Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system
Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and ach...
Ausführliche Beschreibung
Autor*in: |
Haili, Chang [verfasserIn] |
---|
Format: |
E-Artikel |
---|---|
Sprache: |
Englisch |
Erschienen: |
2021 |
---|
Schlagwörter: |
---|
Anmerkung: |
© The Author(s) 2021 |
---|
Übergeordnetes Werk: |
Enthalten in: Urban rail transit - Berlin : Springer, 2015, 7(2021), 4 vom: Dez., Seite 301-333 |
---|---|
Übergeordnetes Werk: |
volume:7 ; year:2021 ; number:4 ; month:12 ; pages:301-333 |
Links: |
---|
DOI / URN: |
10.1007/s40864-021-00158-3 |
---|
Katalog-ID: |
SPR045830487 |
---|
LEADER | 01000caa a22002652 4500 | ||
---|---|---|---|
001 | SPR045830487 | ||
003 | DE-627 | ||
005 | 20230509100253.0 | ||
007 | cr uuu---uuuuu | ||
008 | 211222s2021 xx |||||o 00| ||eng c | ||
024 | 7 | |a 10.1007/s40864-021-00158-3 |2 doi | |
035 | |a (DE-627)SPR045830487 | ||
035 | |a (SPR)s40864-021-00158-3-e | ||
040 | |a DE-627 |b ger |c DE-627 |e rakwb | ||
041 | |a eng | ||
100 | 1 | |a Haili, Chang |e verfasserin |4 aut | |
245 | 1 | 0 | |a Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system |
264 | 1 | |c 2021 | |
336 | |a Text |b txt |2 rdacontent | ||
337 | |a Computermedien |b c |2 rdamedia | ||
338 | |a Online-Ressource |b cr |2 rdacarrier | ||
500 | |a © The Author(s) 2021 | ||
520 | |a Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. | ||
650 | 4 | |a Metro |7 (dpeaa)DE-He213 | |
650 | 4 | |a Energy-saving |7 (dpeaa)DE-He213 | |
650 | 4 | |a Weak current system |7 (dpeaa)DE-He213 | |
650 | 4 | |a Uninterruptible power supply (UPS) |7 (dpeaa)DE-He213 | |
650 | 4 | |a Energy consumption prediction |7 (dpeaa)DE-He213 | |
650 | 4 | |a Measuring instruments |7 (dpeaa)DE-He213 | |
650 | 4 | |a Energy consumption quota |7 (dpeaa)DE-He213 | |
773 | 0 | 8 | |i Enthalten in |t Urban rail transit |d Berlin : Springer, 2015 |g 7(2021), 4 vom: Dez., Seite 301-333 |w (DE-627)823091856 |w (DE-600)2818317-4 |x 2199-6679 |7 nnns |
773 | 1 | 8 | |g volume:7 |g year:2021 |g number:4 |g month:12 |g pages:301-333 |
856 | 4 | 0 | |u https://dx.doi.org/10.1007/s40864-021-00158-3 |z kostenfrei |3 Volltext |
912 | |a GBV_USEFLAG_A | ||
912 | |a SYSFLAG_A | ||
912 | |a GBV_SPRINGER | ||
912 | |a GBV_ILN_11 | ||
912 | |a GBV_ILN_20 | ||
912 | |a GBV_ILN_22 | ||
912 | |a GBV_ILN_23 | ||
912 | |a GBV_ILN_24 | ||
912 | |a GBV_ILN_31 | ||
912 | |a GBV_ILN_39 | ||
912 | |a GBV_ILN_40 | ||
912 | |a GBV_ILN_60 | ||
912 | |a GBV_ILN_62 | ||
912 | |a GBV_ILN_63 | ||
912 | |a GBV_ILN_65 | ||
912 | |a GBV_ILN_69 | ||
912 | |a GBV_ILN_70 | ||
912 | |a GBV_ILN_73 | ||
912 | |a GBV_ILN_95 | ||
912 | |a GBV_ILN_105 | ||
912 | |a GBV_ILN_110 | ||
912 | |a GBV_ILN_151 | ||
912 | |a GBV_ILN_161 | ||
912 | |a GBV_ILN_213 | ||
912 | |a GBV_ILN_230 | ||
912 | |a GBV_ILN_285 | ||
912 | |a GBV_ILN_293 | ||
912 | |a GBV_ILN_370 | ||
912 | |a GBV_ILN_602 | ||
912 | |a GBV_ILN_2009 | ||
912 | |a GBV_ILN_2014 | ||
912 | |a GBV_ILN_2027 | ||
912 | |a GBV_ILN_2055 | ||
912 | |a GBV_ILN_2111 | ||
912 | |a GBV_ILN_2129 | ||
912 | |a GBV_ILN_4012 | ||
912 | |a GBV_ILN_4037 | ||
912 | |a GBV_ILN_4046 | ||
912 | |a GBV_ILN_4112 | ||
912 | |a GBV_ILN_4125 | ||
912 | |a GBV_ILN_4126 | ||
912 | |a GBV_ILN_4249 | ||
912 | |a GBV_ILN_4305 | ||
912 | |a GBV_ILN_4306 | ||
912 | |a GBV_ILN_4307 | ||
912 | |a GBV_ILN_4313 | ||
912 | |a GBV_ILN_4322 | ||
912 | |a GBV_ILN_4323 | ||
912 | |a GBV_ILN_4324 | ||
912 | |a GBV_ILN_4325 | ||
912 | |a GBV_ILN_4335 | ||
912 | |a GBV_ILN_4338 | ||
912 | |a GBV_ILN_4367 | ||
912 | |a GBV_ILN_4700 | ||
951 | |a AR | ||
952 | |d 7 |j 2021 |e 4 |c 12 |h 301-333 |
author_variant |
c h ch |
---|---|
matchkey_str |
article:21996679:2021----::nryaigeinnipeettoimtoekurnssescssu |
hierarchy_sort_str |
2021 |
publishDate |
2021 |
allfields |
10.1007/s40864-021-00158-3 doi (DE-627)SPR045830487 (SPR)s40864-021-00158-3-e DE-627 ger DE-627 rakwb eng Haili, Chang verfasserin aut Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © The Author(s) 2021 Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. Metro (dpeaa)DE-He213 Energy-saving (dpeaa)DE-He213 Weak current system (dpeaa)DE-He213 Uninterruptible power supply (UPS) (dpeaa)DE-He213 Energy consumption prediction (dpeaa)DE-He213 Measuring instruments (dpeaa)DE-He213 Energy consumption quota (dpeaa)DE-He213 Enthalten in Urban rail transit Berlin : Springer, 2015 7(2021), 4 vom: Dez., Seite 301-333 (DE-627)823091856 (DE-600)2818317-4 2199-6679 nnns volume:7 year:2021 number:4 month:12 pages:301-333 https://dx.doi.org/10.1007/s40864-021-00158-3 kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2027 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_2129 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 7 2021 4 12 301-333 |
spelling |
10.1007/s40864-021-00158-3 doi (DE-627)SPR045830487 (SPR)s40864-021-00158-3-e DE-627 ger DE-627 rakwb eng Haili, Chang verfasserin aut Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © The Author(s) 2021 Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. Metro (dpeaa)DE-He213 Energy-saving (dpeaa)DE-He213 Weak current system (dpeaa)DE-He213 Uninterruptible power supply (UPS) (dpeaa)DE-He213 Energy consumption prediction (dpeaa)DE-He213 Measuring instruments (dpeaa)DE-He213 Energy consumption quota (dpeaa)DE-He213 Enthalten in Urban rail transit Berlin : Springer, 2015 7(2021), 4 vom: Dez., Seite 301-333 (DE-627)823091856 (DE-600)2818317-4 2199-6679 nnns volume:7 year:2021 number:4 month:12 pages:301-333 https://dx.doi.org/10.1007/s40864-021-00158-3 kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2027 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_2129 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 7 2021 4 12 301-333 |
allfields_unstemmed |
10.1007/s40864-021-00158-3 doi (DE-627)SPR045830487 (SPR)s40864-021-00158-3-e DE-627 ger DE-627 rakwb eng Haili, Chang verfasserin aut Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © The Author(s) 2021 Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. Metro (dpeaa)DE-He213 Energy-saving (dpeaa)DE-He213 Weak current system (dpeaa)DE-He213 Uninterruptible power supply (UPS) (dpeaa)DE-He213 Energy consumption prediction (dpeaa)DE-He213 Measuring instruments (dpeaa)DE-He213 Energy consumption quota (dpeaa)DE-He213 Enthalten in Urban rail transit Berlin : Springer, 2015 7(2021), 4 vom: Dez., Seite 301-333 (DE-627)823091856 (DE-600)2818317-4 2199-6679 nnns volume:7 year:2021 number:4 month:12 pages:301-333 https://dx.doi.org/10.1007/s40864-021-00158-3 kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2027 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_2129 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 7 2021 4 12 301-333 |
allfieldsGer |
10.1007/s40864-021-00158-3 doi (DE-627)SPR045830487 (SPR)s40864-021-00158-3-e DE-627 ger DE-627 rakwb eng Haili, Chang verfasserin aut Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © The Author(s) 2021 Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. Metro (dpeaa)DE-He213 Energy-saving (dpeaa)DE-He213 Weak current system (dpeaa)DE-He213 Uninterruptible power supply (UPS) (dpeaa)DE-He213 Energy consumption prediction (dpeaa)DE-He213 Measuring instruments (dpeaa)DE-He213 Energy consumption quota (dpeaa)DE-He213 Enthalten in Urban rail transit Berlin : Springer, 2015 7(2021), 4 vom: Dez., Seite 301-333 (DE-627)823091856 (DE-600)2818317-4 2199-6679 nnns volume:7 year:2021 number:4 month:12 pages:301-333 https://dx.doi.org/10.1007/s40864-021-00158-3 kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2027 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_2129 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 7 2021 4 12 301-333 |
allfieldsSound |
10.1007/s40864-021-00158-3 doi (DE-627)SPR045830487 (SPR)s40864-021-00158-3-e DE-627 ger DE-627 rakwb eng Haili, Chang verfasserin aut Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system 2021 Text txt rdacontent Computermedien c rdamedia Online-Ressource cr rdacarrier © The Author(s) 2021 Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. Metro (dpeaa)DE-He213 Energy-saving (dpeaa)DE-He213 Weak current system (dpeaa)DE-He213 Uninterruptible power supply (UPS) (dpeaa)DE-He213 Energy consumption prediction (dpeaa)DE-He213 Measuring instruments (dpeaa)DE-He213 Energy consumption quota (dpeaa)DE-He213 Enthalten in Urban rail transit Berlin : Springer, 2015 7(2021), 4 vom: Dez., Seite 301-333 (DE-627)823091856 (DE-600)2818317-4 2199-6679 nnns volume:7 year:2021 number:4 month:12 pages:301-333 https://dx.doi.org/10.1007/s40864-021-00158-3 kostenfrei Volltext GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2027 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_2129 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 AR 7 2021 4 12 301-333 |
language |
English |
source |
Enthalten in Urban rail transit 7(2021), 4 vom: Dez., Seite 301-333 volume:7 year:2021 number:4 month:12 pages:301-333 |
sourceStr |
Enthalten in Urban rail transit 7(2021), 4 vom: Dez., Seite 301-333 volume:7 year:2021 number:4 month:12 pages:301-333 |
format_phy_str_mv |
Article |
institution |
findex.gbv.de |
topic_facet |
Metro Energy-saving Weak current system Uninterruptible power supply (UPS) Energy consumption prediction Measuring instruments Energy consumption quota |
isfreeaccess_bool |
true |
container_title |
Urban rail transit |
authorswithroles_txt_mv |
Haili, Chang @@aut@@ |
publishDateDaySort_date |
2021-12-01T00:00:00Z |
hierarchy_top_id |
823091856 |
id |
SPR045830487 |
language_de |
englisch |
fullrecord |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">SPR045830487</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230509100253.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">211222s2021 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/s40864-021-00158-3</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)SPR045830487</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(SPR)s40864-021-00158-3-e</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Haili, Chang</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2021</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">© The Author(s) 2021</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Metro</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy-saving</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Weak current system</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Uninterruptible power supply (UPS)</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy consumption prediction</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Measuring instruments</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy consumption quota</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Urban rail transit</subfield><subfield code="d">Berlin : Springer, 2015</subfield><subfield code="g">7(2021), 4 vom: Dez., Seite 301-333</subfield><subfield code="w">(DE-627)823091856</subfield><subfield code="w">(DE-600)2818317-4</subfield><subfield code="x">2199-6679</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:7</subfield><subfield code="g">year:2021</subfield><subfield code="g">number:4</subfield><subfield code="g">month:12</subfield><subfield code="g">pages:301-333</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://dx.doi.org/10.1007/s40864-021-00158-3</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_SPRINGER</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_11</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2027</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2129</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4046</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">7</subfield><subfield code="j">2021</subfield><subfield code="e">4</subfield><subfield code="c">12</subfield><subfield code="h">301-333</subfield></datafield></record></collection>
|
author |
Haili, Chang |
spellingShingle |
Haili, Chang misc Metro misc Energy-saving misc Weak current system misc Uninterruptible power supply (UPS) misc Energy consumption prediction misc Measuring instruments misc Energy consumption quota Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system |
authorStr |
Haili, Chang |
ppnlink_with_tag_str_mv |
@@773@@(DE-627)823091856 |
format |
electronic Article |
delete_txt_mv |
keep |
author_role |
aut |
collection |
springer |
remote_str |
true |
illustrated |
Not Illustrated |
issn |
2199-6679 |
topic_title |
Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system Metro (dpeaa)DE-He213 Energy-saving (dpeaa)DE-He213 Weak current system (dpeaa)DE-He213 Uninterruptible power supply (UPS) (dpeaa)DE-He213 Energy consumption prediction (dpeaa)DE-He213 Measuring instruments (dpeaa)DE-He213 Energy consumption quota (dpeaa)DE-He213 |
topic |
misc Metro misc Energy-saving misc Weak current system misc Uninterruptible power supply (UPS) misc Energy consumption prediction misc Measuring instruments misc Energy consumption quota |
topic_unstemmed |
misc Metro misc Energy-saving misc Weak current system misc Uninterruptible power supply (UPS) misc Energy consumption prediction misc Measuring instruments misc Energy consumption quota |
topic_browse |
misc Metro misc Energy-saving misc Weak current system misc Uninterruptible power supply (UPS) misc Energy consumption prediction misc Measuring instruments misc Energy consumption quota |
format_facet |
Elektronische Aufsätze Aufsätze Elektronische Ressource |
format_main_str_mv |
Text Zeitschrift/Artikel |
carriertype_str_mv |
cr |
hierarchy_parent_title |
Urban rail transit |
hierarchy_parent_id |
823091856 |
hierarchy_top_title |
Urban rail transit |
isfreeaccess_txt |
true |
familylinks_str_mv |
(DE-627)823091856 (DE-600)2818317-4 |
title |
Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system |
ctrlnum |
(DE-627)SPR045830487 (SPR)s40864-021-00158-3-e |
title_full |
Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system |
author_sort |
Haili, Chang |
journal |
Urban rail transit |
journalStr |
Urban rail transit |
lang_code |
eng |
isOA_bool |
true |
recordtype |
marc |
publishDateSort |
2021 |
contenttype_str_mv |
txt |
container_start_page |
301 |
author_browse |
Haili, Chang |
container_volume |
7 |
format_se |
Elektronische Aufsätze |
author-letter |
Haili, Chang |
doi_str_mv |
10.1007/s40864-021-00158-3 |
title_sort |
energy-saving design and implementation in metro weak current systems: a case study of the kunming metro system |
title_auth |
Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system |
abstract |
Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. © The Author(s) 2021 |
abstractGer |
Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. © The Author(s) 2021 |
abstract_unstemmed |
Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption. © The Author(s) 2021 |
collection_details |
GBV_USEFLAG_A SYSFLAG_A GBV_SPRINGER GBV_ILN_11 GBV_ILN_20 GBV_ILN_22 GBV_ILN_23 GBV_ILN_24 GBV_ILN_31 GBV_ILN_39 GBV_ILN_40 GBV_ILN_60 GBV_ILN_62 GBV_ILN_63 GBV_ILN_65 GBV_ILN_69 GBV_ILN_70 GBV_ILN_73 GBV_ILN_95 GBV_ILN_105 GBV_ILN_110 GBV_ILN_151 GBV_ILN_161 GBV_ILN_213 GBV_ILN_230 GBV_ILN_285 GBV_ILN_293 GBV_ILN_370 GBV_ILN_602 GBV_ILN_2009 GBV_ILN_2014 GBV_ILN_2027 GBV_ILN_2055 GBV_ILN_2111 GBV_ILN_2129 GBV_ILN_4012 GBV_ILN_4037 GBV_ILN_4046 GBV_ILN_4112 GBV_ILN_4125 GBV_ILN_4126 GBV_ILN_4249 GBV_ILN_4305 GBV_ILN_4306 GBV_ILN_4307 GBV_ILN_4313 GBV_ILN_4322 GBV_ILN_4323 GBV_ILN_4324 GBV_ILN_4325 GBV_ILN_4335 GBV_ILN_4338 GBV_ILN_4367 GBV_ILN_4700 |
container_issue |
4 |
title_short |
Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system |
url |
https://dx.doi.org/10.1007/s40864-021-00158-3 |
remote_bool |
true |
ppnlink |
823091856 |
mediatype_str_mv |
c |
isOA_txt |
true |
hochschulschrift_bool |
false |
doi_str |
10.1007/s40864-021-00158-3 |
up_date |
2024-07-03T18:34:09.663Z |
_version_ |
1803583907083321344 |
fullrecord_marcxml |
<?xml version="1.0" encoding="UTF-8"?><collection xmlns="http://www.loc.gov/MARC21/slim"><record><leader>01000caa a22002652 4500</leader><controlfield tag="001">SPR045830487</controlfield><controlfield tag="003">DE-627</controlfield><controlfield tag="005">20230509100253.0</controlfield><controlfield tag="007">cr uuu---uuuuu</controlfield><controlfield tag="008">211222s2021 xx |||||o 00| ||eng c</controlfield><datafield tag="024" ind1="7" ind2=" "><subfield code="a">10.1007/s40864-021-00158-3</subfield><subfield code="2">doi</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(DE-627)SPR045830487</subfield></datafield><datafield tag="035" ind1=" " ind2=" "><subfield code="a">(SPR)s40864-021-00158-3-e</subfield></datafield><datafield tag="040" ind1=" " ind2=" "><subfield code="a">DE-627</subfield><subfield code="b">ger</subfield><subfield code="c">DE-627</subfield><subfield code="e">rakwb</subfield></datafield><datafield tag="041" ind1=" " ind2=" "><subfield code="a">eng</subfield></datafield><datafield tag="100" ind1="1" ind2=" "><subfield code="a">Haili, Chang</subfield><subfield code="e">verfasserin</subfield><subfield code="4">aut</subfield></datafield><datafield tag="245" ind1="1" ind2="0"><subfield code="a">Energy-saving design and implementation in metro weak current systems: a case study of the Kunming metro system</subfield></datafield><datafield tag="264" ind1=" " ind2="1"><subfield code="c">2021</subfield></datafield><datafield tag="336" ind1=" " ind2=" "><subfield code="a">Text</subfield><subfield code="b">txt</subfield><subfield code="2">rdacontent</subfield></datafield><datafield tag="337" ind1=" " ind2=" "><subfield code="a">Computermedien</subfield><subfield code="b">c</subfield><subfield code="2">rdamedia</subfield></datafield><datafield tag="338" ind1=" " ind2=" "><subfield code="a">Online-Ressource</subfield><subfield code="b">cr</subfield><subfield code="2">rdacarrier</subfield></datafield><datafield tag="500" ind1=" " ind2=" "><subfield code="a">© The Author(s) 2021</subfield></datafield><datafield tag="520" ind1=" " ind2=" "><subfield code="a">Abstract With the accelerated urbanization in China, along with the growing scale of the metro transportation network, the energy consumption of metro systems continues to increase. To face the tough challenge of climate change, China has put forward the goal of peak carbon emissions by 2030 and achieving carbon neutrality by 2060. Energy consumption has become a serious burden for metro operation companies, since 10.2% of the total operational budgets is spent on electricity. Thus the development of methods to realize energy saving and emission reduction has become a major challenge for metros. In this study we conduct an in-depth research and analysis on metro energy load classification and energy management, focusing in particular on the design and usage of power supply systems for metro weak current electromechanical systems, including tunnel fans, station air conditioners, station escalators, automatic ticketing equipment, screen doors, drainage pumps, sewage pumps, platform doors, communication systems, signals, integrated monitoring systems, automatic ticketing and various lighting equipment and facilities. It is proposed that the five weak current systems, namely platform doors, communication systems, signals, integrated monitoring and automatic fare collection, should adopt a backup power supply. In order to ensure the reliable operation of all weak current systems in the station, the traditional decentralized power supply mode is changed to a centralized power supply and uninterruptible power supply (UPS) (1 + 1) parallel double-bus system. At the same time, combined with the data on equipment quantity, station passenger flow and station building floorage, the Boruta algorithm is used to filter out the equipment related to station weak current energy consumption, and a principal component analysis (PCA) algorithm is used to further reduce the dimensions of the filtered features to reduce the algorithm overhead of the subsequent quota analysis model. The XGBoost algorithm is used to establish a prediction model for station weak current system energy consumption. Analysis shows that there is a strong correlation between the energy consumption quota and the equipment quantity as well as station building floorage. By setting different metering instruments for power supply circuits, the main energy consumption data are collected to meet the requirements for graded metering of metro energy consumption, and then the energy consumption quota for the station weak current system is reasonably predicted. By adding metering instruments to the power supply circuits of different areas and equipment, the energy consumption of the weak current system can be measured and monitored in different grades. The combination of the energy management platform and energy consumption quota provides the basis for energy management of each energy-consuming unit, and ultimately realizes energy saving and reduced consumption.</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Metro</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy-saving</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Weak current system</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Uninterruptible power supply (UPS)</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy consumption prediction</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Measuring instruments</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="650" ind1=" " ind2="4"><subfield code="a">Energy consumption quota</subfield><subfield code="7">(dpeaa)DE-He213</subfield></datafield><datafield tag="773" ind1="0" ind2="8"><subfield code="i">Enthalten in</subfield><subfield code="t">Urban rail transit</subfield><subfield code="d">Berlin : Springer, 2015</subfield><subfield code="g">7(2021), 4 vom: Dez., Seite 301-333</subfield><subfield code="w">(DE-627)823091856</subfield><subfield code="w">(DE-600)2818317-4</subfield><subfield code="x">2199-6679</subfield><subfield code="7">nnns</subfield></datafield><datafield tag="773" ind1="1" ind2="8"><subfield code="g">volume:7</subfield><subfield code="g">year:2021</subfield><subfield code="g">number:4</subfield><subfield code="g">month:12</subfield><subfield code="g">pages:301-333</subfield></datafield><datafield tag="856" ind1="4" ind2="0"><subfield code="u">https://dx.doi.org/10.1007/s40864-021-00158-3</subfield><subfield code="z">kostenfrei</subfield><subfield code="3">Volltext</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_USEFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">SYSFLAG_A</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_SPRINGER</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_11</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_20</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_22</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_23</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_24</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_31</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_39</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_40</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_60</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_62</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_63</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_65</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_69</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_70</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_73</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_95</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_105</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_110</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_151</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_161</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_213</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_230</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_285</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_293</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_370</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_602</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2009</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2014</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2027</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2055</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2111</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_2129</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4012</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4037</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4046</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4112</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4125</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4126</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4249</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4305</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4306</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4307</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4313</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4322</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4323</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4324</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4325</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4335</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4338</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4367</subfield></datafield><datafield tag="912" ind1=" " ind2=" "><subfield code="a">GBV_ILN_4700</subfield></datafield><datafield tag="951" ind1=" " ind2=" "><subfield code="a">AR</subfield></datafield><datafield tag="952" ind1=" " ind2=" "><subfield code="d">7</subfield><subfield code="j">2021</subfield><subfield code="e">4</subfield><subfield code="c">12</subfield><subfield code="h">301-333</subfield></datafield></record></collection>
|
score |
7.402915 |