2009 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2031 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2050 GBV_ILN_2055 GBV_ILN_2056 GBV_ILN_2057 GBV_ILN_2061 GBV_ILN_2111 GBV_ILN_2113 GBV_ILN_2129 GBV_ILN_2190 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2014 1 16 12 |
allfieldsSound |
10.1186/s12913-014-0641-y doi (DE-627)SPR028268660 (SPR)s12913-014-0641-y-e DE-627 ger DE-627 rakwb eng Ament, Stephanie MC verfasserin aut Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study 2014 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © Ament et al.; licensee BioMed Central Ltd. 2014 Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. Sustainability (dpeaa)DE-He213 Enhanced recovery after surgery programme (dpeaa)DE-He213 Quality improvement collaborative (dpeaa)DE-He213 Strategies (dpeaa)DE-He213 Gillissen, Freek aut Moser, Albine aut Maessen, José MC aut Dirksen, Carmen D aut von Meyenfeldt, Maarten F aut van der Weijden, Trudy aut Enthalten in BMC health services research London : BioMed Central, 2001 14(2014), 1 vom: 16. Dez. (DE-627)331018756 (DE-600)2050434-2 1472-6963 nnns volume:14 year:2014 number:1 day:16 month:12 https://dx.doi.org/10.1186/s12913-014-0641-y kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2001 GBV_ILN_2003 GBV_ILN_2005 GBV_ILN_2006 GBV_ILN_2008 GBV_ILN_2009 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2031 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2050 GBV_ILN_2055 GBV_ILN_2056 GBV_ILN_2057 GBV_ILN_2061 GBV_ILN_2111 GBV_ILN_2113 GBV_ILN_2129 GBV_ILN_2190 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 14 2014 1 16 12 |
language |
English |
source |
Enthalten in BMC health services research 14(2014), 1 vom: 16. Dez. volume:14 year:2014 number:1 day:16 month:12 |
sourceStr |
Enthalten in BMC health services research 14(2014), 1 vom: 16. Dez. volume:14 year:2014 number:1 day:16 month:12 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Sustainability Enhanced recovery after surgery programme Quality improvement collaborative Strategies |
isfreeaccess_bool |
true |
container_title |
BMC health services research |
authorswithroles_txt_mv |
Ament, Stephanie MC @@aut@@ Gillissen, Freek @@aut@@ Moser, Albine @@aut@@ Maessen, José MC @@aut@@ Dirksen, Carmen D @@aut@@ von Meyenfeldt, Maarten F @@aut@@ van der Weijden, Trudy @@aut@@ |
publishDateDaySort_date |
2014-12-16T00:00:00Z |
hierarchy_top_id |
331018756 |
id |
SPR028268660 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">SPR028268660</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230520003117.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">201007s2014 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1186/s12913-014-0641-y</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)SPR028268660</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(SPR)s12913-014-0641-y-e</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Ament, Stephanie MC</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2014</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">© Ament et al.; licensee BioMed Central Ltd. 2014</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Sustainability</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Enhanced recovery after surgery programme</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Quality improvement collaborative</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Strategies</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Gillissen, Freek</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Moser, Albine</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Maessen, José MC</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Dirksen, Carmen D</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">von Meyenfeldt, Maarten F</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">van der Weijden, Trudy</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">BMC health services research</subfield><subfield code="d">London : BioMed Central, 2001</subfield><subfield code="g">14(2014), 1 vom: 16. Dez.</subfield><subfield code="w">(DE-627)331018756</subfield><subfield code="w">(DE-600)2050434-2</subfield><subfield code="x">1472-6963</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:14</subfield><subfield code="g">year:2014</subfield><subfield code="g">number:1</subfield><subfield code="g">day:16</subfield><subfield code="g">month:12</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://dx.doi.org/10.1186/s12913-014-0641-y</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_SPRINGER</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHA</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_74</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_702</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2001</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2003</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2008</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2010</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2015</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2020</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2021</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2025</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2031</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2038</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2044</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2048</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2050</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2056</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2057</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2061</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2113</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2129</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2190</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4046</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">14</subfield><subfield code="j">2014</subfield><subfield code="e">1</subfield><subfield code="b">16</subfield><subfield code="c">12</subfield></datafield></record></collection>
|
author |
Ament, Stephanie MC |
spellingShingle |
Ament, Stephanie MC misc Sustainability misc Enhanced recovery after surgery programme misc Quality improvement collaborative misc Strategies Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
authorStr |
Ament, Stephanie MC |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)331018756 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut aut aut aut aut aut aut |
collection |
springer |
remote_str |
true |
illustrated |
Not Illustrated |
issn |
1472-6963 |
topic_title |
Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study Sustainability (dpeaa)DE-He213 Enhanced recovery after surgery programme (dpeaa)DE-He213 Quality improvement collaborative (dpeaa)DE-He213 Strategies (dpeaa)DE-He213 |
topic |
misc Sustainability misc Enhanced recovery after surgery programme misc Quality improvement collaborative misc Strategies |
topic_unstemmed |
misc Sustainability misc Enhanced recovery after surgery programme misc Quality improvement collaborative misc Strategies |
topic_browse |
misc Sustainability misc Enhanced recovery after surgery programme misc Quality improvement collaborative misc Strategies |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
BMC health services research |
hierarchy_parent_id |
331018756 |
hierarchy_top_title |
BMC health services research |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)331018756 (DE-600)2050434-2 |
title |
Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
ctrlnum |
(DE-627)SPR028268660 (SPR)s12913-014-0641-y-e |
title_full |
Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
author_sort |
Ament, Stephanie MC |
journal |
BMC health services research |
journalStr |
BMC health services research |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2014 |
contenttype_str_mv |
txt |
author_browse |
Ament, Stephanie MC Gillissen, Freek Moser, Albine Maessen, José MC Dirksen, Carmen D von Meyenfeldt, Maarten F van der Weijden, Trudy |
container_volume |
14 |
format_se |
Elektronische Aufsätze |
author-letter |
Ament, Stephanie MC |
doi_str_mv |
10.1186/s12913-014-0641-y |
title_sort |
identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
title_auth |
Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
abstract |
Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. © Ament et al.; licensee BioMed Central Ltd. 2014 |
abstractGer |
Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. © Ament et al.; licensee BioMed Central Ltd. 2014 |
abstract_unstemmed |
Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative. © Ament et al.; licensee BioMed Central Ltd. 2014 |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER SSG-OLC-PHA GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_73 GBV_ILN_74 GBV_ILN_95 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_170 GBV_ILN_206 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_602 GBV_ILN_702 GBV_ILN_2001 GBV_ILN_2003 GBV_ILN_2005 GBV_ILN_2006 GBV_ILN_2008 GBV_ILN_2009 GBV_ILN_2010 GBV_ILN_2011 GBV_ILN_2014 GBV_ILN_2015 GBV_ILN_2020 GBV_ILN_2021 GBV_ILN_2025 GBV_ILN_2031 GBV_ILN_2038 GBV_ILN_2044 GBV_ILN_2048 GBV_ILN_2050 GBV_ILN_2055 GBV_ILN_2056 GBV_ILN_2057 GBV_ILN_2061 GBV_ILN_2111 GBV_ILN_2113 GBV_ILN_2129 GBV_ILN_2190 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
1 |
title_short |
Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study |
url |
https://dx.doi.org/10.1186/s12913-014-0641-y |
remote_bool |
true |
author2 |
Gillissen, Freek Moser, Albine Maessen, José MC Dirksen, Carmen D von Meyenfeldt, Maarten F van der Weijden, Trudy |
author2Str |
Gillissen, Freek Moser, Albine Maessen, José MC Dirksen, Carmen D von Meyenfeldt, Maarten F van der Weijden, Trudy |
ppnlink |
331018756 |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.1186/s12913-014-0641-y |
up_date |
2024-07-03T18:22:41.831Z |
_version_ |
1803583185842339840 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">SPR028268660</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230520003117.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">201007s2014 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1186/s12913-014-0641-y</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)SPR028268660</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(SPR)s12913-014-0641-y-e</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Ament, Stephanie MC</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Identification of promising strategies to sustain improvements in hospital practice: a qualitative case study</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2014</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">© Ament et al.; licensee BioMed Central Ltd. 2014</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Background A quality improvement collaborative is an intensive project involving a combination of implementation strategies applied in a limited “breakthrough” time window. After an implementation project, it is generally difficult to sustain its success. In the current study, sustainability was described as maintaining an implemented innovation and its benefits over a longer period of time after the implementation project has ended. The aim of the study was to explore potentially promising strategies for sustaining the Enhanced Recovery After Surgery (ERAS) programme in colonic surgery as perceived by professionals, three to six years after the hospital had successfully finished a quality improvement collaborative. Methods A qualitative case study was performed to identify promising strategies to sustain key outcome variables related to the ERAS programme in terms of adherence, time needed for functional recovery and hospital length of stay (LOS), as achieved immediately after implementation. Ten hospitals were selected which had successfully implemented the ERAS programme in colonic surgery (2006–2009), with success defined as a median LOS of 6 days or less and protocol adherence rates above 70%. Fourteen semi-structured interviews were held with eighteen key participants of the care process three to six years after implementation, starting with the project leader in every hospital. The interviews started by confronting them with the level of sustained implementation results. A direct content analysis with an inductive coding approach was used to identify promising strategies. The mean duration of the interviews was 37 minutes (min 26 minutes – max 51 minutes). Results The current study revealed strategies targeting professionals and the organisation. They comprised internal audit and feedback on outcomes, small-scale educational booster meetings, reminders, changing the physical structure of the organisation, changing the care process, making work agreements and delegating responsibility, and involving a coordinator. A multifaceted self-driven promising strategy was applied in most hospitals, and in most hospitals promising strategies were suggested to sustain the ERAS programme. Conclusions Joining a quality improvement collaborative may not be enough to achieve long-term normalisation of transformed care, and additional investments may be needed. The findings suggest that certain post-implementation strategies are valuable in sustaining implementation successes achieved after joining a quality improvement collaborative.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Sustainability</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Enhanced recovery after surgery programme</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Quality improvement collaborative</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Strategies</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Gillissen, Freek</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Moser, Albine</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Maessen, José MC</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">Dirksen, Carmen D</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">von Meyenfeldt, Maarten F</subfield><subfield code="4">aut</subfield></datafield><datafield tag="700" ind1="1" ind2=" "><subfield code="a">van der Weijden, Trudy</subfield><subfield code="4">aut</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">BMC health services research</subfield><subfield code="d">London : BioMed Central, 2001</subfield><subfield code="g">14(2014), 1 vom: 16. Dez.</subfield><subfield code="w">(DE-627)331018756</subfield><subfield code="w">(DE-600)2050434-2</subfield><subfield code="x">1472-6963</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:14</subfield><subfield code="g">year:2014</subfield><subfield code="g">number:1</subfield><subfield code="g">day:16</subfield><subfield code="g">month:12</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://dx.doi.org/10.1186/s12913-014-0641-y</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_SPRINGER</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SSG-OLC-PHA</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_74</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_170</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_206</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_702</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2001</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2003</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2005</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2006</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2008</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2010</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2011</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2015</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2020</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2021</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2025</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2031</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2038</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2044</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2048</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2050</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2056</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2057</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2061</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2113</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2129</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2190</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4046</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">14</subfield><subfield code="j">2014</subfield><subfield code="e">1</subfield><subfield code="b">16</subfield><subfield code="c">12</subfield></datafield></record></collection>
|
score |
7.398202 |